Comments on Draft Safety Evaluation for Emergency Operating Procedures Generation Package (Suppl 1 to NUREG-0737 & NUREG-0899).Procedures Program Acceptable Except for Section 2.0 Items
ML20128K116
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 07/12/1985
From: Opeka J
CONNECTICUT YANKEE ATOMIC POWER CO.
To: Zwolinski J
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-0899, RTR-NUREG-737, RTR-NUREG-899 A02959, A04135, A04557, A2959, A4135, A4557, NUDOCS 8507240042
Download: ML20128K116 (70)


Text

,

e

+r e

CONNECTICUT YANKEE ATOMIC POWER COMPANY BERLIN. CONNECTICUT P O. BOX 270 HARTFORD, CONNECTICUT 06141-0270 July 12,1985 t w wose 203-665-5000 Docket No. 50-213 A02959 A04135 A04557 Director of Nuclear Reactor Regulation Attn:

Mr. John A. Zwolinski, Chief Operating Reactors Branch #5 U. S. Nuclear Regulatory Commission Washington, D. C. 20555

References:

(1) 3.

A.

Zwolinski letter to W.

G.

Counsil, dated December 17,1984.

(2)

W. G. Counsil letter to D. M. Crutchfield/3. R. Miller, dated September 1,1983.

(3)

D.

M.

Crutchfield letter to W.

G.

Counsil, dated June 12,1984.

(4)

3. F. Opeka letter to 3. A. Zwolinski, dated May 24, 1985.

Gentlemen:

Haddam Neck Plant Supplement I to NUREG-0737 Emergency Operating Procedures Generation Package Response to Draf t Safety Evaluation By Reference (1), the NRC Staff transmitted its draf t Safety Evaluation for the Haddam Neck Plant Emergency Operating Procedures Generation Package (PGP), which was submitted in Reference (2). The NRC Staff's draft Safety Evaluation concludes that the emergency operating procedures program for the Haddam Neck Plant is acceptable except for the items identified in Section 2.0.

During the process of preparing our response to these items, a decision was made to investigate whether the Haddam Neck Plant simulator would be completed on a schedule which would allow for the validation of the Emergency Operating Procedures (EOPs) and operator training on the plant-specific simulator. Based upon this investigation, we concluded that the Haddam Neck Plant simulator would not be completed on a schedule consistent with the requirement of the Order issued by the NRC Staff in Reference (3).

This Order requires the implementation of the upgraded EOPs prior to the start of Cycle 14 (i.e.,

approximately the beginning of March, 1986).

Since we believe that the utilization of the plant-specific simulator in the manner described above is the preferred approach, we indicated in Reference (4) that we would request a 8507240042 850712

)

hDR ADOCK 05000213 PDR

(

t

o 4

( modification to the subject Order and submit our response to Reference (1) by July 12,1985. The purpose of this submittal is to fulfill that commitment.

- Based upon the schedule to complete the installation of the Haddam Neck Plant simulator, upgraded EOPs could be implemented by September 1,1986 allowing for the validation of the EOPs and operator training on the plant-specific simulator. - This implementation date represents approximately a six-month slippage from the existing implementation deadline contained in the Reference (3) Order. The existing implementation schedule was based primarily upon the uselof static walkthroughs for the validation of EOPs and operator training in lieu of the plant-specific simulator. The advantages of training operators on the plant-specific simulator prior to the implementation of the EOPs are as follow:

classroom training and static walkthroughs would be reinforced by dynamic training on the simulator.

simulator training would provide the opportunity for the operators to exercise actual judgments and decisions using the revised EOPs.

simulator evaluations of shif t teams would allow for a better measure of training effectiveness than written exam / static walkthroughs only.

dynamic exercises would build operator confidence in the use of the revised EOPs. -

Based upon the above, we believe that the postponement of the implementation of the revised EOPs represents an improvement over the program that would otherwise be implemented if the existing implementation deadline is adhered to.

This is especially true since there is no intrinsic safety significance associated with the existing implementation date.

Accordingly, we hereby request a deferral of the EOP implementation date imposed by the Reference (3) Order from " prior to start of Cycle 14" to "by September 1,1986."

Since our efforts related to operator training are dependent upon the training program implemented (i.e., with or without the use of the plant-specific simulator), September 1,1985. represents the date by which our efforts become specifically related to the type of training necessary. We respectfully request, therefore, that the NRC Staff review this request and decide whether it will be approved by August 30,1985.

Responses to the items contained in Reference (1) are included as Attachment No. l.

Revision I to the PGP can be found in Attachment No. 2.

These

- attachments were prepared based upon the utilization of the plant-specific simulator and an associated EOP implementation date of September 1,1986. If our request is denied by the NRC Staff, these attachments will need to be revised.

Section 3.0 in the draf t Safety Evaluation states that "(f)uture changes to the PGP having safety significance should be brought to the attention of the NRC and will be reviewed in accordance with 10 CFR 50.59."

Revisions to the emergency operating procedures, but not the PGP, will be reviewed in accordance with 10 CFR 50.59.

Changes to the PGP will be performed in

^

i y=

's

_3_ -

accordance with normal plant administrative controls. We know of no criteria in Supplement I to NUREG-0737-or NUREG-0899 indicating that changes to the PGP should be documented pursuant to 10 CFR 50.59.

We trust.that this submittal adequately responds to Reference (1) and we look forward to your prompt attention to our request to extend the. EOP implementation date.

Very truly yours, CONNECTICUT YANKEE ATOMIC POWER COMPANY

}kA.b. -

3.F.Opek6 O

Senior Vice President 1

L

~,.

o Docket No. 50-213 Attachment No. I Haddam Neck Plant Responses to items Contained in Draf t Safety Evaluation July,1985

a s

A.

Plant Specific Technical Guidelines (P-STG) 1.

Deviations from and additions to the generic guidelines that are of safety significance must be identified in the P-STG. In addition, the analyses or technical justification that support the acceptability of these deviations and additions must be provided.

Response

As a comparison of the Haddam Neck Plant and the Westinghouse ERG reference plant yields no safety deviations, no specific analyses are required. The EOPs themselves are reviewed by NUSCO Safety Analysis Branch as discussed in Section A.3 of the Verification Program.

2.

Any additions to or deviations from the generic guidelines included in the P-STG should be verified / validated. This verification / validation step can be accomplished separately or as a part of the EOP verification / validation program. The PGP should discuss how the additions and deviations are to be verified / validated (NUREG-0899, Subsection 4.2).

The P-STG discussion indicates the use of the verification and validation Check-Off List. 1lowever, it is not cicar if these Check-Off Lists will be used as part of the P-STG development or as part of the verification / validation of the additions and deviations. This discussion should be expanded to provide a clear description of the verification / validation for the additions to and deviations from the generic guidelines.

Response

Any additions to or deviations from the generic guidelines will be verified / validated by a team of operators and the NUSCO Safety Analysis Branch. The method of validation will consist of table top, walk-through and plant-specific simulator. The check-of f lists will be used in the verification phase only.

(See Section A.3 of the Verification Program.)

B.

Plant-Specific Writer's Guide (P-SWG) 1.

Page layout is addressed in Section 3.2 (p.10) and in the EOP examples, Figures 1-5 on pages 11,12,14,15, and 17, respectively.

Ilowever, the following aspects of page layout shown in the EOP exampics should be discussed in the text.

(NUREG-0899, Subsection 5.5.2).

a.

Section 3.2 states that the page structure employs a pre-printed border to assure all margins are correctly malr.tained, but the examples only show pre-printed border margins at the top and bottom of the page. The P-SWG should provide guidance to ensure that sufficient side margins are also used to allow for binding and reproduction of the EOPs.

b.

The line spacing of the text should be specified to ensure proper spacing to enhance readability.

o

Response

Section 3.2 has been revised to specify margin and line spacing requirements.

2.

A number of conditions and requirements for steps, cautions and notes are addressed in the P-SWG (Section 4.2).

However, an additional requirement should be included in the P-SWG to reduce the possibility for an operator missing a portion of the step, caution or note. That is, a step, caution or note should be complete on a page and not continued onto a new page.

Response

Section 4.2.4 has been revised to require that cautions or notes will be lef t on the same page. To the extent practical, each step will also be completed on the same page.

3.

Note statements are intended to provide supplemental information and, therefore, should not include action steps.

Subsection 4.2.4 should be revised to preclude ti:e use of notes fcr procedure transitions. (NUREG-0399, Subsection 5.7.10).

Response

Section 4.2.4. has been revised as requested.

4.

Place-keeping aids can assist the operators in keeping track of their position within a procedure. They are of particular importance when performing concurrent steps or procedures and in the situations where the user's attention is diverted. The P-SWG should be revised to specify the use of some type of place-keeping aid. (NUREG-0399, Subsection 5.5.4).

