Relay Evaluation Rept for Resolution of USI A-46
ML20128G587
Person / Time
Site: Pilgrim
Issue date: 09/30/1996
From:
BOSTON EDISON CO.
To:
Shared Package
ML20128G462 List:
References
REF-GTECI-A-46, REF-GTECI-SC, TASK-A-46, TASK-OR NUDOCS 9610090076
Download: ML20128G587 (134)


Text

_.

Enclosure C Relay Evaluation Report for the Resolution of USI A-46 i

9610090076 960930 PDR ADOCK 05000293 P

PDR a

1 i'

l Boston Edison Company Pilgrim Nuclear Power Station I

j Relay Evaluation Report for the i

Resolution of USI A-46 i

f f

M-l.

l I

i i

I l

i i

l September 1996 Revision 0 i

l L

1 4

Table of Contents

.t

1. I ntrod ucti o n...........................................................

,i

2. Summary and Report Organi ration......................................................... 3 3

i

3. Methodology for Relay Selection............................................................. 4 4

4

4. Methodology for Relay Seismic Eva'uation.................................................... 4 4
5. Utilization of Switchgear Screening Data..................................................... 5 2
6. Outlier Resolution..................................

.................................................6

7. Relay Walkdown and Mounting Spot Check................................................. 6 4

1 J

8. R ef e r e nce s........................................................

i Attschments:

J J

1. Essential Relay List for the Resolution of USI A.46
2. Outlier Relays I
3. Safety implication of Outliar Relays
4. Essential Relay Walkdown Record
5. Resumes i

Page 2

Relay Evaluation Report 2

1. Introduction Unresolved Safety issue (USI) A-46, " Seismic Qualification of Equipment in Operating Plants" (Reference 1) addresses issues associated with seismic adequacy of equipment in older nuclear operating power plants. The NRC request to the " older plants" to evaluate the seismic adequacy of their equipment and resolve the USl A-46 issue is found in Generic Letter (GL) 87-02 (Reference 2). To address this issue and to work wiu the NRC Nring the resolution process, a utility owners group, Seismic Qualification Utility Group (SQUG) was formed. As a result of research conducted by SQUG and its contractors and reviewed by the NRC staff, a detailed procedure called the " Generic implementation Procedure (GlP) for Seismic Verification of Nuclear Power Plant Equipment"(Reference 3) was developed. GIP Revision 2 and the clarifications, guidance and additional requirements provided by the NRC in SSER #2 were used in the ;elsmic evaluation of equipment at Pilgrim Station for the resolution of USl A-46.

Revision 2 of the GIP, referred to as GIP-2 by the NRC, is referred to as the GlP in this report.

As a part of GL 87-02 resolution, a relay seismic functionality review is required. The components requiring this relay review are identified in Boston Edison Company's Safe Shutdown Equipment List Report for PNPS (Reference 4). The overall purpose of the relay seismic functionality review is to verify that the safe shutdown functions will not be adversely affected by relay malfunction in the event of a Safe Shutdown Earthquake (SSE).

2. Summary and Report Organization Boston Edison evaluated relays associated with electrically controlled or powered safe shutdown equipment whose function could be affected by relay malfunction and identified 622 essential relays that require seis. :..:apacity versus demand screening.

Section 3 of this report outlines the relay etsluation process used to identify the essential relays. Section 4 outlines the capacity versus demand screening process and current status of outliers. Seismic capacity versus dertand screening is complete on 512 out of the 622 essential relays.110 relays are still undergoing review and for the purpose of this report are identified as interim outliers. Boston Edisjon intends to continue to pursue seismic verification of these relays using the options identified in the GlP. is the "Essent!al Relay List for the Resolution of USI A-46". Th;s is a list of the 622 essential relays, with their seismic verification bases or outlier status, sorted by relay number and panel location. The safe shutdown equipment for which chat;er of the listed relay is considered unacceptable is identified in the column titled

" Equip ID". is the list of 110 "Outiler Relays". Section 6 of this report contains a discussion relative to outlier relays.

