ML20128J172
ML20128J172 | |
Person / Time | |
---|---|
Site: | Palo Verde |
Issue date: | 07/08/1985 |
From: | Dewey L NRC OFFICE OF THE EXECUTIVE LEGAL DIRECTOR (OELD) |
To: | Callihan D, Cole R, Lazo R Atomic Safety and Licensing Board Panel |
References | |
CON-#385-740 OL, NUDOCS 8507100433 | |
Download: ML20128J172 (1) | |
Similar Documents at Palo Verde | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML17313B0991999-10-14014 October 1999
[Table view]Forwards LER 99-005-00 Reporting Findings & Corrective Actions Taken as Result of Out of Tolerance MSSV Condition in Unit 1 Which Was Discovered During pre-outage Testing ML17313B0881999-10-12012 October 1999 Forwards Response to NRC 990831 RAI Re Several Relief Requests That Accompanied Second ten-yr Interval ISI Program Submitted on 980317.Revised Relief Request 6 Is Provided in Encl 2 ML17300B3501999-09-29029 September 1999 Forwards Revised Bases Pages,Providing Addl Discussion of Options Available to Exit Required Action G of TS 3.8.1 & Revised Page for TS 3.3.7,in Response to NRC RAI Re Proposed Amend to TS 3.8.1 & 3.3.7 ML17300B3551999-09-28028 September 1999 Responds to Aministrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams. Proposed Palo Verde Operator Licensing Exam Schedule & Estimated Number of Applicants Planning to Take Exams Encl ML17313B0851999-09-24024 September 1999 Requests Approval of Alternative to Repair Requirements of 10CFR50.55a,authorizing Alternative Use of Mechanical Nozzle Seal Assemblies,As Described in Encl,For RCS Hot Leg Instrumentation & Sampling Nozzles for Two Operating Cycles ML17313B0781999-09-20020 September 1999 Forwards Rev 22 to PVNGS Emergency Plan. Summary Description of Changes,Included ML17300B3331999-09-14014 September 1999 Forwards MOR for August 1999 & Revised MOR for Jul 1999 for Pvngs,Units 1,2 & 3 ML17300B3351999-09-0808 September 1999 Informs That Repairs to Plant EDG 2A Jacket Water Cooling sub-sys Were Completed & EDG Was Declared Operable on 990903 at Approx 21:45 Mst.Noed Was Not Necessary,Since 72 Hour Completion Time Was Met ML17313B0761999-09-0303 September 1999 Requests Enforcement Discretion to TS Section 3.8.1, AC Sources - Operating. Enforcement Discretion Would Allow,On One Time Basis,Extension of Completion Time in Required Action B.4 of TS 3.8.2 from 72 H to 108 H ML17313B0731999-08-31031 August 1999 Informs That RR Bean (License OP-50452-1) Has Been Permanently Reassigned to Position That Does Not Require License & Requests That Individuals License Be Expired Per 10CFR55.55 ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML17313B0581999-08-0606 August 1999 Forwards Rev 1 of Changes to TS Bases Implemented Between Aug 1998 & Jul 1999.Insertion Instructions & List of Affected Pages Included ML17313B0311999-08-0303 August 1999 Submits Response to NRC AL 99-02, Operating Reactor Licensing Actions Estimates, for Fys 2000 & 2001 ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML17313B0431999-07-30030 July 1999 Advises of Listed Senior Mgt Changes That Have Taken Place at Plant ML17313B0441999-07-30030 July 1999 Forwards Comments on Draft NRC Repts Evaluation of AOVs at Us Light-Water Reactors (1999) & Idaho Natl Engineering & Environ Lab Rept (INEEL)EXT-98-00383,Study of AOVs in Npps. ML17313B0151999-07-20020 July 1999 Submits Request to Obtain All Data Previously Sent by PVNGS & Currently in REIRS for OLs NPF-41,NPF-51 & NPF-74.Data Is Requested in Electronic Form (Ascii Format) as It Currently Exists in REIRS Sys ML17313B0091999-07-20020 July 1999 Forwards Requested Calculations Performed to Verify That Increase in Max Radially Averaged Enrichment for Fuel Assemblies from 4.3 Weight Percent to 4.8 Weight Percent Did Not Affect Requirements for TSs 3.7.15,3.7.17 & 4.3.1 ML17313B0171999-07-16016 July 1999 Forwards LER 99-005-00,re Automatic Rt Which Occurred on 990618,following Sensor Failure in Core Protection Calculators.Corrective Actions Described in LER Are Not Necessary to Maintain Compliance with Regulations ML17300B3111999-07-15015 July 1999 Forwards PVNGS Unit 2 ISI