Response

Section 4.4 has been added. It states that place-keeping aids will be inserted in each procedure transition point so that the procedure can be re-entered at any time. Steps in the procedure will be check marked when the step is complete.

5.

To provide consistency among and within EOPs, the headings to be used for the various sections of the EOPs, their sequences, format, and method of emphasis should be addressed in the P-SWG.

(NUREG-0399, Subsection 5.5.5,6, and 7).

Response

Section 4.5 has been added.

it states that headings will be in accordance with the Westinghouse ERGS. Information that should be

a

. focused on will be typed in capitalletters. Step numbers will be used to locate specific sections of the procedure.

6.

Section 5.0 discusses two types of format that may be used for the Critical Safety Function Status Trees. Since the P-SWG should give direction to the procedure writers, a single status tree format, and the intended location, should be chosen and specified in the P-SWG.

Response

Section 5.0 has been revised to specify a single status tree format.

7.

The P-SWG, Subsection 4.2.3, does a good job of describing and defining logic terms and their uses. However, it is suggested that this section be revised to include examples of logic terms or sequences that should be avoided because the statements can be confusing and ambiguous, such as combinations of AND and OR.

(NUREG-0399, Subsection 3.6.10).

Response

Section 4.2.3 has been revised as requested.

3.

The P-SWG, Subsection 4.2.5, describes the referencing of other procedures and steps. However, there are times when the referred step (s) should be incorporated in the EOP rather than cross-referenced. Decision criteria should be provided to the EOP writers to help them determine when to incorporate steps rather than cross-referencing to them. (NUREG-0899, 5.2.2 and 5.2.7).

Response

Section 4.2.5 has been revised to state that transition steps will be in accordance with the Westinghouse ERGS. They have been proven to be grammatically correct and step transitions are clear and concise.

9.

EOP references to out-of-the-way or infrequently used equipment, controls or displays should include information pertaining to their location. Decision criteria should be provided so that EOP writers can decide when to include location information. The format and contents of the location information should be specified.

(NUREG-0399, Subsection 5.7.11).

Response

Section 4.6 has been added. The location shall be described in a format that is consistent with standard plant nomenclature for the area it is located within.

l o

o.

i 10.

Action steps need to be written for a variety of situations. The P-SWG should address the formatting for the following types of action i

steps: (1) verification steps which are used to determine whether the objective of a task or a sequence of actions has been achieved, (2) steps which are repeatedly performed, (3) steps for which a number of alternative actions are equally acceptable, and (4) steps that are performed concurrently with other steps. (N UREG-0899, Section 5.7).

Response

Section 4.7 in the P-SWG has been revised to address verification steps, recurrent steps, equally acceptable steps and concurrent steps.

11.

To minimize confusion, delay, and errors in execution of EOP steps, the following concerns should be addressed in the P-SWG: (1) EOPs should be structured so that they can be executed by the minimum shif t staffing and minimum control room staffing as required by the Technical Specifications, (2) EOPs should be structured so that operator roics specified in the EOPs and in the training program are consistent with pre-established leadership roles and division of responsibilities, (3) action steps should be structured to minimize physical confilcts between personnel and to minimize the amount of movement needed for carrying out the steps, and (4) action steps should be structured to avoid unintentional duplication of tasks.

(NUREG-0399, Section 5.8).

4

Response

Section 4.8 has been added to address the above items.

12.

It is important that on operator be able to quickly access the relevant EOPs or portions of EOPs.

The P-SWG should address the accessibility of the EOPs and their various parts and sections.

(NUREG-0399, Subsection 6.1.4).

Response

Section 4.9 has been added to address the above item.

13.

All copies of the EOPs should be legible, therefore the quality of the reproduced copies of the EOPs should be addressed in the P SWG.

(NUREG-0399, Subsection 6.2.2).

Response

Section 4.9.1 has been added to address legibility.

14.

Il major changes occur in the plant design, the technical guidelines, the Technical Specifications, the P-SWG, or other plant procedures, i

o

. then the EOPs may need to be revised. These revisions should be made in accordance with the PGP. Instructions to effect this should be included in the P-SWG or elsewhere in the PGP. (N UREG-0899, Subsection 6.2.4).

Response

Section 4.10 has been added to address updating of EOPs.

15.

The step numbering shown in Figure 5, and discussed in Section 3.3, requires operators to review the document to obtain the entire step identifier, and does not provide the operators with a good perspective of where they are in relation to the entire document. The PGP should be revised to specify a numbering system that allows the complete step identifier to precede each step, such as substep "a" of step 2 would be written 2.a.

(NUREG-0399, Subsection 5.5.5).

Response

Section 4.11 has been added to address divisions, headings and numbering. The numbering system wl!! be consistent with that of the Westinghouse ERGS.

C.

Validation / Verification 1.

The process for ensuring written correctness and technical accuracy should be formalized with the responsibilities and roles of the participants described in the PGP.

Response

Section A.2.2 of the Verification Program was revised to indicate that written correctness and technical accuracy will be verified by licensed operators.

2.

The use of the verification process for revisions should be discussed in the PGP. This should include the criteria to determine when verification is required.

Response

Section A.4 of the Verification Program was added to indicate that any changes will be verified correct and validated to insure they provide proper guidance.

3.

The PGP lists three possible methods that can be used for validation of the EOPs, but does not indicate which ones or what combinations are planned to be used at lladdam Neck. The validation program should be more formalized and thoroughly described in the PGP, including the roles and responsibilities of the participants.

.s I t

Response

A summary of the validation program has been added.

4.

The licensee will use a plant-specific simulator for validation when it becomes available. The PGP should identify when this simulator will be available (before or after implementation of the EOPs). If the EOPs are going to be implemented before the site specific simulator is available, the PGP should describe how the EOPs will be validated prior to implementation.

[

Response

it was originally intended that the plant-specific simulator would be utilized to validate the revised EOPs after the EOPs were implemented.

We now plan to validate the EOPs on our plant-specific simulator prior to the implementation of the revised EOPs.

The PGP has been revised accordingly.

[

5.

The discussion on use of scenarios to validate the EOPs on a I

simulator should be expanded to indicate that all EOPs will be exercised, including multiple failures (sequential and simultaneous),

and to include the criteria to be used for selecting scenarios.

Response

See reply to item 3.

The Validation Program indicates that a wide l

variety of scenarlos, which include multiple failures, will be tested on the plant-specific simulator.

i 6.

Future revisions to EOPs may require validation. The PGP should

[

includes (1) criteria or methods that will be used for determining whether validation of each revision is needed and (2) a description of how you will determine the appropriate validation when needed.

Response

See reply to Item 2. All changes will be verified / validated.

p 7.

The EOP will require a certain number of operators to carry out the I

various activities and steps swcified. The PGP should indicate that the EOPs will be exercised, curing plant walk-throughs and simulator exercises, with the minimum control room staff size as required by the Technical Specifications. ' (NUREG-0899, Subsection 3.3.5.1).

i

Response

This has been addressed in the validation summary.

I

o c-e 8.

The control room instrumentation and controls referred to in the EOPs need to be evaluated in terms of their adequacy and their correspondence with the actual instrumentation found in the control room, as follows:

a.

The PGP should describe the plan for determining the operators' information and control needs.

(NUREG-0899, Subsection 3.3.5.1).

b.

The PGP should describe the method (s) that will be used to determine whether the actual control room instruments and controls meet the information and control needs.

(NUREG-0899, Subsection 3.3.5.1).

Response

The PGP has been revised to state that the validation program will be used to determine whether the actual control room Instruments and controls meet the information and control needs of the operators.

Any inadequacies will be identified and resolved.

The Control Room Design Review will provide additional assurance that the tasks required to be accomplished by the operators can be carried out and the actual control room instruments and controls provide the necessary information and controls for the operators.

Any deficiencies identified will be addressed.

D.

Training Program 1.

The PGP should state training objectives and describe how these objectives will be accomplished by the training program.

Response

The training section has been expanded to include the training objectives and a description of how these objectives will be accomplished.

2.

The training program should include a statement of commitment that all operators will be trained on the revised EOPs prior t7 their implementation. (NUREG-0899, Section 2.3).

Response

The training section has been expanded to include this statement.

, 3 3.

' Although the PCP states that a generic slinulator will be used for operator training, the training program description should be expanded to address the following items:

a.

Discuss the method to be used to train the operators in areas where the simulator is not like the centrol room or does not react like the plant, and in parts of the EOPs that cannot be run on the simulator.

j I

Response

i It was never intended that a generic simulator be used for operator training.

Since a plant-specific simulator will be utilized for operator training, no further discussion is necessary.

b.

Indicate that operators will be tralned to use the EOPs as a team and that each operator is trained in the role that he would be expected to take in case of an actual emergency.

