fC3 cooper NUCLE AR 5TATON
(
4 P.o. BOX 98. BROWNVR.LE, NEBRASKA 68321
'7:'.j Nebraska Public Power District
- pMOT,""
._ = -. _ - = - - - _ _ = -. -
.__-...=.g
_ = -
CNSS938545 February 8, 1993 Document Control Desk U. S. Nuclear Regulatory Commission Washington, D.C.
20555
Subject:
Monthly Operating Status Report for January, Docket No. 50 298.
Gentlemen:
Enclosed for your information and use is the Cooper Nuclear Station Monthly Operating Status Report for January 1993. The report includes Operating Status, Average Daily Unit Power Level, Unit Shutdown Data and a Narrative Summary of Operating Experience.
Should you have any comments, or require additional information regarding this report, please contact me.
Sincerely,
[
R. L. Gardner Plant Man,ager
\\
RLG:EAK: dis Enclosures cc:
C. D. Watson w/ enclosures J. L. Milhoan w/ enclosures 18~104 l
930218003o 930131 PDR ADOCK 05000298 I
R PDR g\\
jh'
\\
F:\\0ED\\93\\8545
~
hfk f fh i
.- =
=
=.
~
,== -
=
OPERATING DATA REPORT DOCKET NO.
050 0298 UNIT CNS DATE February 8. 1993 OPERATING STATUS TELEPHONE (40D 825-5766 1.
Una Name:
Cooper Nuclear Station Notes 8
Reporting Period:
January 1993 3.
Uconsed Thermal Power (MWt):
2381 4.
Nameplate Rating (Gross MWe):
830 5.
Dealgn Electrical Rating (Net MWe):
778 6.
Maximum Dependable Capacity (Gross M&):
787 F.
Maximum Dependable CapacMy (Not MWe):
764 8
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
g.
Power Level To Which Restricted, if Any (Net MWe):
10.
Reasons For Restriction, if Any-This Month Yr.-to-Date Cumulative 11.
Hours in Reporting Period 744.0 744.0 162.961.0 12.
Number of Hours Reactor Was Critical 744.0 744.0 125.711.0 13.
Reactor Reserve Shutdown Hours 0.0 0.0 00 14.
Hours Generator On-Une 744.0 744.0 123.952.9 15.
Unit Reserve Shutdown Hours 0.0 0.0 0.0 16.
Gross Thermal Energy Generated (MWH) 1.726.920 0 1.726.920.0 254.570.884.0 17.
Gross Electric Energy Generated (MWH) 576.218.0 576.218&_
82.567.200.0 18 Net Electric Eneigy Generated (MWH) 557.613.0 557.613.0 79.715.929.0 19.
Unit Service Factor 100.0 100.0 76.1 20.
Unit Availabllity Factor 100.0 100.0 76.1 21.
Unit Capacity Factor (Using MDC Net) 98.1 98.1 64.0 22.
Unit Capacity Factor (Using DER Net) 96.3 96.3 62.9 23 Unit Forced Outage Rate 0.0 0.0 4.3 34.
Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
A clanned refuelina/rnalntenance outaae of aDoroximately 56 days is scheduled for March 7.1992.
25.
If Shut Down At End of Report Period, Estimated Date of Startup: N/A 23.
Units in Test Status (Prior to Commercial Operationh Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
. _. ~.
1 t
l
]
AVERAGE DAILY UNIT POWER LEVEL i'
DOCKET NO.
050-0298 UNIT CNS DATE February 8, 1993 l
TELEPHONE (402) 825-5766 i
MONTH January 1993 4
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL i
(MWe-Net)
(MWe-Net) 1 739 17 740 1
i 2
767 18 739 I
l 3
750 19 736 4
770 20 733 5
771 21 731 4
6 770 22 727 i
i 7
770 23 725 1
8 770 24 673 9
766 25 767
)
10 759 26 7 53 I'
11 760 27
._758 12 757 28 754 13 753 29 751 14 750 30-748 j
'15
~748 31 746 j-16 746 INSTRUCTIONS on this format, list the average daily unit power level in MWe-Net'for'each day in the reporting month.
Compute to the nearest wholo-megawatt.
UNIT SHUTDOWNS AND POWER REDUCTIONS 3
DOCKET NO.
050-0298 UNIT NAME Coccer Nuclear Station.
DATE February 8.1993 COMPLETED BY E. A. Kernes
[
TELEPHONE (402) 825-5766 i
REPORT MONTH January 1993 7
Method Of Licensee Cause & Corrective.
Dur4tsen Shutting
' Event System
- Componeri Action to t ours)
Reason 8 Down Reactor
- Report Code Code Prevent Recurrence No.
Date Type'.
h NONE 1
s.
[
r e
i 1
F: Forced 2
Reason:
3 Method:
4 Extt4 bit G - Instructeons for S: Scheduled A-Equipment Failure (Expla:n) 1 - Manual Preparation of Data Entry B Maintenance or Test 2 - Manual Scram Sheets for Ucensee Event l
C - Refuenng 3 - Automatic Scram
&# (LEP) Fife (NUREG-0161)
D - Regu!atoey Restriction 4 - Continued E-Operator Training & Ucense Examination 5 - Reduced Load 5 Exhibit 1 - Same Source l
F - Administrative 6 - Other.
{
G - Operational Error (Explain) l H - Other (Explain)
I 1
.~
'f
.. ~.
i i
4 OPER'ATIONS NARRATIVE COOPER NUCLEAR STATION -
i January 1993
(
B 1
{
From January 2 to 8, Cooper Nuclear Station operated near full power, A minor rod adjustment was made on January 3. From January 9 to 23, t
j the plant was allowed to coastdown in power prior to pulling the final
~
]
control rods to All Rods Out (ARO). After achieving ARO on January 24, i
the plant returned to full power.
4 1
l End-Of-Cycle (EOC) 15 fuel coastdown began on January 26 and I
continued through the end of the month.
i i
i Cooper Station achieved a 98.1% capacity factor for the month'of l
January.
.i i'