Rept for Eighth Refueling Outage. No Commitments Made to NRC by Ltr ML17300B3141999-07-15015 July 1999 Forwards Corrected Electronic Files for Individual Monitoring Repts for 1998.Original Electronic Files Were Found to Have Two Administrative Errors,Which Has Been Corrected.Encl Withheld,Per 10CFR2.790 ML20209G6771999-07-0808 July 1999 Forwards Supplemental Info to Confirm That Decommissioning Funding Plans of Public Service Co of Nm for Interests in PVNGS Have Been Reviewed by Nm Public Regulation Commission. Final Order & Recommended Decisions in Case 2742,also Encl ML17300B2931999-07-0202 July 1999 Submits Withdrawal of Relief 5 for Second ISI Interval for Units 1,2 & 3.Proposed Alternative Is Related to Exam Requirements for Component Supports for Second ISI Interval ML17313A9951999-06-26026 June 1999 Provides Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. ML17300B2831999-06-26026 June 1999 Requests NRC Approval of Proposed Alternative IAW Provisions of 10CFR50.55a(a)(3)(i) to 10CFR50.55a(g) & Requirements of ASME Boiler & Pressure Vessel Code Section XI for Repairs & Installation.Description of Proposed Alternative,Encl ML17313A9901999-06-15015 June 1999 Forwards Response to RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs. No Commitments Being Made to NRC by Ltr ML17313A9521999-05-24024 May 1999 Notifies NRC That Ja Proctor,License SOP-50314,has Been Permanently Reassigned to Position That Does Not Require License.License Should Be Expired,Per 10CFR55.55 ML20206Q3111999-05-18018 May 1999 Final Response to FOIA Request for Documents.Forwards App a Records Being Released in Entirety ML17313A9311999-05-13013 May 1999 Notifies NRC That Rev 2 to COLR for Unit 2 Remains Applicable Following Recently Completed Unit 2 Reload ML17313A9481999-05-12012 May 1999 Informs of Change Needed in Order to Update Current Mailing List.Future Mailings for J Horne Should Be Forwarded to Listed Address ML17313A9261999-05-0707 May 1999 Forwards LER 99-004-00,per 10CFR50.73.LER Repts Findings & Corrective Actions Taken as Result of Unit 2 Out of Tolerance Pressurizer Safety Valve (Psv) Condition Which Was Discovered During Outage Testing ML20206H1931999-05-0303 May 1999 Forwards 1998 Annual Rept, for SONGS Units 2 & 3 & PVNGS Units 1,2 & 3.SCEs Form 10K Annual Rept to Securites & Exchange Commission for Fiscal Yr Ending 981231,encl ML17313A9091999-04-30030 April 1999 Forwards Proprietary Proposed Test Outlines for Initial License Exams to Be Administered at PVNGS in Aug/Sept 1999. No Commitments Are Contained in Ltr.Proprietary Info Withheld ML17313A9181999-04-30030 April 1999 Forwards Electronic File of Individual Monitoring Repts for 1998.Encl Withheld Per 10CFR2.790 ML17313A9191999-04-30030 April 1999 Forwards Special Rept 2-SR-99-001 Re SG Tube Plugging in PVNGS Unit 2,per TS Reporting Requirement 5.6.8.Complete Results of SG Tube Inservice Insp Will Be Submitted by 000422 ML17300B3751999-04-23023 April 1999 Forwards LER 99-003-00,reporting Condition Prohibited by TS 3.7.17 Where Spent Fuel Assembly Was Stored in Inappropriate Region in Spent Fuel Pool ML17313A9081999-04-23023 April 1999 Documents 990421 Telcon with E Emeigh,Which Requested Extension for Submitting Next Matl Balance Rept for Pvngs,As Required by 10CFR70.53 & 74.13.Required Info Will Be Submitted by 990531 ML20205T7421999-04-21021 April 1999 Forwards Partially Withheld Insp Repts 50-528/99-05, 50-529/99-05 & 50-530/99-05 on 990322-26.Determined That Security Program Properly Implemented.Insp Repts Details Withheld (Ref 10CFR73.21) ML17313B0271999-04-21021 April 1999 Forwards Proprietary Epec Pro Forma Cashflow Statement for 1999.Proprietary Info Withheld,Per 10CFR2.790.Affidavit Encl ML17313A9031999-04-21021 April 1999 Forwards Rev to Relief Request 12 Submitted 990420 to Second 10-yr ISI Interval.Revised Relief Request Discusses in More Detail Actions APS Will Take When There Is Identified Leakage from Bolted Connection ML17313A8971999-04-20020 April 1999 Requests Use of Alternatives to 10CFR50.55a(g) Inservice Insp Requirements.Proposed Alternatives