Response

i I

The training section has been expanded to address this.

c.

Indicate the use of a wide variety of scenarios to fully exercise the EOPs on the simulator and thus expose the operators to a l

wide variety of EOP uses.

Itesponse i

The training section has been expanded to address this, d.

Indicate that all EOPs will be exercised by all operators.

flesponse All operators will be tralned on the revised EOPs. Ilowever, a wide variety of EOPs, in lieu of all EOPS, will be exercised by the l

operators. (See item 3.c above.)

[

i 4.

The PGP should state that the operator's knowledge and performance of COPS will be evaluated af ter training and that appropriate follow-up training will be conducted in deficient areas.

[

ltesponse t

l The training section has been expanded to address this.

l l

l l

l 4

F

'o.

Docket No. 50-213 Attachment No. 2 Iladdam Neck Plant Emergency Operating Procedures Cencration Package llevision 1 July,1935

b Emergency Operating Procedures l

Generation Package f

l PURPOSE i

The purpose of this Emergency Operating Procedures Generation Package is to describe the program of the development and impleirentation of new symptom-oriented emergency procedures from the Westinghouse Owners Group Emergency l

Guidelines for the Connecticut Yankee Atomic Power Company plant at fladdam Neck.

l The Connecticut Yankee plant is a Westinghouse pressurized reactor with four loops having loop stop valves. The licensed power is 1825 megawatt thermal with once through cooling. The Connecticut river is the ultimate heat sink.

Tho Engineered Safety Features at the lladdam Neck plant consist of: two charging pumps: two high pressure safety injection pumps: two low pressure safety injection pumpst two residual heat removal pumps and heat exchangeral two emergency diesel generators; four service water pumpel four recirculating cooling fans for the containment; two station batteries: and all of the necessary electric busses, pipon, controls and instrumentation to provide for two independent trains of equipment for mitigating accident conditions.

l l

l l

i l

Page 1 of 50 i

i SCOPE This package has been developed to meet the requirements of USNRC Ceneric Letter 82-33 and other related documents.

It is intended to outline the methods and reference material used to produce Emergency Operating Procedures (EOPs) and to verify, validate and implement them in an orderly and understandable manner. There will also be documentation of the conversion from the Generic Emergency Recovery Guidelines produced by the Westinghouse Owners I

Group Subcommittee, as well as documentation of the verification and validation of the end product.

l This package consists of the following parts:

1.

Introduction 2.

Plant Specific Technical Guidelinos 3.

Writers Guide for Emergency Operating Procedures 4.

Verification Program 5.

Validation Program 6.

Training Program i-I l

i I

l l

I t

Page 2 of 56

o l

l l

l PLANT SPECIFIC TECHNICAL CUIDELINES i

The following program for converting the Westinghouse Emergency Response Guidelines into Emergency Operating Procedures will be used at the Connecticut Yankee Atomic Power Company.

l l

l The existing Emergency Operating procedures will remain in effect until the new Emergency Operating Procedures program is completed.

l l

The reference material used to make the conversion from the existing E0Ps to a new set of more symptom-oriented E0Ps will encompass but not be limited tot 1.

The existing E0Ps 2.

Adaptation of the Westinghouse ERPs 3.

Plant Technical Specifications 4.

Facility Description and Safety Analysis 5.

As built plant drawings j

6.

Experience gained from past operation of Connecticut Yankee and any other similar plant l

7.

Any other pertinent information l

Those people involved in the process of writing the E0Ps will note cach step in the ERCS and will write a justification for any deviation from the ERCS used to make the E0Ps more plant specific. As an example, the ERCS may have steps directing an operator on proper vniving of a boric acid injection system while Connecticut Ynnkea has no comparable system.

All such changes shall be documented on a form similar to that shown below.

I l

t l

i l

Page 3 of 56 l

o Step Documentation:

E0P Rev.

Page of E0P Stept ERG Stept Justification for difference E0P Writer Date The Writers Guide which is part of this Generation Package will be used to formulate the Emergency Operating procedures in a uniform pattern so that all of the series of procedures will have common features.

Tho Veritication and Validation Checkoff sheets will be used no that a documentation of the procons used for the entire davolopment of the E0Pn may be kept on record for future reference.

i l

i l

l l

l l

\\

l Page 4 of 56

o I

CONNECTICUT YANKEE ATOMIC POWER COMPANY WRITERS CUIDE FOR EMERGENCY RESPONSE PROCEDURES b

t l

i i

b

%r,

E o

?

f ERP WRITERS CUIDE TABLE OF CONTENTS 1.

Purpose and Scope 2.

ERP Designation and Numberina 2.1 Procedure Title 2.2 Procedure Numbering 2.3 Revision Numbering 2.4 Page Numbering and Identification j

3.

Format 3.1 Procedure Organization 3.2 Page Formats 3.3 Instructional Step Numbering l

4.

Writing the Procedure i

i 4.1 Cover Sheet 4.2 Operator Actions 4.2.1 Instruction Steps. Left-Hand Column 1

4.2.2 Instruction Steps. Right-Hand Column I

4.2.3 Use of Logic Terme 4.2.4 Notes and Cautions 4.2.5 Transitions to Other Procedures or Steps 4.2.6 Component Identification 4.2.7 Level of Detail 4.3 Foldout Page 4.4 Place-Keeping Aides 4.5 Section Headings 4.6 Infrequently Used Equipment 4.7 Content of E0Ps 4.8 Control Room Staffing 4.9 Accessibility / Legibility 4.10 Updating E0Ps 4.11 Divisions. Headings and Numbering

[

5.

Status Tree Format f

6.

-Mechantes of Style 6.1 Spelling 6.2 Punctuation

[

6.3 Capitalisation f

6.4 Vocabulary 6.5 Numerical Values 7

6.6 Abbreviations and Acronyms l

t Page 5 of 56

o I

i 1.

PURPOSE AND SCOPE l

l The purpose of this document is to provide administrative and techr.ical guidance on the preparation of Emergency Response Procedures. This guide applies to both Optimal Recovery Procedure and Function Restoration Procedures.

2.

ERP Designation and Numberig ERPs are plant specific emergency procedures which specify operator actions to be taken during plant emergency situations to return the plant to a safe stable condition.

Each procedure shall be uniquely identified to facilitate preparation, review, use and subsequent revision.

2.1 Procedure Title Every separate procedure shall have its own descriptive name which summarizes the scope of that procedure, or states the event which it is intended to mitigate.

2.2 Procedure Numbering Every separate procedure shall have its own alpha-numeric designation to supplement the descriptivu title. Alpha designators are to be ansigned according to the definitions provided in Table 1.

Numeric designators are assigned sequentially in order of procedure development.

Each "ES" numeric shall consist of the number designator of the referenco "E" procedure, plus a decimal integer, again assigned sequentially.

Page 6 of y

TABLE I DEFINITIONS OF LETTER DESIGNATORS FOR ERPs a procedure for diagnosis or mitigation of design E

basis events.

ES - a procedure which supplements the actions of an "E" procedure.

ECA - a procedure containing tasks for mitigation of events significantly beyond the design basis that are not easily covered in the E's or ES's or which may complicate or reduce the effectiveness of the E procedure if included therein.

FR - a procedure to address or respond to a challenge to a Single Critical Safety Function (CSF).

designator for SUBCRITICALITY CSF S

designator for CORE COOLING CSF C

designator for INTEGRITY CSF P

designator for llEAT SINK CSF 11 designator for CONTAINHENT CSF Z

designator for INVrNTORY CSF I

Page 7 of $6

2 "ECA" procedures shall each have a number designator, and related sub-procedures shall be assigned additional decimal integers.

Alpha and numeric designators shall be separated by a hyphen.

Examples: E-0 (Zero designates the diagnostic procedure)

ES-1.1 t

ES-1.2 l

ES-1.3 ECA-1 ECA-1.1 Function Restoration Procedures shall all be designated by the letters FR plus an additional letter which corresponds to the respective Critical Safety Function. All of the separate procedures related to a particular Safety Function are assigned decimal numbers in increasing order. Typically, the first (number.1) procedure for each safety function corresponds to the RED condition.

The proceduro letter and decimal number are separated from the FR designator by a hyphen.

Examples: FR-S.1 FR-S.2 FR-0.1 (Zero designates the diagnostic, status tree procedure.)

2.3 Revision Numbering The single digit following the abbreviation "Rev." will be used to designate the revision level of each procedure after initial version.

Page 8 of $6

7_

e.

e Each revision number will be accompanied by a date, printed immediately below it.

Exampics: Rev. 2 1 MAY 1985 2.4 Page Numbering and Identification Each page of a procedure will be identified by the procedure title, alpha-numeric designator, revision number and date in a title block at the top of the page.

Each page number will be specified as of

, centered on the bottom of the page. The last page of each procedure (Page Z of Z) will additionally be identified by the word "END" following the last instruction step.

