i jy
. _g.,. e. e i.%
UPkHA11NG DATA AkPORI 4
DOCRET NO. 53 - 277 e-DATE MAY 15e1985 COMPLETED BY PHILADELPHIA ELEOIRIC COMP 6Y W.M.ALDEN ENGINEER-IN-CHARGE
=
LICENSING SECTION GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-5022
, OPERATING STATUS
- 1. UNIT NAMES PEACH BOTTOM UNIT 2 i NOTES: UNIT 2 CONTINUED ITS l
l 1
- 2. REPORTING PERIODS APRILe 1985 l
SCHEDULED SHUTDOWN FOR I
I I
- 3. LICENSED THERMAL POWERIMWTi s.
3293 l
ITS SIXTH REFUELING AND 1
- e.
8 l
- 4. MAMEPLATE RATING (GROSS MWEls 1152 1
MAINTENANCE OUTAGE.
I 1
I 5.i DESIGN ELECTRICAL RATING (NET MWE):
1065 l
l 1
I 6.fMAXIMUM DEPENDA&LE CAPACITY-(GROSS MWEI 1998 l
l l
.I
- 7..MAK10EJM DEPENDASLE CAPACITV (NET MWEl s 1051-1 I
l S.1F CHANGES DCGUA IN CAPACITY RATiteGS (IMMS NUMBEA 3 THROUGH Tl.SINCE LAST REPORT, GIVE RE ASONS&
- 9. POWER LEVEL TO NMICM RESTRICTED, AF ANY INET 16MEls
- 10. REASONS FOR RESTRICTIONS e IF ANY i
a THIS MONTH YR-TO-DATE CUMULATIVE
- 11. HOURS IN REPDATING PERIOD 719 2,879 94e871
- 12. NUM6ER OF HOURS REACTOR W AS CRITICAL 0
0 62.243.6
- 13. ' REACTOR RESERVE SHUTDOWN 60045 0.0 0.0 0.0 g
c
- 14. Hour $ GENERATOR G8-LINE 0.0 0.0 60,556.6 15.' UNIT RESERVE SHUTDOWN HDURS 0.0 0.0 0.0 1,
- 16. GROSS THERMAL ENERGY GENERATED (MWHI O
O 178.420.001
- 17. GROSS ELECTRICAL ENERGY GENERATE.D (MWH) 0 0
58,718,660
- 14. NET ELECTRICAL EldERGY GENERATED (MWHI
-9.799
-2ae403 56,235,935
- 19. UNIT SERVICE FACTOR 0.0 0.0 63.8
- 20. UNIT AVAILABILITY FACTOR 0.0
~ 0.0 63.8
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 0.0 0.0 56.4 222. 4Nily ramar :TY FACTOR (USING DER-NET) -- ---
0.0 - - - -
-0.0-
' - - +- - 5 5.7- - -
l
)
'23. UNIT FORCED DUTAGE RATE 0.0 0.0 12.5
- 24. SHUTD0 teds SCHEDULED DVER NEXT 6 MONTHS (TYPEe DATE, AND DURATION OF EACHis SCHEDULED SmlTD(MN FOR REFUELING AND MAINTENANCE, STA RTED 4/27/84
- 25. IF SHUTDOWN AT Ele OF REPORT PERIODe ESTIMATED DATE OF STARTUPs 06/10/85
- 24. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATIONis FORECAST ACHIEVED IN1T1AL CRITICALITY 8505300336 850430 PDR ADOCK 05000277 ThQ INITIAL ELECTRICITY R
\\
COMMERCI AL OPERATION 6E)RlED FOR CONSISTENCY NITH FEDERAL ENERGY REGULATORY COMMISSION kEPORTS.
OPERATIE DATA REPORT 00CKET NO. 53 - 278 DATE MAY 15,1985 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY
'. s W.M.ALDEN ENGINEER-IN-CHARGE LICENSING SECTION GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-5022
- OPERATING STATUS
- 1. UNIT NAMES PEACH 60TTOR Uh1T 3 l' NOTES: UNIT 3 2NCURRED'ONE SCHEDULED l i
1
- 2. REPORTING PERIOD:
APRIL, 1985 l
LDAD DROP. UNIT IN POWER l
1 I
- 3. LICENSED THERMAL POWER (MW118 3293 l
CDASTDOWN.