Are Related to Visual Exam of Bolted Connections 05000529/LER-1999-002, Forwards LER 99-002-00 Re Findings & Corrective Actions Taken as Result of Plant Out of Tolerance MSSV Condition Which Was Discovered During pre-outage Testing1999-04-19019 April 1999 Forwards LER 99-002-00 Re Findings & Corrective Actions Taken as Result of Plant Out of Tolerance MSSV Condition Which Was Discovered During pre-outage Testing ML17313A8931999-04-14014 April 1999 Forwards LER 99-003,reporting Condition Prohibited by TSs That Existed When Surveillance Requirement to Verify Essential Chilled Water Sys Valve Positions Was Not Met ML20205Q0821999-04-13013 April 1999 Forwards Second ISI Interval Relief Request 10 from ASME Section XI & Applicable Addenda Re Visual Exams Performed Subsequent to Repair or Replacement of Component or Alteration of Item ML17313A8901999-04-13013 April 1999 Forwards LER 98-003-01 Re MSSV as-found Lift Pressures out- Side of TS Limits.Ler Suppl Provides Evaluation Findings from Unit 3 out-of-tolerance MSSVs Conditions Which Were Discovered During pre-outage Testing ML17313A8831999-04-0808 April 1999 Forwards 1998 Annual Radioactive Effluent Release Rept for Pvngs,Units 1,2 & 3 & Rev 13 to ODCM, for Pvngs,Units 1,2 & 3 IAW TS 5.6.3 ML20205F3491999-03-30030 March 1999 Forwards Proprietary & non-proprietary Info Re Status of Decommissioning Funding for Pvngs,Units 1,2 & 3,per 10CFR50.75(f)(1).Proprietary Info Withheld,Per Requirements of 10CFR2.790(b)(1) ML17313A8671999-03-24024 March 1999 Submits Info Re Present Levels & Sources of Property Insurance Maintained for Pvngs,Per 10CFR50.54(w)(3) ML17313A8601999-03-16016 March 1999 Forwards Revised Relief Requests PRR-05,PRR-06 & PRR-11 to Clarify That Proposed Design Flow Testing for Lpsi,Hpsi & Containment Spray Pumps Will Be Performed Using Instruments That Comply with Code Requirements,Per 990226 Telcon ML17313A8551999-03-0505 March 1999 Requests Proposed Code Alternative IAW 10CFR50.55a(e)(3),as Acceptable Alternative to Requirements of 10CFR50.55a(e)(1), for Installation of in-line safety-related Flow Measurement Instrument in ASME Class 3 Pipe 1999-09-08 Category:INTERNAL OR EXTERNAL MEMORANDUM MONTHYEARML20217A8641999-10-0606 October 1999
[Table view]Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 990829-0903 ML20211H4441999-08-27027 August 1999 Notification of Significant Meeting with Util on 990916 & 17 in Arlington,Tx to Improve Utility & NRC Understanding of Industry & Regulatory Perspectives on Current Issues ML20138K0131997-05-0606 May 1997 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal) for Tests Administered on 970324-28 ML20138K0091997-05-0606 May 1997 Forwards NRC Approved Operator Licensing Exam (as-given Operating Exam) for Tests Administered on 970324-28 ML20137F2351997-03-24024 March 1997 Summary of 970207 Meeting W/Listed Attendees in Rockville,Md to Discuss Nuclear Energy Inst Concerns Re Graded Quality Assurance Activities W/Volunteer Plants ML20137C9201997-03-20020 March 1997 Forwards Documentation of Meeting Conducted in Region 4 Office on 970225 to Discuss NRC Enforcement Policy as Applied to Nonescalated Enforcement ML20135E7161997-03-0303 March 1997 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 961118-22 ML20134P2231997-02-20020 February 1997 Discusses Ti 2515/122 Evaluation or Rosemount Pressure Transmitter Performance & Licensee Enhanced Surveillance Programs multi-plant Action B-122 ML20134M2471997-02-14014 February 1997 Submits List of Plants Not Meeting Selection Criteria for Ti 2515/118 Insp on Basis of Factors Such as SWS Operating Experience,Contribution of SWS to Plant Risk Assessment, Licensee Programs in Response to GL-89-13 ML20236U9391995-12-20020 December 1995 Discusses Oi,Region IV Rept of Investigation,Dtd 940511, Case 5-93-023R,which Reported OI Investigative Efforts Re Alleged Employee Discrimination at Plant Units 1,2 & 3.Rept Was Sent to Us Attorney Office in Phoenix,Az in May 1994 IA-96-341, Discusses Allegation RV-94-A-0004,Songs Vendor Manuals. Licensee Reviewed Allegation,Concluded