3.

Format The following format is to be applied consistently to all Emergency Response Procedures.

3.1 Procedure Organization All Optimal Recovery Procedures (E, ES, ECA) will have three (3) sections. The Cover Sheet will summarize procedure intent and state either entry symptoms or means of entry. The Operator Actions will comprise the bulk of each procedure and present the actual stepwise guidance. A Foldout Page will summarize information which is continually required for operator guidance.

A single Foldout Page will be used for each E-series and ECA-series.

The function Restoration Procedures will have only the Cover Sheet and Operator Actions.

Page 9 of 56

3.2 Page' Formats All pages of the Emergency Response Procedures will use the same page structure except the Foldout Page which is discussed below. This page structure employs a pre-printed border to assure all margins are correctly maintained, (margin right side ~ 1/4'] margin lef t side ~

l 1/3") and pre-printed designator boxes and page ' cues to assure completeness and consistency.

(See Figure 1.)

Line spacing will be.

approximately 3/16".

The pages for presentation of operator action steps will use a two-column format within the pre-printed border. The left-hand column is designated for operator actions, and the right-hand column is designated for contingency actions when the expected response is not

,obtained. These pages will use pre-printed title blocks above the separate columns (including the " step" column) for uniformity (see Figure 2.)

The Foldout Page does not use the bordered-page format.

It is intended to summarize only that information which.an operator should have continuously available, so page content will vary by procedure.

Each Foldout Page shall be titled at the top in large bold type

" FOLDOUT FOR E-X SERIES PROCEDURES."

3.3 ' Instructional Step Numbering Procedure steps will be numbered as follows:

1.

High-level step a.

Substep Substeps are lettered sequentially according to expected order of performance.

If the order of substep performance is not important, then the substeps are designated by bullets (o).

Page 10 of '56 l

.-..._1 65 fc 11 sg P l

{:,1 2

fo l.

i' 5

i q:

i I

1 i

I tamroF egaP detnirperP 1 erugiF i

I-i 1

l l

l I

etaD/.oN noisiveR seltiT/motpmyS srebmuN 1

Numbers Symptom / Titles Revision No./Date STEP ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINED

^

Figure 2 Preprinted Page (2-column) Format i

of i

i l

Page 12 of ~ 56

h l

l This same numbering scheme is to be used in both the right and left columns of the procedures.

?

4.

Writing the Procedure The-following format is to be applied consistently when writing Emergency Response Procedures.

4.1 Cover Sheet 1

Each cover sheet will contain two explanatory sections in addition to procedure and page designators. The first will be titled " PURPOSE" and will briefly describe what the procedure is intended to do for the operator.

The second section is a summary of those symptoms which require entry into the procedure. This section will be titled

" SYMPTOMS OR ENTRY CONDITIONS".

Certain procedures such as E-0 and ECA-2 can be entered purely based on symptoms; for these procedures, a symptom summary is sufficient (see Figure 3).

For other procedures, which can only be entered by transition from previous procedures, a

~

summary of the entry conditions (and procedure / step) should be

-provided (see Figure 4).

l 4.2 Operator Actions t

Steps directing operator action should be written in short and precise language. The statement should present exactly the Task which the operator is to perform. The equipment to be operated should be specifically identified, and only these plant parameters shculd be specified which are presented by instrumentation available ~in the control room.

(If possibit,'use of qualified instruments is preferred).

It is not necess'ary to state expected'reaults.cf routine

~

tasks.

l i

l Page 13 of 56 u

l

Numbers ~

Symptom / Titles Revision No./Date E-O' REACTOR TRIP OR SAFETY INJECTION 5 July 1982 EMERGENCY INSTRUCTION E-0 REACTOR TRIP OR SAFETY INJECTION A.

. PURPOSE The purpose of this procedure is to verify proper response of the automatic protection systems following manual or automatic actuation of a REACTOR TRIP or SAFETY INJECTION, to assess plant conditions, and to identify the appropriate recovery procedures.

B.

SYMPTOMS: (1)-

'I.

Following are symptoms of a reactor trip:

a.

~Any reactor trip annunciator lit b.

Rapid decrease in neutron level indicated by nuclear instrumentation c.

All shutdown and control rods are fully inserted. Rod bottom 3,

i lights are lit q

d.

Rapid decrease in unit load to zero power i

/,.

II..

Following are symptoms of reactor trip and safety injection:

-g, a.

-Any SI annunciator lit b.

SI pumps in' service I

c.

(Enter other plant specific symptoms)

'W Figure 3 Cover Sheet Example for E-0 p;;.

of 5

Page 14 of '56 1;

e.:

i s Numbers Symptom / Titles-Revision No./Date ECA-3 SGTR CONTINCENCIES Basic 1 Sept. 1981

.A.

PURPOSE The purpose of this procedure is to provide recovery from transients for which E-3. Steam Generator Tube Rupture,-and ES-3.3, SGTR With Secondary Depressurization are not applicable.

B.

SYMPTOMS OR ENTRY CONDITIONS The symptoms required for the use of the procedure may occur at many times during the E-3 and ES-3.3 recovery actions. _The symptoms are included in steps 11, 13, 15 and 16 of E-3, Steam Generator Tube Rupture, and steps 11, 14, 16 and 17 of ES-3.3, SGTR With Secondary Depressurization.

Figure 4 Cover Sheet Example for ECA-3 of Page 15 of.56

o-All steps are assumed to be performed in sequence unless stated otherwise in a preceding NOTE or preceeded by a bullett (see Section 4.2.4).

To keep the individual steps limited to a single action, or a small number of related actions, any complex evolution should be broken down into composite parts.

Actions required in a particular step should not be expected to be complete before the next step is begun.

If assigned tasks are short, then the expected action will probably be completed prior to continuing. However, if an assigned task is very lengthy, additional steps may be performed prior to completion.

If a particular task must be completed prior to continuation, this condition must be stated clearly in that step or substep.

Refer to Figure 5 as an example of the format for representing operator actions in the following sections.

1 4.2.1 Instruction Steps, Left-Hand Column The left-hand column of the two-column format will be used for operator instruction steps and expected responses. The following rules of construction apply:

o Expected responses to operator actions are shown in ALL CAPITAL LETTERS.

o If a step requires multiple substeps, then each substep will have its own expected response.

o If only a single task is required by the step, then the high level step contains its own EXPECTED RESPONSE.

o Left-hand column tasks should be specified in sequence as if they could be performed in that manner.

The user would normally move down the left hand column when the expected response to a particular step is obtained.

Page 16 of 56

Figure 5 Instruction Steps Example Numb'ers Syr.ptom/ Titles Revision No./Date E-1 LOSS OF REACTOR COOLANT 5 July 1982 STEP ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINED NOTE Foldout page should be open 1

Check if RCPs.Should Be Stopped:

a. High-head SI pumps running -
a. DO NOT STOP RCPs. Go to CHECK FOR. FLOW OR PUNP

. step 2.

BREAKER INDICATOR LIGHTS LIT

b. RCS pressure - EQUAL T0
b. DO NOT STOP RCPs. Go to OR LESS THAN 1700 step 2.

2 Check RWST Level: - GREATER THAN Go to step 20.

130,000 gal.

3 Check Ccntainment Sump Level:

Rediagnose event, go to E-0,

-increasing REACTOR TRIP OR SAFETY INJECTION,~ STEP 32.

CAUTION Alternate water sources for AFW pumps will be necessary if CST level is low.

4 Check Steam Generator Levels:

a. Narrow range level - GREATER
a. Maintain full AFW flow until THAN 70,%

narrow range level is greater (3) %

b. Throttle AFW flow to maintain
b. Il[ narrow range level in one narrow range level at 50%

steam generator continues to increase, THEN go to E-3, STEAM GENERATOR TUBE RUPTURE, step 1.

of Page -17 of 56

~ _, _ -

ra t

2:

~

o-When the expected response is not obtained, the user is expected to move'to the right-hand column for contingency instructions.

s o

All procedures should end with a transition to either another procedure or.to some normal plant procedure.

4.2.2-Instruction Steps, Right-Hand Column The right-hand column is used to present contingency actions which are to be taken in the event that a stated condition, event, or-task in the left-hand column does not represent or

. achieve the expected result.

Contingency actions will be specified for all steps or substeps for which the task

-requirement might not be satisfied.- The following rules apply to the right-hand column:

o Contingency actions should identify directione to override automatic controls and to initiate manually what is normally initiated automatically.

o Contingency actions should be numbered consistently with the expected response / action for substeps only. A contingency for a single-cask high-level step will not Ebe separately numbered but will appear on the same line as its related step.

o The user is expected to proceed to the next numbered step or substep in the left-hand column after taking contingency action in the right-hand column.

o As a general rule, all contingent transitions to other.