1 g
g
- 4. NAMEPLATE RATING (GROSS MWEls 1152 1
1 I
i
- 5. DESIGN ELECTRICAL kATING (NET MWE):
1065 I
i i
i
- a.. MAXIMUM DEPEh0A&LE CAPACITY (GROSS MWEls 1098 I
l l
l
. 7. MA&lMUN DEPENDASLE CAPACITV (NET MWE):
- 1035, I
l "iS. AF;CNeediESiDC&UR IN CAPAC13Y RATAMES 11TEMS NUM&EA 3 THRQUGH 7) SINCE LAST REPORTe GIVE. RE ASONSs
- 9. Pf)WER LEVEL TO WHICH RESTRICTEDe 'IF, ANY tNET MwE3:
- 10. REASONS FOR RESTRICTIONS, IF t.NY:
THIS MONTH YR-TO-DATE CUMULATIVE
- 11. HOURS IN REPORTING PER100 719 2,879 90.767
- 12. NUM8ER OF HOURS REACTDA WAS CRITICAL 719.0 2.240.7 6ee798.2 21&.< A6 ACTOR RESERVE 3 HOT 00MN leURS 0.0 0.0 0.0 719.0 2.189.3 65.054.4
'- 34. AMMRS SENEAATDA (30-LINE
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENEAGY GENERATED (MWH) 2.078,568 6,222e912 190,422,720 i
- 17. GROSS ELECTRICAL ENERGY GENERATED (MuH) 676,080 2,042,380 62,549.920 1,960.5b 00:0o9,818 i
- 14. NET ELECTRICAL ENERGY GENEAATED (MWH) -
646,499
- 19. UNIT SERVICE FACTOR 100.0 76.0 71.7
- 20. UNIT AVAILASILITY FACTOR 100.0 76.0 71.7
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 86.9 65 8 63.9
- 22. UNIT CAPAC 1TY FACTOR-(USING-DER.NETl -
"i A 43.4 12.1
~
~~
- 23. UNIT FORCEO OUTAGE RATE 0.0 1
7.3 I
- 24. SHUTD0tMS SCHEDULED DVER NEXT 6 MONTHS (TYPE, DATE AND 00 RATION OF EACHl l
REFUELING AND MAINTENANCE OUTAGES FROM 6/14/85 FOR a WEEKS UNTIL 4/17/85.
I
- 25. IF SHUTDOWN AT Ele OF REPORT PERIODe ESTIMATED DATE OF STARTUP:
l
- 26. UNITS IN TEST STATUS (PRIOR TD COMMERCIAL OPERAT10Nis FORECAST ACHIEVED INITIAL CAITICALITY INITIAL ELECTRICITY COMMERC1 AL OPERATION t
m
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 - 277 UNIT PEACH BOTTOM UNIT 2 DATE MAY 15,1985 COMPANY PHILADELPHIA ELECTRIC COMPANY W.M.ALDEN ENGINEER-IN-CHARGE LICENSING SECTION GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-5022 MONTH APRIL 1985 DAY
. AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWEANET)
(MWE-NET) 1 0
17 0
2 0
18 0
3 0
19 0
4 0
20 0
5 0
21 0
-6 0
22 0
7 0
23 0
8 0
24 0
9 0
25 0
l 10 0
26 0
l 11 0
27 0
12 0
28 0
13 0
29 0
14 0
30 0
i 15 0
16 0
I i
L
, AVERAGE DAILY UNIT POWER LEVEL DOCKET No. 50 - 278 UNIT PEACH BOTTOM UNIT 3 DATE MAY 15,1985
~'
COMPANY PHILADELPHIA ELECTRIC COMPANY W.M.ALDEN ENGINEER-IN-CHARGE LICENSING SECTION GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-5022 MONTH APRIL 1985 DAY AVERAGE DAILY POWER LEVEL.