Unfounded & Notified NRC for Conclusion by 940228 Ltr1994-08-0303 August 1994 Discusses Allegation RV-94-A-0004,Songs Vendor Manuals. Licensee Reviewed Allegation,Concluded Unfounded & Notified NRC for Conclusion by 940228 Ltr ML20138F9871994-08-0303 August 1994 Discusses Allegation RV-94-A-0004,Songs Vendor Manuals. Licensee Reviewed Allegation,Concluded Unfounded & Notified NRC for Conclusion by ML20056E5141993-08-12012 August 1993 Submits SALP Schedule for FY94 Per Mgt Directive 8.6 ML20198E3271992-10-20020 October 1992 Notification of Significant Licensee Meeting W/Util on 921027 to Discuss Transfer of Fire Watch Responsibilities to Security Dept & Ongoing Programs within Security Dept ML20126L8441992-09-14014 September 1992 Provides Status Rept Concerning Actions Re Det Performed at Plant ML20127C2461992-03-0202 March 1992 Forwards AEOD SALP Input for Facilities in Support of Ongoing SALP Reviews.Two of Six Important Operating Events Involved Deficiencies of Reactor Power Cutback Sys Which Relies on Proper Functioning of Steam Bypass to Condenser ML20127B6281990-12-31031 December 1990 Forwards Updated Status Rept on Actions Re Diagnostic Evaluation Performed at Facility IA-92-218, Forwards Updated Status Rept on Actions Re Diagnostic Evaluation Performed at Facility1990-12-31031 December 1990 Forwards Updated Status Rept on Actions Re Diagnostic Evaluation Performed at Facility ML20127B5671990-12-12012 December 1990 Forwards NRR Input for SALP Rept,Per NRC Ofc Ltr 907,Rev 1 ,NRC Manual Chapter 0516 & 901120 Memo ML20059M2041990-09-27027 September 1990 Notification of Significant Licensee Meeting W/Util on 901003 to Discuss Licensee Response to Diagnostic Evaluation Team Findings & Overall Status of Programs. Addl NRC Attendees Should Be Made Known by 901002 ML20059L6531990-09-20020 September 1990 Notification of 900921 Meeting W/Util in Walnut Creek,Ca to Discuss Licensee Initiatives & Status in Area of QA ML20059D6361990-08-27027 August 1990 Notification of 900831 Enforcement Conference W/Util in Walnut Creek,Ca to Discuss Medical Qualifications & Exams of Licensed Operators ML20127B4571990-08-24024 August 1990 Comments on Response to Facility Diagnostic Evaluation Team Rept.Suggests That Region V Followup & Closely Monitor Development & Implementation of Specific Tasks Which Will Address Team Findings ML20058M3441990-08-0606 August 1990 Forwards List of Open Items in Sims for Plant.Documented Basis Exists for Closure of TMI Related Items at Plant ML20126L8271990-06-14014 June 1990 Provides Summary of Schedule & Status of Items Re Det of Plant Performed by Aeod,In Response to 900314 Memo ML20127B2171990-01-18018 January 1990 Forwards AEOD Input for Commissioner Curtiss Visit to Plant on 900201,consisting of Summary of Operating Experience from Oct 1988 to Dec 1989 ML20127B1681989-11-0909 November 1989 Forwards NRR Input to SALP for Facilities.Category 2 Rating Assigned in Functional Areas of Plant Operations, Radiological Controls,Emergency Preparedness,Security & Safety Assessment/Quality Verification ML20246N7371989-08-29029 August 1989 Notification of Maint Team Insp Meeting on 890901 W/Util in Phoenix,Az to Discuss Status of Licensee Commitments from 890605 Mgt Meeting in Consideration of Unit 3 Restart ML20127B1401989-08-0707 August 1989 Forwards for Info & Consideration for Info Notice,Lers Describing Potter & Brumfield Relay Problems & Atmospheric Dump Valve Deficiencies.Info Provided as Part of AEOD Function to Identify Potential Adverse Events ML20127G5121989-03-15015 March 1989 Discusses Atmospheric Dump Valve Failures at Plant.Cause Still Under Investigation.Related Documentation Encl ML20236B4871989-03-14014 March 1989 Notification of 890316 Meeting W/Util in Rockville,Md to Discuss Electrical Distribution Sys as Related to Load Injection Event on 890303.Preliminary Agenda for Electrical Meeting Encl ML20195G8481988-11-21021 November 1988 Notification of Significant Meeting on 881201 in Wintersburg,Az to Review Util Action on NRC Concerns ML20206L6701988-11-21021 November 1988 Notification of 881209 