I l

procedures take place out of the right-hand column..

I (Pre-planned transitions may be made from the left-hand L

l column.)

1 l

l-Page 18 of 56

y e

o If a contingency action cannot be completed, the user is expected to proceed to the next step or substep in the left-hand column unless specifically instructed otherwise.

When writing the procedure, this rule of usage should be considered in wording subsequent left-hand column instructions.

o If a contingency action must be completed prior to continuing, that instruction must appear explicitly in the right-hand column substep.

4.2.3 Use of Logic Terms The logic terms AND, O_R, NOT, E, IF NOT, WHEN, and THEN, R

are to be used to describe precisely a set of conditions or a sequence of actions. Logic terms will be highlighted for emphasis by capitalizing and underlining.

(See Figure 5.)

The two-column format equates to the following logic:

"IF NOT the expected response in the left-hand column. THEN perform the contingency action in the right-hand column."

g The logic terms should not be repeated in the right-hand column.

?

When action steps are contingent upon certain condit8ons, the step shall begin with the words ))[ or WHEN followed by a description of those conditions, a comma, the word THEN, and the action to be taken.

))[ is used for an unexpected, but possible condition.

WHEN is used for an expected condition.

IND calls attention to combinationf of conditiona and shall be placed betweer each condition.

If more than three conditions are to be combined, a list format is preferred, jy! implies alternative combinations or conditions. fylmeans either one, or the other, or both (inclusive).

Page 19 of 56

IF NOT should be used when an operator must respond to the second of two possible conditions, jg[ should always be used to specify the first condition.

(The right-hand column of the two-column format contains an implicit IF NOT.)

Combinations of Logic Terms - the use of AND and fyt along with IF and THEN, within ne same steps should be avoided.

When AND and fgt are used together, the logic statements can be confusing and ambiguous.

For example, jg[ condition A AND condition B ))t condition C occurs, THEN go to Step 5.3.6.

4.2.4 Notes and Cautions Because the present action-step wording is reduced to the minimum essential, certain additional information is sometimes desired, or necessary, and cannot be merely included in a background document. This non-action information is presented as either a NOTE or a CAUTION.

(See Figure S.).

To distinguish this information from action steps, it will extend across the entire page and will immediately precede the step'to which it applies. Each category (NOTE or CAUTION) will be preceded by its descriptor in large, bold letters. Multiple statements included under a single descriptor heading shall be separately identified by noting them with bullets.

CAUTION denotes some potential hazard to personnel or equipment associated with the following instructional step.

NOTE is used to present advisory or administrative information necessary to support the following action instruction.

Page 20 of 56 L

e o

As a general rule, neither a CAUTION or NOTE will be used to replace an instruction / operator action step. Notes should not be used for procedure transitions.

CAUTIONS or NOTES should be complete on a page and not continued onto a new page.

4.2.5 Transitions to Other Procedures or Steps Certain conditions require use of a different guideline or step sequence. Transitions are specified by using the words "go to" followed by the procedure designator, title (in CAPITAL LETTERS) and step number.

Example: Go to ES-0.2, REACTOR TRIP RESPONSE, Step 1.

Transition steps will be in accordance with WOG Guidelines.

I Transitions to a different step in the same procedure are specified in a similar manner.

Example: Go to Step 20, 4.2.6 Component Identification Equipment, controls and displays will be identified in

" operator language" terms.

Standard abbreviations which may be used throughout the procedures are listed alphabetically in Table 2.

Since similar components are used in both primary and secondary systems, it is always necessary to clarify the location, even if the wording appears redundant.

Example: PRZR PORV vs. SG PORV identifies the pressurizer power operated relief valve as distinct from a steam generator power operated ralief valve.

I i

Page 21 of 56

T e.

4.2.7 Level of Detail To allow an operator to efficiently execute the action steps in a procedure, all unnecessary detail must be removed. Any information which an operator is expected to know (based on his training and experience) should not be included. Many actuation devices (switches) in the control room are similar, even though the remotely performed functions are not, so certain action verbs listed here are recommended.

Use " start /stop" for power-driven rotating equipment.

o o

Use "open/close/ throttle" 'or valves, o

Use " trip /close" for electrical breakers.

(LOCK OUT for breaker switches with a pull-to-lock feature.)

Use " place in standby" to refer to equipment when o

actuation is to be controlled by automatic logic circuitry.

4.3 Foldout Page Only a single foldout page will be supplied for each "E-series" and "ECA-series" of procedures. The sheet will be numbered as the final page of the last procedure in the series.

(That procedure will still be captioned with "END" after the last instruction step.) The foldout page will be titled " FOLDOUT FOR EX SERIES PROCEDURES", (see Figure 6) and will use a single column format (vs. two-column).

Each set of operator information will be numbered sequentiaily and have an explanatory title. The title will be capitalized and underlined for emphasis.

Previously supplied guidance on writing instructional steps is applicable (Section 4.2), with the exception of right-hand column (contingency) instructions.

Page 22 of 56

T

's.

4.4 Place-Keeping Aids Placekeeping aids will be inserted in each procedure transition point so that the procedure can be re-entered at any time.

Steps in the procedure will be check marked when the step is complete.

4.5 Section Headings Headings will be in accordance with the Westinghouse ERG Guidelines.

Information that should be focused upon will be typed in capital letters.

Step numbers will be used to locate specific sections of the procedure.

4.6 Infrequently Used Equipment The location of equipment that is infrequently used should be specified in the EOPs so that an operator can find the proper location in a minimum of time. The location should be' described in a ' format that is consistent with standard plant nomenclature for the area it is located within.

4.7 Content of E0Ps 4.7.1 Verification Steps Verification steps are used to determine whether the objective of a task or a sequence of actions has been achieved. There are three common methods for verification:

Checking that an action has resulted in a command signal to a piece of equipment. The operator should not rely on this type of check, but should use a more positive indication.

l Page 23 of 56 L

r o

Checking that an action has resulted in a positive indication that the equipment has responded to a command.

Checking that an operator has correctly performed an action or has carried out a series of steps.

These types of verification steps sh'ould be used where appropriate in the procedures to ensure that equipment responses and operator actions have occurred and are correct.

4.7.2 Equally Acceptable Steps Equally acceptable steps are those for which any one of several alternative steps or sequence of steps may be equally correct. For these steps, the operator should always be directed to carry out one of the alternative steps (or sequences), but should also be given the other alternatives when it is possible that the designated steps (or sequence) cannot be done (e.g., a designated piece of equipment is unavailable).

4.7.3 Recurrent Steps Recurrent steps are those that require the operator to repeatedly perform a given action, typically, monitoring or controlling some plant parameter.

(e.g., " Check condensate storage tank level every 30 minutes").

For these steps, the operator should be told when or how often the steps are to be performed, be reminded to perform the steps, and be told the conditions for which the steps should no longer be carried out.

Page 24 of 56

4 4.7.4 Concurrent Steps Concurrent steps are those which have to be performed at the same time. The E0Ps should explicitly indicate which steps are concurrent so that operators can easily refer to both (or all) sets of steps. The maximum number of concurrent steps should not be beyond the capability of the control room staff to perform them.

4.8 Control Room Staffing and Division of Responsibilities This section considers staffing in the control room, and the division of responsibility and leadership among the control room staff as it applies to the use of E0Ps. The variable nature of control room L

events and staff capabilities, and the turnover in control room shift crews, make the goals of this section difficult to achieve. However, the following guidelines are important to the efficient and accurate I

-development, and execution of E0Ps, and should be followed to the extent possible.

l 4.8.1 Consistency Between Staffing and Procedures The E0Ps should be structured so that the number of people required to carry out specific actions, concurrent actions, and other responsibilities, doea not exceed the minimum shift staffing required by a plant's Technical Specifications.

4.8.2 Division of Responsibility i

During an emergency, it is vital that the actions of the control room staff be carried out efficiently and accurately. This will be determined in part by the quality of the E0Ps and the training of the operators. However, for the benefits of good procedures and training to be realized.

l it is important that control room personnel operate as a i

team with pre-established leadership roles and divisions of l

responsibility.

i Page 25 of 56

a 4.8.3 Staffing of the Control Room The number and qualifications of personnel available in the control room will determine the number of sequential actions, concurrent actions and other responsibilities that can be carried out, and the efficiency with which they can be carried out.

The following goals should be considered in writing the E0Ps:

Minimize physical conflicts between personnel (carrying out actions at the same locations at the same time, or crossing paths),

Avoid unintentional duplication of tasks by control room personnel, Ensure that the control room supervisor should be able to keep up with staff actions and plant status.

4.9 Accessibility / Legibility Accessibility refers to the case with which the operator can identify and access the relevant Emergency Operating Procedures. The E0Ps should be uniquely identifiable and should be labeled to facilitate rapid identification and access to any procedure or any part of a procedure.