DAY AVERAGE' DAILY POWER LEVEL
'930 17 2897 2
92 1 18 894 3
932 19 692 4
932 20 619 5
930 21 857 i
f 6
930 22 892 7
931 23
-901 8
929 24 900 9
928 25 895 10 920 26 900 4
11 921 27 891 12 910 28 Sol
.13 911 29 897 14 911 30 897 15 907 16 902
h
)
DOCRET ND. 50 - 2TT UNIT SHuTOOWM5 AND POWER REDUCTIONS 9
~
UNIT NAME PEACH 30TTOM UNIT 2 DATE MAY 15,1985 REPORT NONTH APRILe 5965 COMPLETED BY. PHILADELPHIA ELECTRIC COMPANY
~
W.M.ALDEN ENGINEER-IN-CHARGE LICENSING SECTION GENERATION DIVISION-NUCLEAR TELEPHONE (2151 841-5022 I
J l
l l METMID OF l LICENSEE 45YSTEMICOMPONENTl CAUSE AND CORRECTIVE I
ITYPElDURATION !REASONISMJTTING DOWNI EVENT
- l. CODE I CODE ACTION TO NO.B DATE I (131 (HOURS 14 (23 I REACTDR (3) i REPORT e I (4) 8 (5)
PREVENT RECURRENCE I
I I
I l
i I
I l
1 4 850401 1 5 1 719 0 i C l 1
l' NA i RC l FUELXX L SHUTDOWN FOR ITS SIXTH REFUELING, MAINTENANCE, 8
I I
I i
1 l
l l AND MAJOR MODIFICATION OUTAGE.
I I
I I
I I
I I
I i
l
! 7 19.0 1
I I
I I
l (3)
(4)
(13 (2)
EXHIEIT G - INSTRUCTIONS METMID FOR PREPARATION OF DATA F - FORCED REASON 1 - M ANUAL ENTRY SHEETS FOR LICENSEE 5 - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 2 - MANUAL SCRAM.
B - MAINTENANCE OR TEST 3 - AUTOM ATIC SCRAM.
EVENT REPORT (LER)
C - REFUELING 4 - OTHER (EXPLA1N)
FILE (NUREG-Ol613 D - REGULATORY RE51RICTION E - OPERATDR TRAINING
- LICENSE EXAMINATION (5)
F - ADMINISTRATIVE G - OPERATIONAL ERRDR (EXPLAIM 3 EXHIBIT 1 - SAME SOURCE
~
H - OTHER(EXPLAINI D
D D
UNIT SitlTDOWNS AND POWER REDUCTIONS DOCKET ND. 50 - 278 klNtf NAME PEACH BOTTOM UNIT 3 DATE MAY 15,1985 REPORT MONTH APRIL, *1965 CdMPLETED BY PHILADELPHIA ELECTRIC COMPA W.M.ALDEN ENGINEER-IN-CHARGE LICENSING SECTION
- GENERATION DIVISION-NUCLE AR TELEPHONE (215I 841-5022 l
1
-1 I
I METH00 0F l LICENSEE ISYSTEMICOMPONENT CAUSE AND CORRECTIVE I
I TYPE l DURATI ON I RE A50N i $ltlTTING DOWN !
EVENT l CODE I CODE ACTION TO NO.B DATE l (Ill (HOURSIl (2) ! REACTOR (3) i REPORT $ l (4) l (5)
]REVENT RECURRENCE I
I I
I I
I i
T I 850420 i S I 000.0 i
F l 4
i N/A l CH I HTEXCH l LOAD REDUCTION TO ISOLATE THE STH FEEDWATER i
l I
I I
I l
l HEATERS AND TO ADJUST CONTROL ROD PATTERN.
I I
I I
I I
I I
1 I
I I
I I
I I
I (1)
(2)
(33 (4)
F - FORCED REASON METHOD EXHIBIT G - INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILtRE (EXPL AIN) 1 - M ANUAL FOR PREPARATI[N OF DATA B - MAINTENANCE OR TEST 2 - M ANUAL SCRAM.
ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM.
EVENT REPORT (LERI D - REGULATORY RESTRICTION 4 - OTHER (EXPLAINI FILE (NUREG-0161)
E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE (5)
G - OPERATIONAL ERROR (EXPLAIN)
EXHIBIT I - SAME SOURCE H - OTHER(EXPLAIN) 9
-w
rocket No. 50-277-Attachrent to Monthly Oparating' Report for' April, 1985 REFUELING INFORMATION 1.
Name of. facility:
Peach Botter Unit 2 2.
Scheduled date for next refueling shutdown:
~
April 27, 1984 - In progress 3.
Scheduled date for rastart following refueling:
June 10, 1985 4.
Will refueling or resurption of operation thereafter require a technical specification change or other license amendment?
Yes If answercis yes, Phnt, in general,' will these.be?
-Arendrent #108 uns-issued March 19,.1985.
5.
Scheduled date(s).for submittine proposed licensing action and supporting information:
Reload 6 license anendront wac issued March 19, 1985.
6 Irpcrtant licensing considerations ascociated with refueling, e.g.,
new or different fuel design or supplier, unreviewed design or performance analycis methods, significant changes in fuel design, new operating procedures:
Not applicable.