Meeting W/Util in Rockville,Md to Present Engineering Excellence Program ML20207D6471988-08-0505 August 1988 Notification of Significant Meeting on 880817 W/Util in Walnut Creek,Ca for Enforcement Conference Re Early Criticality Event at Unit 1,personnel Radiation Overexposure at Unit 2 & Violation Re Essential Chiller Water Sys ML20196L2531988-06-28028 June 1988 Recommends Closeout of Eab Long-Term Followup Item 87-157 on Reactor Coolant Pump Shaft Cracking at Plant.Modified Shafts Installed & Vibration Monitoring Programs in Place ML20150A8971988-06-24024 June 1988 Advises That C-E 880108 Rept of Fuel Surveillance Test Results Previously Submitted to NRC as Nonproprietary Info, Should Be Considered Proprietary ML20196F9801988-06-23023 June 1988 Advises That Licensee 880609 Justification for Continued Operation Re Recent Auxiliary Feedwater Pump Degradation Event Acceptable.Licensee Will Perform Corrective Maint When Replacement Parts Received ML20154N1601988-05-25025 May 1988 Notification of 880531 Meeting W/Util in Rockville,Md to Discuss Evaluation of Failure of Auxiliary Feedwater Pump at Unit 1 & Planned Actions to Correct Root Cause of Failure ML20151E2061988-04-0808 April 1988 Notification of 880414 Meeting W/Util & BNL in Rockville,Md to Discuss Vibration Monitoring Program for Reactor Coolant Pump Shafts & Status on Plant Shaft Evaluations.Agenda Encl ML20148D9491988-03-15015 March 1988 Discusses 880315 Operating Reactors Events Meeting 88-11. List of Attendees,Events Discussed & Tabulation of long-term Followup Assignments Detailed in Encls ML20147H6821988-03-0404 March 1988 Confirms 880302 Telcon Re Evaluation of Justification for Continued Operation.Agreed That Continued Operation of Plant Presents No Undue Risk to Public Health & Safety.Util Received Which Confirms Info Provided by T Polich ML20236X7421987-12-10010 December 1987 Forwards Draft Director'S Decision Re Coalition for Responsible Energy 2.206 Petition Concerning Plant Submitted on 870716,for Comments & Concurrence ML20195F8761987-12-0202 December 1987 Requests Review of Encl Draft SALP Rept for Plant.Recipients Should Be Prepared to Comment on Rept at 871208 Board Meeting.Update of Tables 1-10 Which Includes All Pertinent Data Through End of SALP Period Also Encl ML20236X5801987-11-30030 November 1987 Comments on Draft Director'S Decision on Coalition for Responsible Energy Education 2.206 Petition Re Plant. Editorial Comments for Consideration Marked on Encl Draft ML20247G3591987-09-16016 September 1987 Forwards Info Re Preparedness for Full Power License, Including Open Items Including Allegations & License Conditions,Preoperational & Acceptance Testing Status,Const Status & Status of Insps Required by MC-2512,2513 & 2514 IA-89-226, Forwards Info Re Preparedness for Full Power License, Including Open Items Including Allegations & License Conditions,Preoperational & Acceptance Testing Status,Const Status & Status of Insps Required by MC-2512,2513 & 25141987-09-16016 September 1987 Forwards Info Re Preparedness for Full Power License, Including Open Items Including Allegations & License Conditions,Preoperational & Acceptance Testing Status,Const Status & Status of Insps Required by MC-2512,2513 & 2514 ML20237L7011987-08-31031 August 1987 Notification of 870909 Meeting W/Util in Bethesda,Md to Discuss Proposed Amend to Tech Specs Re Organizational Structure.Meeting Agenda Encl ML20195G3751987-08-21021 August 1987 Forwards Rept Re Licensing & Restart Schedules,Per EDO 870727 Memo.Info Will Be Provided Weekly ML20235V8251987-07-20020 July 1987 Notification of 870730 Meeting W/Util & C-E in Bethesda,Md to Discuss Licensee 870629 Submittal on Cycle 2 Reload IR 05000528/19860261987-07-16016 July 1987 Forwards marked-up Draft NRC Info Notice Entitled Control of Hot Particle Contamination at Nuclear Power Plants, Per 870626 Request.Issuance of Notice Suggested.W/O Encl. Portion of NRC Insp Rept 50-528/86-26 Also Encl 1999-08-27 Category:MEMORANDUMS-CORRESPONDENCE MONTHYEARML20217A8641999-10-0606 October 1999