4.9.1 The E0P's should be printed in a cicar, concise manner and the quality of the reproduced copies will be sufficient to insure they are legible to the operators.

Page 26 of 56

f b

4.10 Updating E0Ps When changes occur in the plant design, Technical Specifications, Technical Guidelines, Writer's Guide, other plant procedures or control room that will affect the E0Ps, the E0Ps should be revised on a timely basis to reflect these changes.

In addition, when operating and training experience, simulator exercises, control room walk-throughs, or other information indicate that incorrect or incomplete information exits in the E0Ps, the E0Ps should be revised on a timely basis. These changes should be reviewed to ensure consistency with the Technical Guidelines and the Writer's Guide.

Operators should be encouraged to suggest improvement to E0Ps.

4.!! Devisions, Headings and Numbering The manner in which the text is organized and divided should be evident through the use of headings and an alphanumeric numbering system.

The system used should provide operators with a logical means of determining where they are located in relationship to the overall document.

Further, the approach selected should allow operators to identify steps in the procedures. The numbering system will be consistent with that of the Westinghouse ERC guidelines.

5.

Status Tree Format Critical Safety Function Status Trees will be presented in the format and orientation shown in Figure 7.

Color-coding and line-pattern coding shall both be used from the last branch points to the termini.

(See Figure 8.)

All text on Status Trees shall be at least as legible (type size and l

spacing) as the instruction steps in the procedures.

I L

Each status tree shall have a designator block identical to that used in the standard guidelino format, and containing the same information.

I Page 27 of 56

0 o.

TABLE 2 ABBREVIATIONS USED IN PROCEDURES alternating current (electrical power) ac auxiliary feedwater AFW anticipated transient without scram ATW boric acid (storage) tank BAT boron injection tank BIT centrifugal charging pump CCP component cooling water CCW CRDM -

control rod drive mechanism condensate storage tank CST CVCS -

chemical and volume control system direct current (electrical power and signals) dc LOCA -

loss of coolant accident motor driven (in reference to pumps)

HD MSIV -

main steamline isolation valve narrow range (level indication)

NR PORV -

power operated relief valve positive displacement pump PDP pressurizer relief tank PRT PRZR -

pressurizer reactor coolant pump RCP reactor coolant system RCS residual heat removal RHR reactor pressure vessel RPV resistance temperature detector RTD RWST -

refueling water storage tank RVLIS-reactor vessel liquid inventory system safety injection SI SC steam generator SGTR -

steam generator tube rupture SUR startup rate thermocouple TC turbino driven (in reference to pumps)

TD volume control tank VCT wide range (level indication)

WR l

l l

l Page 28 of 56

o Figure 6 Example Foldout Page FOLD 0UT FOR E-2 SERIES PROCEDURES 1.

RCP TRIP CRITERIA Trip any RCP if component cooling water to that pump is lost.

o o

Trip all RCPn if BOTH conditions listed below are met:

a.

S1 is ON.

b.

RCS pressure - EQUAL TO OR LESS THAN (1700) PSIC.

2.

SI REINITIATION CRITERIA FOLLOWING LOSS OF SECONDARY COOLANT a.

Reinitiate SI if ANY ONE of the parameters listed below occurs:

(1) RCS Subcooling - LESS THAN (20) %F (2) Pressurizer level - less than (20) %

3.

AFW SUPPLY SWITCHOVER CRITERION IF,DWST level less than 54,000 gallons, THEN SWITCH TO ALTERNATE AFW water supply.

l l

l l

Page ;9 of 56 t

s k

NLmber:

Title:

R;v Issue /Date:

I F-0.1 SUBCRITICALITY HP/LP, REV.1

)J 1 Sept.,1983 FIGURE 7 GO TO FR S.1 iO

[

g- - - - - - 4 =

NO POWER RANGE E

LESS THAN 5%

E GO TO 80 YES FR S.2 I

INTERMEDIATE NO NO ANCESUR INTERMEDIATE RANGESUR NEGATIVE E

T VE YES CSF SAT NO SOURCE RANGE ENERGIZED YES o

C3 =

NO O

!!#a!"

SUR ZERO OR NEGATIVE YES O

~

CSF SAT Page 30 of 56

l p-l Figure 8 THE SCHEME OF LINE PATTERN CODING USED

{

TO IDENTIFY PRIORITIES l

BRANCH STATUS j

LINE ID9RIFIER f

IE CRITICAL SAFETY FUNCTION IS SATISFIED -

CORRESPotOS TO GE NO OPERATOR ACTION IS CALLED FOR 1

g

,. - - - IS CORRESPONDS TO YELN SATISFIED OPERATOR ACTION t%Y EVErmlALLY

}

BE NEEDED MM IHE CRITICAL SAFETY FUNCTION IS t!'OER CORRESP0tOS TO ORATf" PROMPT OPERATOR AC'10N SEVERE Ct%LLENGE IS NECESSARY THE CRITICAL SAFETY FUNCTION IS IN JEOPARDY -

CORRESPOrOS TO @

ItNEDIATE OPERATOR ACTION IS REQUIRED Pac,e 31 of.56

c..

6.

Mechanics of Style 6.1 Spellina All spelling should be consistent with modern usage as specified in the Standard Dictionaries.

6.2 Punctuation Punctuation should be used only as necessary to aid reading and prevent misunderstanding.

Word order should be selected to require a minimum of punctuation. The following rules apply:

o Use a colon to indicate that a list of items is to follow.

Example - Stop the following equipment:

o Use a comma after conditional phrases for ease of reading.

Example - IF, level exceeds 50%, then.....

o Use parenthesis to indicate alternative items in a procedure, o

Do not use brackets.

o Use a period to indicate the end of complete sentences and for l

indicating the decimal place in numbers.

6.3 Capitalization Capitalization shall be used in the procedures for emphasis in the following cases:

o Logic terms will be capitalized and underlined.

i l

l i

1 l

Page 32 of 56 i

o Expected responses (left-hand column of instructions) are capitalized, o

Titles of procedures will be completely capitalized whenever referenced within any procedure, o

Operator action steps may be completely capitalized FOR EMPIIASIS.

o Abbreviations (TABLE 2) are commonly capitalized.

o Section headings on foldout pages are capitalized and underlined.

6.4 Vocabulary Words used in the procedures should convey precise meanings to the trained operator.

Simple words having few syllables are preferred.

These are typical of words in common usage.

Verbs with specific meanings should be used. The verb should exactly define the task expected to be performed by the operator.

A list of frequently used verba is included as Table 3.

Some words have unique meanings as listed below:

manual (manually) an action performed by the operator in the L

control room.

(The word is used in contrast to an automatic action, which takes place) local (locally) an action performed by the operator outside the control room.

Example Directly turning a handwheel to close a valve.

Certain other words are to be avoided simply because they are not adequately defined when used without modification. These includes stable, approximately, rapidly, slowly and normal. The same words become acceptable when some clarification is provided.

Exampics Rapidly (up to 200'F/IIR) cool down the RCS.

inequalitico are to be expressed in words rather than symbols:

1.e., " greater than, less than".

These words are always appropriate for comparing pressures, temperatures, levels and flowrates.

The words "abovo" and "below" should not be used in this context.

6.5 Numerical Values l

All numerical values presented in the procedures should be consistent with what can be read on instruments in the control room (i.e., consistent with instrument scale and range).

page 33 of 56

l The number of significant digits presented should be equal to the reading precision of the operator.

Acceptance values should be stated in such a way that any addition and l

subtraction operations are avoided, if possible.

This is done by i

stating acceptance values as limits.

Examples:

2500 psig maximum, 350*F minimum, between 450*F and 500*F. Tolerances can be expressed by stating the nominal value followed by the acceptable range in parenthesis.

Example:

550'F (540*F to 560*F)

Avoid:

550*F 1 10*F Engineering units should always be specified when presenting numerical values for process parameters. They should be the same as those used on the control room displays.

6.6 Abbreviations and Acronyms Abbreviations and acronyms should be limited to those commonly used by l

operators. Table 2 lists the most common ones necessary for these procedures.

Abbreviations and acronyms from Table 2 will be uniformly capitalized whenever they are used.

t i

I Page 34 of 56 i

t

TABLE 3 f

ACTION VERBS f

Verb Usage Align To arrange a series of components into a desired configuration.

Example: Align the system for normal charging.

Block To inhibit an automatic actuation.

Example:

Block SI actuation.

Check To note a condition and compare with some procedure requirement.

Example:

Check pressurizer level - GREATER THAN 20%.

Close To change the physical position of a mechanical device.

Closing a valve prevents fluid flow.

Closing a breaker allows electrical current flow.

Complete To accomplish specified procedures requirements.

Control To manually operate equipment as necessary to satisfy procedure requirements.