7.
The number of fuel assemblics (a) in the core and (b) in the spent fuc3 storage pools (a)
Cerc,- 764 Fuel Asserbifes to be returned frcm fuel pool (b)
Fuel Pool - 1170 Fuel Assemblies, 58 Fuel Pode 8.
The present licensed spent fuel pool storage capacity and the size L
of'eny increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
The spent fuel pool storage capacity has been relicensed for 2816 fuel assemblies.
9.
The projected date of the last refueling that can be discherged to the spent fuel peel assuning the present licenred capacity.
Septerber, 1990 (March, 1986, with reserve full core discharge)
~
b'.
M
Decket No. 50-27C=
Attachment to
[,;
-Monthly Operating 4* E Report for April,.1985 REFUELINC INF0FMATION' 1.
-Name of facility:
g b
i Peach Dottor Unit 3 2.
Scheduled date for next refueling shutdovn:
June 14, 1985 3.
Scheduled date for restart following refueling:
August 17, 1985-4.
Will refueling or renunption of operaticn thereafter reauire a technical specification change or other license amendment?
Yes.
' lIf.cansver is yes, what, in general, will-these be?
~ Technical Speci ficatiens - to accorrodate reload - fuel.
Modifications to reactor core operating limits.
5.
Scheduled date(s) for subnitting proposed licensing action and supporting information:
MAPL 11GE Limits Subnitted January 7, 1985 Additional Core Limit Inforration - April 12, 1985 6.
Irportant' licensing considerations asscciated with refueling, e.g., new or-different fuel design ~or supplier,'unreviewed design
~or perforrance analysis nethods,-significant changes in fuel
, design,.new operating procedures:
None expected.
7.
The nunber of fuel asserblies (a) in the core and (b) in the spent fuel storage pools (a)
Core - 764 Fuel Asserblics (b)
Fuel Pool - 1212 Fuel Assemblies, 6 Fuel Pods 8.
The present licensed spent fuel pool storage capacity and the size
.of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
The opent fuel. pool sterage capacity has been_ relicensed for 2816 fuel assemblies.
9.
The projected date of the last refueling that can he dircharged to the. spent fuci pool assuming the present licensed capacity.
~
September, 1991 (March, 1987, with reserve for full core discharge) t-
Dockot Nos. 50-277/50-278 Attschmsnt to Monthly Operating Report for April, 1985 Peach Bottom Atomic Power Station Nairative Summary of Operating Experiences April, 1985 UNIT 2 The Refueling / Pipe Replacement outage continued throughout the month of April.
All piping work is completed.
Major activities
= remaining are fuel loading, reactor vessel reassembly and hydrostatic testing, containment leak rate testing, post modification testing, and normal plant prestartup checkout.
l--
During April, main steam line isolation valve work, control rod drive preventative maintenance, and the core. spray system check off list were' completed.
Emergency service water piping is in
=
l.
-the process of being cleaned of iron oxide deposits believed to have built up in this; system because of._its. low flow and standby tamde of operation.
UNIT 3 The unit began the month limited to 90% power due to high offgas radiation levels.
On April 20, load was reduced to adjust rods to the all rods full-out position and remove the_Sth stage feedwater heat in
.i i
= order to extend' core reactivity life time.- This maneuver ~will maximize power output during the coastdown period until the unit is removed for refueling in late June.
l The unit ended the month at 905 power due to end-of-core life i
coastdown.
i i
l l
/sLz s
.m
PHILADELPHIA ELECTRIC COMPANY 23O1 MARKET STREET P.O'. BOX 8699 PHILADELPHIA, PA.19101 May 15, 1985 Docket Nos. 50-277 50-278 Director Office of Inspection & Enforcement US Nuclear Regulatory Commission Washington, DC 20555 Attention:
Document Control Desk
SUBJECT:
Peach Bottom Atomic Power Station Monthly Operating Report Gentlemen:
Attached are twelve copies of the monthly operating report for Peach Bottom Units 2 and 3 for the month of April, 1985 forwarded pursuant to Technical Specification 6.9.1.C under the guidance of Regulatory Guide 10.1, Revision 4.
Very truly our,
l
/r R. H. Logue Superintendent Nuclear Services Attachment cca Dr. T. E. Murley, NRC l
Mr. T. P. Johnson, Resident Inspector Mr. Stan P. Mangi, Dept. of Envir. Resources Mr. P. A.
Poss, NRC (2 copies)
INPO Records Center I
sp i
I b
l i