[Table view]Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 990829-0903 ML20211H4441999-08-27027 August 1999 Notification of Significant Meeting with Util on 990916 & 17 in Arlington,Tx to Improve Utility & NRC Understanding of Industry & Regulatory Perspectives on Current Issues ML20138K0131997-05-0606 May 1997 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal) for Tests Administered on 970324-28 ML20138K0091997-05-0606 May 1997 Forwards NRC Approved Operator Licensing Exam (as-given Operating Exam) for Tests Administered on 970324-28 ML20137F2351997-03-24024 March 1997 Summary of 970207 Meeting W/Listed Attendees in Rockville,Md to Discuss Nuclear Energy Inst Concerns Re Graded Quality Assurance Activities W/Volunteer Plants ML20137C9201997-03-20020 March 1997 Forwards Documentation of Meeting Conducted in Region 4 Office on 970225 to Discuss NRC Enforcement Policy as Applied to Nonescalated Enforcement ML20135E7161997-03-0303 March 1997 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 961118-22 ML20134P2231997-02-20020 February 1997 Discusses Ti 2515/122 Evaluation or Rosemount Pressure Transmitter Performance & Licensee Enhanced Surveillance Programs multi-plant Action B-122 ML20134M2471997-02-14014 February 1997 Submits List of Plants Not Meeting Selection Criteria for Ti 2515/118 Insp on Basis of Factors Such as SWS Operating Experience,Contribution of SWS to Plant Risk Assessment, Licensee Programs in Response to GL-89-13 ML20236U9391995-12-20020 December 1995 Discusses Oi,Region IV Rept of Investigation,Dtd 940511, Case 5-93-023R,which Reported OI Investigative Efforts Re Alleged Employee Discrimination at Plant Units 1,2 & 3.Rept Was Sent to Us Attorney Office in Phoenix,Az in May 1994 ML20138F9871994-08-0303 August 1994 Discusses Allegation RV-94-A-0004,Songs Vendor Manuals. Licensee Reviewed Allegation,Concluded Unfounded & Notified NRC for Conclusion by IA-96-341, Discusses Allegation RV-94-A-0004,Songs Vendor Manuals. Licensee Reviewed Allegation,Concluded Unfounded & Notified NRC for Conclusion by 940228 Ltr1994-08-0303 August 1994 Discusses Allegation RV-94-A-0004,Songs Vendor Manuals. Licensee Reviewed Allegation,Concluded Unfounded & Notified NRC for Conclusion by 940228 Ltr ML20056E5141993-08-12012 August 1993 Submits SALP Schedule for FY94 Per Mgt Directive 8.6 ML20198E3271992-10-20020 October 1992 Notification of Significant Licensee Meeting W/Util on 921027 to Discuss Transfer of Fire Watch Responsibilities to Security Dept & Ongoing Programs within Security Dept ML20126L8441992-09-14014 September 1992 Provides Status Rept Concerning Actions Re Det Performed at Plant ML20127C2461992-03-0202 March 1992 Forwards AEOD SALP Input for Facilities in Support of Ongoing SALP Reviews.Two of Six Important Operating Events Involved Deficiencies of Reactor Power Cutback Sys Which Relies on Proper Functioning of Steam Bypass to Condenser IA-92-218, Forwards Updated Status Rept on Actions Re Diagnostic Evaluation Performed at Facility1990-12-31031 December 1990 Forwards Updated Status Rept on Actions Re Diagnostic Evaluation Performed at Facility ML20127B6281990-12-31031 December 1990 Forwards Updated Status Rept on Actions Re Diagnostic Evaluation Performed at Facility ML20127B5671990-12-12012 December 1990 Forwards NRR Input for SALP Rept,Per NRC Ofc Ltr 907,Rev 1 ,NRC Manual Chapter 0516 & 901120 Memo ML20059M2041990-09-27027 September 1990 Notification of Significant Licensee Meeting W/Util on 901003 to Discuss Licensee Response to Diagnostic Evaluation Team Findings & Overall Status of Programs. Addl NRC Attendees Should Be Made Known by 901002 ML20059L6531990-09-20020 September 1990 Notification of 900921 Meeting W/Util in Walnut Creek,Ca to Discuss Licensee Initiatives & Status in Area of QA ML20059D6361990-08-27027 August 1990 Notification of 900831 Enforcement Conference W/Util in Walnut Creek,Ca to Discuss Medical Qualifications & Exams of Licensed Operators ML20127B4571990-08-24024 August 1990 Comments on Response to Facility Diagnostic Evaluation Team Rept.Suggests That Region V Followup & Closely Monitor Development & Implementation of Specific Tasks Which Will Address Team Findings ML20058M3441990-08-0606 August 1990 Forwards List of Open Items in Sims for Plant.Documented Basis Exists for Closure of TMI Related Items at Plant ML20126L8271990-06-14014 June 1990 Provides Summary of Schedule & Status of Items Re Det of Plant Performed by Aeod,In Response to 900314 Memo ML20127B2171990-01-18018 January 1990 Forwards AEOD Input for Commissioner Curtiss Visit to Plant on 900201,consisting of Summary of Operating Experience from Oct 1988 to Dec 1989 ML20127B1681989-11-0909 November 1989 Forwards NRR Input to SALP for Facilities.Category 2 Rating Assigned in Functional Areas of Plant Operations, Radiological Controls,Emergency Preparedness,Security & Safety Assessment/Quality Verification ML20246N7371989-08-29029 August 1989 Notification of Maint Team Insp Meeting on 890901 W/Util in Phoenix,Az to Discuss Status of Licensee Commitments from 890605 Mgt Meeting in Consideration of Unit 3 Restart ML20127B1401989-08-0707 August 1989 Forwards for Info & Consideration for Info Notice,Lers Describing Potter & Brumfield Relay Problems & Atmospheric Dump Valve Deficiencies.Info Provided as Part of AEOD Function to Identify Potential Adverse Events ML20127G5121989-03-15015 March 1989 Discusses Atmospheric Dump Valve Failures at Plant.Cause Still Under Investigation.Related Documentation Encl ML20236B4871989-03-14014 March 1989 Notification of 890316 Meeting W/Util in Rockville,Md to Discuss Electrical Distribution Sys as Related to Load Injection Event on 890303.Preliminary Agenda for Electrical Meeting Encl ML20206L6701988-11-21021 November 1988 Notification of 881209 Meeting W/Util in Rockville,Md to Present Engineering Excellence Program ML20195G8481988-11-21021 November 1988 Notification of Significant Meeting on 881201 in Wintersburg,Az to Review Util Action on NRC Concerns ML20207D6471988-08-0505 August 1988 Notification of Significant Meeting on 880817 W/Util in Walnut Creek,Ca for Enforcement Conference Re Early Criticality Event at Unit 1,personnel Radiation Overexposure at Unit 2 & Violation Re Essential Chiller Water Sys ML20196L2531988-06-28028 June 1988 Recommends Closeout of Eab Long-Term Followup Item 87-157 on Reactor Coolant Pump Shaft Cracking at Plant.Modified Shafts Installed & Vibration Monitoring Programs in Place ML20150A8971988-06-24024 June 1988 Advises That C-E 880108 Rept of Fuel Surveillance Test Results Previously Submitted to NRC as Nonproprietary Info, Should Be Considered Proprietary ML20196F9801988-06-23023 June 1988 Advises That Licensee 880609 Justification for Continued Operation Re Recent Auxiliary Feedwater Pump Degradation Event Acceptable.Licensee Will Perform Corrective Maint When Replacement Parts Received ML20154N1601988-05-25025 May 1988 Notification of 880531 Meeting W/Util in Rockville,Md to Discuss Evaluation of Failure of Auxiliary Feedwater Pump at Unit 1 & Planned Actions to Correct Root Cause of Failure ML20151E2061988-04-0808 April 1988 Notification of 880414 Meeting W/Util & BNL in Rockville,Md to Discuss Vibration Monitoring Program for Reactor Coolant Pump Shafts & Status on Plant Shaft Evaluations.Agenda Encl ML20148D9491988-03-15015 March 1988 Discusses 880315 Operating Reactors Events Meeting 88-11. List of Attendees,Events Discussed & Tabulation of long-term Followup Assignments Detailed in Encls ML20147H6821988-03-0404 March 1988 Confirms 880302 Telcon Re Evaluation of Justification for Continued Operation.Agreed That Continued Operation of Plant Presents No Undue Risk to Public Health & Safety.Util Received Which Confirms Info Provided by T Polich ML20236X7421987-12-10010 December 1987 Forwards Draft Director'S Decision Re Coalition for Responsible Energy 2.206 Petition Concerning Plant Submitted on 870716,for Comments & Concurrence ML20236W3181987-12-0404 December 1987 Staff Requirements Memo Re Commission 871125 Discussion/Vote in Washington,Dc on Full Power OL for Facility.Commission Requested Staff to Monitor Control Room & Corporate Mgt Activities & to Increase Number of