ML20128G953

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Rept 50-455/85-04 on 840727-850618 & Notice of Violation
ML20128G953
Person / Time
Site: Byron Constellation icon.png
Issue date: 07/02/1985
From: Harrison J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20128G956 List:
References
NUDOCS 8507090368
Download: ML20128G953 (8)


See also: IR 05000455/1985004

Text

- _ _ _ _ _ _ _

- _ _ _ _ .

_ _ _ . _ - _ _ _ _ _ _

_ _ _ _ _

_

_

_ _ _ .

_

. _ _

_.

. _ _ _ _ _ _ _ _ _ _ _ _ _ _

.

.

JUL 2

1985

Docket No. 50-455

Commonwealth Edison Company

ATTN: Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the special safety inspection conducted by Mr. I. T. Yin of

this office on July 27, 1984, through June 18, 1985, of activities at

Byron Station, Unit 2, authorized by NRC License No. CPPR-131 and to the

discussion of our findings with Mr. E. D. Swartz and others of your staff

at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

During this inspection, certain of your activities appeared to be in violation

of NRC requirements, as specified in the enclosed Appendix. A written response

is required. The violation is repetitive in that a similar instance of failure

to follow ITT-G test procedures was identified during a previous inspection

(Inspection Report Nos. 50-454/84-51; 50-455/84-35 Item 3.b).

In your

response please address the apparent ineffectiveness of your corrective

actions in precluding recurrence.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter, the enclosures, and your response to this letter will be placed

in the NRC's Public Document Room.

The responses directed by this letter (and the accompanying Notice) are

not subject to the clearance procedures of the Office of Management and

Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

g g dti7n d b fJ 7Ji Harri m

J. J. Harrison, Chief

Engineering Branch

-

8507090368 850702

PDR

ADOCK 05000455

J

G

PDR

g g

- -

-

-

-

.

-

__

__

._

_-

l

._

.

.

Commonwealth Edison Company

2

JUL 2

1985'

Enclosures:

1.

Appendix, Notice

of Violation

2.

Inspection Report

No.50-455/85004(DRS)

- cc w/ enclosures:

D. L. Farrar, Director

of Nuclear Licensing

V..I. Schlosser, Project Manager

Gunner Sorensen, Site Project

Superintendent

R. E. Querio, Plant Manager

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII Byron

Resident Inspector, RIII

Braidwood

Phyllis Dunton, Attorney

General's Office, Environmental

Control Division

D. W. Cassel , Jr. , Esq.

Diane Chavez, DAARE/ SAFE

W. Paton, ELD-

L. Olshan, NRR LPM

H. S. Taylor, Quality Assurance

Division

'

E. Chan, ELD

- J. Stevens, NRR

,

4

.

RIII

RIII

RIII

RI I

W

V

FornE'$r

Harrison

' - in/jk

.D

03

07/02/85

f'4

q[s/f(

1t e

t

.

"

W

G

ar

~$4

T

--

9 -

---m

-,w-r

Y

8

Y

~ Cf

+'-T

-F

'~~'V' ' ' ' *

"'-"*""*W*W

-

O

'"-

7