Example: Control pressurizer level.

Establish To make arrangements for a stated condition.

Example Establish normal pressurizer pressure and level control.

Page 35 of 56

~6 o.

l L

I r

l ACTION VERBS (Continued) i l

Verb Usage Initiate To begin a process (Begin is preferred).

Maintain To control a given plant parameter to some procedure requirement continuously.

Example: Maintain steam generator level in the narrow range.

Monitor Similar to " check", except implies a repeated function.

Open To change the physical position of a mechanical device to the unobstructed position.

Opening a valve permits fluid flow.

Opening an electrical breaker prevents current flow.

Record To document specified characteristics.

Example: Start one RCP.

Start To originate motion of an electrical or mechanical device, either directly or by remote control.

Stop To terminate motion of an electrical or mechanical device.

l r

Example: Stop both diesels.

Throttle To operate a valve in an intermediate position to obtain a certain flow rate.

Example: Throttle AFW flow to maintain S/G 1evel.

Page 36 of 56

s.

e ACTION VERBS (Continued)

Verb Usage Trip To manually activate a semi automatic feature. Commonly,

" trip" is used to refer to component de-activation.

Example: Trip the reactor; trip the turbine. Trip a breaker...

Verify To observe that an expected characteristic or condition exists. Typically the expectation comes from some previous automatic or operator action.

l i

Page 37 of 56 1

>f EMERGENCY OPERATING' PROCEDURES VERIFICATION PROGRAM 2.1 E0P VERIFICATION PROCESS OVERVIEW E0P verification is the static evaluation performed to confirm the written correctness of the E0Ps and to ensure that generic and/or plant-specific

. technical aspects have been properly incorporated. The written correctness of the E0Ps is evaluated by comparison of the E0Ps to the plant-specific writers guide for E0Ps and other appropriate administrative policies. The incorporation of applicable technical aspects is evaluated by comparison of the E0Ps to designated source documents and plant hardware (plant equipment, instruments, indications, and controls).

Evaluation of the written correctness can facilitate E0P Validation by minimizing the potential for complications during validation resulting from human factors discrepancies. The E0P Validation Program can then be directed at proving that the human factor concerns have been satisfactorily considered with regard to crew operations, or will be able to indicate specific factors that were overlooked.

Evaluation for proper incorporation of technical aspects, referred to as E0P technical accuracy, can be accomplished by static comparison with source documents and existing plant hardware. The ultimate in the evaluation of technical accuracy would be the comparison of the written E0Ps to perfect, ideal E0Ps.

Since perfect, ideal E0Ps do not exist, a utility can only compare their E0Ps to the existing plant hardware and to the source documents used as the bases for the E0Ps. These source documents reflect state-of-the-art analysis and advances or detection of errors in the analysis is outside the scope of E0P Verification and Validation.

Page 38 of 56

F

~

3 i.

l' As discussed, EOP Verification Process and E0P Validation Program interrelate. The distinctions between Verification and Validation are in the_ type of. evaluation (static or dynamic) and the process used (comparative _ evaluation or performance). An E0P Verification Process should consider the following generic elements of the process:

I o

Source Documents o

Personnel (performing Verification) o Evaluation Criteria (based on Verification Principles) o Discrepancy Detection I

o

-Discrepancy Resolution o

Documentation of Verification l

l Depending on how the elements are organized and considered, the process can be implemented through the use of a verification checklist that' structures the review and documents the review process.

l 2.2 'EOP VERIFICATION OBJECTIVES l-By definition, the E0P Verification Process evaluates the written correctness and technical accuracy of the E0Ps.-

Therefore,c EOP verification can be considered' adequate when the~following basic objectives l

are satisfied.

1 Written correctness - The plant' specific writers guide for E0Ps and o

l.

other appropriate' administrative policies have been applied correctly Technical accuracy - Proper incorporation of-generic.and/or i

o plant-specific technical aspects from source documents and plant hardware have been incorporated correctly, l

s l

i I

t b

i Page 39 0f ;56 i

L_

m 2.3 SCOPE OF E0P VERIFICATION The' scope of the E0P Verification Process encompasses a thorough review process to ensure that the technical information contained.in the applicable source documents has not been altered without appropriate considerations. Alterations such as additions or deletions could result in E0Ps that change the technical intent of the source documents. By performance of the verification process, such discrepancies can be identified and corrected.

A.1 GENERAL This E0P Verification Process is designed specifically for evaluating emergency operating procedures (EOPs) which were prepared in accordance with the' plant-specific writers guide for emergency operating procedures

' contained.in the Emergency Operating Procedures Writers Guide.

This Writers Guide was used to provide the basis for the evaluation criteria for written correctness. The remaining verification principles addressing the technical accuracy are satisfied by using the evaluation criteria described with each principle. The evaluation criteria are presented on a checklist and are applicable to all.

l A.2 SOURCE DOCUMENTS The following source documents will'be considered for use by the personnel conducting E0P Verifications.

1.

Existing E0Ps 2.

Plant Technical Specifications 3.

Facility Description and Safety Analysis 4.

As built plant drawings 5.

Westinghouse Owners Group E.R.Ps.

6.

Experience gained from past operation of Connecticut Yankee and other similar plants.

7.

Any.other pertinent information.

8.

.Best estimate accident analysis for CY.

Page 40 of 56

~

3 c,

y.

s

)

1 i

s..

t I

f' A.2.2 FERSONNEL l

p.

.The E0P. Verification Program will be carried out by a team of people from the f-Operating Department, Trainfng Department NUSCO Reactor Engineering Branch and other selected personnel.

c CY~0perations Department' members will be responsible fer4 written correctness and technical accuracy.

i l

.I A.2.3 EVALUATION CRITERIA The evaluation criteria are p, resented as questions on the following checklist to guide the verification of all the EOPs.

l r

A.2.4 DISCREPANCY DETECTION,

Any discrepancies detected will be described on the comment sheets which will be

)

attached to the checklist. Thesefodmswillbereviwedbytheappropriate 8

a manager to ensure the' discrepancy has been correctly -identified.

A.2.5

' DISCREPANCY RESOLUTION The comment sheets will be forwarded to the E0P writer for correction. The corrected procedures will'then be presented for E0P Validation.

A.2.6 DOCUMENTATION The documentation of1the E0P Verification Process will be the comment sheets and t

c _

the checklist used. This documentation will be inputted to records management system.

1 t

}

3i

(

Page 41. of 56 1,)

A.3 E0P VERIFICATION CHECKLIST Each of the evaluation criteria questions presented can generally be answered with YES or NO.

If the E0P being evaluated possesses the characteristic specified in the question, enter a checkmark (X) in the YES column.

If it lacks the characteristic, check No.

In a very few instances, the characteristic might not be applicable to the E0P.

For example, if the E0P does not contain graphs or charts, the question concerning their legibility is not applicable.

In cases like this, enter N/A in the Yes and No columns, v,

When a question is answered with No, an explanation should be recorded in the Comment Sheet and its number recorded in the column. All differences between the EPG and E0P should be explained and documented.

The E0P evaluation questions are arranged in a sequence that allows the reviewer to proceed efficiently through the Verification Procedure.

It is suggested that the reviewer complete the evaluation of the E0P on the first Verification

. Principle, Reproducibility, before proceeding to the second principle, complete the evaluation on the second principle before proceeding to the third, and so on. Record the E0P title and number in the space provided. Also, record the revision number and date, if applicable. All source documents used in the i

verification of the E0P should be identified by title, number (if applicable),

revision number, and date. Upon completing the evaluation, the reviewer (s) should enter name(s) and date(s) in the space provided.

Selected plant Emergency Operating Procedures will be reviewed by (NUSCO),

Northeast Utilities Service Company Safety Analysis Branch as per Nuclear Engineering and Operations Procedure NE0 3.12, Safety Evaluations.

A.4 REVISIONS i

Any changes to the ERG's will be verified correct, and validated to insure they provide proper guidance. Any additions or deviations from the generic guidelines will be verified / validated by a team o' operators and NUSCO Safety Analysis Engineers. The method of validation will consist of table-top, walk-through and/or plant-specific simulator, as applicable.

The checkoff lists will be used for the verification phase only.

Page 42 of 56

r.

COMMENT SHEET

SUBJECT:

FROM:

Date DISCREPANCY:

TO:

RESOLUTION:

DATE:

l

!l' l

l Page 43 of 56 l

I

o.

VERIFICATION CHECKLIST Procedure Title /No.