Resident Inspectors ML20195F8761987-12-0202 December 1987 Requests Review of Encl Draft SALP Rept for Plant.Recipients Should Be Prepared to Comment on Rept at 871208 Board Meeting.Update of Tables 1-10 Which Includes All Pertinent Data Through End of SALP Period Also Encl ML20236X5801987-11-30030 November 1987 Comments on Draft Director'S Decision on Coalition for Responsible Energy Education 2.206 Petition Re Plant. Editorial Comments for Consideration Marked on Encl Draft ML20247G3591987-09-16016 September 1987 Forwards Info Re Preparedness for Full Power License, Including Open Items Including Allegations & License Conditions,Preoperational & Acceptance Testing Status,Const Status & Status of Insps Required by MC-2512,2513 & 2514 IA-89-226, Forwards Info Re Preparedness for Full Power License, Including Open Items Including Allegations & License Conditions,Preoperational & Acceptance Testing Status,Const Status & Status of Insps Required by MC-2512,2513 & 25141987-09-16016 September 1987 Forwards Info Re Preparedness for Full Power License, Including Open Items Including Allegations & License Conditions,Preoperational & Acceptance Testing Status,Const Status & Status of Insps Required by MC-2512,2513 & 2514 ML20237L7011987-08-31031 August 1987 Notification of 870909 Meeting W/Util in Bethesda,Md to Discuss Proposed Amend to Tech Specs Re Organizational Structure.Meeting Agenda Encl ML20195G3751987-08-21021 August 1987 Forwards Rept Re Licensing & Restart Schedules,Per EDO 870727 Memo.Info Will Be Provided Weekly ML20235V8251987-07-20020 July 1987 Notification of 870730 Meeting W/Util & C-E in Bethesda,Md to Discuss Licensee 870629 Submittal on Cycle 2 Reload 1999-08-27 Category:NRC TO ASLP MONTHYEARML20128J1721985-07-0808 July 1985
[Table view]Forwards Util Application for SNM License.W/O Encl.Related Correspondence ML20127E9961985-06-20020 June 1985 Urges Substitution of Given Paragraph for Paragraph 1 on Page 8 of Applicant Proposed Initial Decision & Order Re Agricultural Effects of Cooling Tower Drift.Justification of Substitution Provided ML20129H6451985-06-0404 June 1985 Forwards Rev 4 to Util Salt Deposition Monitoring Program, Per 850603 Request.Rev Will Be Incorporated Into Full Power Licenses When Issued.Related Correspondence ML20128P4961985-05-30030 May 1985 Forwards Testimony of RB Samworth Per ASLB Request.Related Correspondence ML20128H4221985-05-23023 May 1985 Confirms 850522 Telcon W/Judge Lazo Re Permission to Defer Filing Testimony of R Samworth Due to Apparent Settlement of Contentions Between West Valley Agricultural Protection Counsil,Inc & Applicant.Related Correspondence ML20054F5811982-06-11011 June 1982 Advises That NRC Intends to Have R Gonzales Introduce Previously Filed Testimony During Hearings Scheduled to Commence on 820622.Rebuttal Testimony Not Presently Contemplated ML20148G1811978-10-30030 October 1978 Forwards 780929 & 780927 NRC Memos Re Recent Underwriters Lab Fire Protec Test to Demonstrate Effectiveness of Area Sprinklers & Mineral Wool Blanket Cable Tray Fire Barriers. (See ANO:7810050359 & 7810050373.) 1985-07-08 |
Text
7L)0 8 %, UNITED STATES ret.ATED CORRESPONW
[ p, NUCLEAR REGULATORY COMMISSION t j wAsmNGTON, D. C. 20655
\...../ July 8, 1985 Dou ETED USMC
'85 JJL -9 All :36 Robert M. Lazo, Esq., Chairman Dr. Richard F. Cole Administrative Judge Administrative Jud Atomic Safety and Licensing Board , _ n _i Spard U.S. Nuclear Regulatory Commission Atomic Safety U.S. Nuclear ands Regul orygpensh@y ission (.
Washington, DC 20555 Washington, DC 20555 Dr. Dixon Callihan Administrative Judge Union Carbide Corporation P.O. Box Y Oak Ridge, TN 37830 In the Matter of ARIZONA PUBLIC SERVICE COMPANY, ET AL.
(PaloVerdeNuclearGeneratingStation,U61Ts'2and3)
Docket Nos. STN 50-529 and STN 50-5300L
Dear Administrative Judges:
For your information, enclosed is a copy of an application by the Arizona Nuclear Power Project for a Special Nuclear Material License for Palo Verde Unit 3.
Sincerely.
2
- M .
Lee S. Dewey Counsel for NRC Staff cc: w/ enclosure Service List h$"Nk a
bOOO O Yc3