Page 3

i i

i

, details the " Safety implication of Outlier Relays". This attachment i

l discusses Pilgrim Station's operability with outlier relays.

' is the " Record of Essential Relay Walkdown for USl A-46 Project".

Section 7 of this report contains a discussion relative to relay walkdown.

l provides the " Resumes of Lead Relay / Relay Reviewers".

j

3. Methodology for Relay Selection The methodology used for relay' screening is consistent with Section 6 of the GIP 4

(Reference 3) as modified by the SSER#2. This process consists of three basic parts:

(1) identification of electrical equipment for relay review, (2) identification of relays associated with the electrical equipment, and (3) screening of relays.

j Electrical equipment is identified on the " Relay Review Safe Shutdown Equipment List",

hereafter referred to as the Relay Review SSEL, which lists the active electrical equipment identified in each of the safe shutdown paths, and passive electrical equipment whose inadvertent change of state due to relay chatter could adversely affect safe shutdown function (s). For the complete " Relay Review SSEL", please refer i

to Section 4 of Attachment A to the SF

'down Equipment List Report (Reference 4).

As part of the relay review effort, criteria was established for the performance of each tem of equipment on the Relay Review SSEL during the strong shaking period of the wismic event. This criteria identified unacceptable equipment behavior (s) or changes of state, that were in tum used by the relay reviewers performing circuit analysis, relay identification, and relay screening. For each component on the Relay Review SSEL, associated relays were identified and screened into one of the following four categories based on its physical characteristics and susceptibility to chatter.

1. Essential - the established criteria for the equipment is violated. This relay requires capacity versus demand screening.
2. Chatter Acceptable - relay is susceptible to chatter, but chatter is acceptable for the associated equipment because the criteria is not violated.
3. Not Vulnerable - relay is mechanically actuated or solid state and, therefore, not susceptible to chatter.
4. Operator Action - chatter is acceptable because operator action to reset or correct the resulting change of state is feasible.

The relays screened " Essential" and therefore subject to seismic screening are listed in, " Essential Relay List for the Resolution of USI A-46".

4. Methodology for Relay Seismic Evaluation This section describes the methodology utilizeci for seismic evaluation (capacity versus demand screening) of essential relays at Pilgrim Station. For the purpose of seismic evaluation, the essential relays were divided into the following 4 categories:

Category 1: Capacity versus demand comparison could be performed based on available GERS.

Page 4

1 i

Category 2:

Relays in low voltage switchgear an:1 capacity versus demand e

co nparison could be performed based on switchgear C.ERS Category 3: Capacity versus demand comparison cou'.d be performed based on e

other available documentation.

Category 4: Relays mounted on diesel generator skid or engine and routinely subject to high vibration during operation.

A seismic capacity versus demand comparison is performed for relays in Categories 1 through 3. The location and mounting of relays in Category 4 on the diesel generator was verified by walkdown. The relay seismic capacity was compared to the demand based on panellocation and amplification characteristics consistent with Reference 5.

If a relay met the verification criteria for a particular category, it was determined to be acceptable. These relays were subsequently designated SQ1 through SO4, as appropriate. Relays that could not be determined acceptable were designated OL1 through OL4. An explanation of SQ1 through SQ4 and OL1 through OL4 follows:

SQ1 Relay seismically verified. Relay GERS available and GERS exceeds panel seismic demand.

SQ2 Relay seismically verified. Relay in low voltage switchgear and where the GERS exceeds floor seismic demand.

SQ3 Relay seismically verified. Relay seismic capacity exceeds seismic demand based on available documentation.

SO4 Relay seismically verified. Relay mounted on diesel generator skid or engine and routinely experiences high vibration during operation.

OL1 Relay an outlier. Relay make and/or model number currently unknown.

OL2 Relay an outlier. Relay seismic capacity currently unknown.

)

OL3 Relay an outlier. Relay seismic capacity less than seismic demand.

OL4 Relay an outlier. Time delay pickup outside the normal timing range as defined in the applicable GERS.