Revinica No.

s kh Date of Issue Written Correctness reviewed by Date Technical Accuracy reviewed by Date Source documents used in verification:

a 1

Page 44 of 56 o

p i

(

VERIFICATION CHECKLIST l

t' E0P DESIGNATION AND NUMBERING NO YES COMMENT Title and Number correct Page Numbering correct Revision Numbering correct E0P FORMAT Organization correct Page Formats correct Step Numbering correct Instruction Steps left-hand column Results Not Obtained - Instructions right-hand column Notes and Cautions properly placed Transition to Other Procedures or Steps correct-Level of detail sufficient HECHANICS OF STYLE Spelling correct Punctuation correct Capitalization correct Vocabulary correct Numerical Values correct Entry to Other Procedures correct i

Page 45 of 56

SOURCE DOCUMENTS NO YES COMMENT Are E0P/EPG differences:

Documented Explained Change Assumptions Are Plant Specific Values Incorporated:

Instruments Limits Indications Controls Systems Calculated Values Page 46 of 56 u.

j f

ENERGENCY OPERATING PROCEDURES j.

VALIDATION PROGRAM r

The Connecticut Yankee E0P Validation Program will be an ongoing program paralleling the operator training program.

Because it is an ongoing program, time as a' resource is unlimited and will determine only when the different Validation methods will be used.

There are three possible methods to validate Emergency Operating Procedures.

They are Table Top, walk through at Real Control Room, and Plant-Specific Simulator. The Table Top method is as the name implies, a simple method of Operators and Non-operators sitting at a table and going through the Emergency Procedures to determine their completeness, viability, under-standability and applicability. This is a process that requires very little equipment other than the procedures and background information.

The second method of validation will be a walk through at the control room and any other portion of the plant required to complete the procedure. This method will require operators both licensed and nonlicensed, supervisors and perhaps, persons other than those directly involved in plant operations, such as, Human Factors people.

In this method the scenarios will be developed and set for as many events and multiple events as practicabic.

The Operating personnel will then walk through the procedures or combination of procedures to determine the merit of the procedure and make corrective suggestions as they deem necessary.

Resources required for this method are the Emergency Operating procedure, prints and other technical data used in developing the procedures and access to the control room or a mockup of the control room.

The third method will use the plant specific simulator.

This is the most l

complete method of validating the Emergency operating procedures as it will be the nearest to the real thing as possibic. Here the scenarios will be programmed into the simulator and the operating crews will use the Emergency Operating Procedures to treat the symptoms and mitigate the accident.

(

Page 47 of 56 L

F The objective of this Validation program is to ensure that the operator using the Emergency Operating Procedures can recognize the malfunction, select the right procedure or procedures and mitigate the accident in a timely manner and return the plant to a safe and stable condition.More specifically, the objectives of the validation program are to verify the following:

a.

The procedure brings about the desired plant condition when followed in sequence without omissions or deletions using the entry conditions prescribed in the procedure.

b.

The procedures fit together as a group.

Each major plant transient should be an entry condition for a procedure and each procedure should end in a stable plant condition or entry into a procedure that continues to move toward stable conditions, c.

Procedures as a whole are not circulatory or repetitive.

d.

The procedure can be used by the operator without hesitation and without reference to non-procedural information, e.

Execution of the procedure as written does not require an operator to perform excessive travel around the Control Room to execute the procedure.

f.

The procedure as written does not requiro an operator to perform more than one task simultaneously or perform steps that conflict or cancel other steps.

  1. All of the above methods will be used, as available, to validate the Emergency Operating procedures at Connecticut Yankce.

The Documentation is performed for each step of the Validation process. When a procedure is used in a walk through or a simulated process an Error Summary form shall be used to indicate whether or not the procedure steps are valid as written and also to makn recommendations fer corrections.

Page 4g of 56

e.

l The procedures with the Error Summary form will be returned to the writer so that an evaluation may be made and revisions to the Emergency Operating Procedures can be initiated. The corrected Validated Emergency Operating Procedure will then be presented to the Plant Operating Review Committee, for processing in accordance with Quality Assurance Procedure QA 1.2-6.5,

" Procedure Review and Approval".

If no errors are found in a procedure during the validation process this shall be so stated on the Error Summary form so that a record of validation may be established.

Summary The objective of the validation program is to test the E0P's accuracy and applicability by giving walk through's with several different crews of operators. A wide variety of scenarios will be used to evaluate the E0P's.

These scenarios will be chosen from the attached 40 scenarios. The validation team will consists of 3 members:

Shift Supervisor - head Validation Team insure procedures are in agreement with current E0P's, Tech. Specs. and WOG Cuidelines.

SRO Instructor - Checks procedures from a Training viewpoint, insures procedures meet acceptance criteria for individual guidelines.

NUSCO Engineering - insure all calculations for pressure, RCS temperature, subcooling, RVLIS, and SI reduction sequence are current.

Checks transition to and from all status trees for accuracy.

The validation program will be used to determine whether the actual control room instruments and controls meet the information and control needs of the operators.

Errors found during validation phase will be corrected before the procedures are sont to PORC for approval.

All future revisions to E0P's will he verified and validated in accordance with this program.

l Page 49 of 56

l l

l E0P walk throughs will be conducted by the minimum staff required by Tech.

l Specs. Validation will be accomplished by walk-through, table-top, and/or the plant-specific simulator.

I b

Page 50 of'56

o.

E0P VALIDATION INDEX 1.

Response To inadequate Core Cooling 2.

SG Tube Rupture Without Pressurizer Pressure Control 3.

Response To Degraded Core Cooling 4.

Response To Saturated Core Cooling 5.

Loss Of Normal Steam Release Capabilities 6.

Response to PTS 7.

Responso To Anticipated PTS 8.

Response To High Containment Pressure 9.

Response To Containment Flooding 10.

Response To Containment Hi Radiation Level

11. Response To High Pressurizer Level 12.

Response To Lo Pressurizer Level

13. Loss Of Ileat Sink 14.

Steamline Break In Containment 15.

LOCA in Containment 16.

Responne To Volds In Reactor Vessel Page 51 of 56

o.

17.

Station Blackout With SGTR & Failed RCP Seal 18.

Stuck Open PORV And Block Valve

19. SGTR Subcooled Recovery Desired ECA 3.I
20. Normal Reactor Trip From INST Malfunction
21. SGTR Saturated Recovery Desired ECA 3.2 22.

Responne To Loss Of Core Shut Down 23.

Spurious SI Actuation 24.

Leak Outside Containment In PAB 25.

Natural Circulation Cooldown

26. Natural Circulation Cooldown With Steam Void In Vessel 27.

Uncontrolled Depress, to Head Recire, Hi Head Recirc 28.

Normal Reactor Trip With 2 Rods Stuck Out

29. SGTR With RCP 30.

Loss Of Heat Sink

31. PORV And Block Valve Open 32.

Loss Of AC With No SI Required

33. Loss Of AC With SI Required 34.

SCTR Cooldown Using Steam Dump l

(

Page 52 of 56

o, 35.

Safety Injection Termination 36.

SG Tube Rupture With Isolated Loop 37.

SG Tube Rupture. Cooldown Using Backfill 38.

SC Tube Rupture, Cooldown Using Blowdown

39. ATWS 40.

SG Tube Rupture With Steam Line Preak In Containment n

l Page 53 of 56

)

-o e

1 ATTACHNENT I ERROR St'MMARY FORM ENERGENCY OPERATING PROCEDURES NAME OF PROCEDURE STEP i RFASON FOR ERRCR REMARKS l

Page 54 of 56 J

g o

e i

E0P TRAINING PROGRAM 1.

Obj ective The training program has the following major objectivest 1)

To enable the operator to understand the structure and format of all E0P's.

2)

To enable the operator to understand the technical bases of all E0Ps.

3)

To enable the operator to understand how all E0Ps ensure that safety functions are natisfied.

4)

To give the operator experience in using a wide variety of th's E0Pa under simulated control room conditions.

5)

To exercise a wide variety of the E0Ps with all licensed operators.

6)

To train all operators on the revised E0Pa prior to their implementation.

2.

Training Process The training process can be divided into the following areas.

In each area training is presented to the operations staff one shift at a time.

This emphasizes the team approach of each shift and reinforces operator

roles, s.

Awareness and Involvement in the Upgrade Process.

Operators will be involved in the development and validation process.

b.

Individual Study and Review Prior to classroom presentation, each E0P will be reviewed by the licensed operator.

c.

Classroom Presentation and Discussion Instruction will be given ons

!)

Use of the new format 2)

Standard post trip actions 3)

Each event specific E0P 4)

When and how to una the functional E0P Page 55 of 56

d.

Simulator Instruction A plant-specific simulator in conjunction with walk-throughs will be utilized for operator training. A wide variety of scenarios will be used to fully exercise the E0Ps and thus expose the operators to a wide variety of E0P uses.

c.

Examination Tests will be administered to check that the necessary information has been learned.

The operator's knowledge and performance of E0Ps will be evaluated after training and appropriate followup training will be conducted in deficient areas.

I Page 56 of 56 i

. -