5. Utilization of Switchgear Screening Data Screening techniques provided by EPRI GERS-MVS/LVS.7, " Generic Equipment Ruggedness Spectra for Switchgear (Medium Voltage, Metal Clad) (Low Voltage, Metal Enclosed)", dated 2/91 were not utilized for completed relay capacity / demand i

evaluations in this report. However, this methodology may be utilized for verification of some of the outlier relays which are located in and directly control switchgear.

Page 5

1

6. Outlier Resolution 110 relays out of a total of 622 essential relays are classified as " Outlier Relays". The number of relays associated with each category are as follows:

OL1 - 11 Relays OL2 - 89 Relays l

OL3 - 7 Relays e

OL4 - 3 Relays e of this report provides a complete list of all outlier relays at Pilgrim Station sorted by the above categories and describes the most probable method to be employed for resolution. This attachment provides Relay ID, Panel Number, Relay Manufacturer and Relay Model Number relative to each outlier. Safety implication of outlier relays is discussed in Attachment 3 of this report.

Outlier relays at Pilgrim Station will be resolved utilizing one or more of the following methods:

Equipment performance criteria revision Circuit Analysis Outlier relay comparison with similar seismically verified relays e

Seismic Testin0 e

7. Relay Walkdown and Mounting Spot Check A walkdown of ninety (90) relays on the Essential Relay List was performed in support of the relay evaluation portion of the USl A-46 Project. These ninety relays, housed in five different panels, located in the main control room (2), cable spreading room (2),

and ' A" emergency diesel generator room (1), were examined with regards to:

1. Confirmation of make and model number of the relays; and, 2, Adequacy of relay mounting within the panel. provides documentation for relay walkdowns and mounting spot checks.

No anomalies were found.

Page 6

i 1

8. References 1.

USNRC Unresolved Safety issue A-46, " Seismic Qualification of Equipment in i

Operating Nuclear Power Plants".

2.

NRC Generic Letter 87-02, " Verification of Seismic Adequacy of Mechanical and Electrical Equipment in Operating Reactors, Unresolved.e,afety Issue (USI) A-1

{

46", February 19,1987 and Supplement No.1 dated May '

1~

3.

Seismic Qualification Utility Group, " Generic Implementatt

.ocedure (GIP) for Seismic Verification of Nuclear Power Plant Equipment", Revision 2.

j 4.

Boston Edison Company," Safe Shutdown Equipment Ust Report for Pilgrim j

Nuclear Power Station", Revision 0, S/96 l

5.

Elactric Power Research Institute Report NP-7146-SL R1, " Guidelines for I

Development of in-Cabinet Seismic Demand for Devices Mounted in Electrical Cabinets", dated 6/95 I

N i

1 4

k j

i i

?

i 1

l

}

Page 7

m i

\\

i 4

I J

ATTACHMENT 1 ESSENTIAL RELAY LIST FOR THE RESOLUTION OF USl A 46 l

O M

Boston Ecison Company Pilgrim Nuclear Power Station j

l Essential Relay List for the l

Resolution ofUSI A-46 l

l l

l M-l l

Page i d 77 l

l I

L

~-

-. ~

contact states conteet seare e... :..:

Pilgrim NuclearPc ;.-Station EssentialRelay Contacts MoneyID Panel Notes SAT SQ Basis Bldg Elevetters ht.n -Mturer hfodelNnmpber Schemette Number Equip no (NONcp (Yemwo) 1 102-504 A504 ES SO1 TB 370" Agastat 2412PBL 1

E38/E6 A504 NC No 2

102-804 A804 ES SQ1 TB -

23'0" Agostat 7012PA 2

E38/E6 A604 NC No 3

103A C6 ES OL3 RW 3T r G==i e Electric 12HFA151A2F B'106 NC No 3

E173/E1 GeEEElectric 12HFAtSTA2F 4

1038 C6 4

ES OL3 RW 37 0" 4

E173/E1 B206 NC No 5

103C C6 ES SQf RW 37 0" General Electric 12HFA151A2F 5

M6-22-14 SH.1E20 B106 NO No 6

M6-22-14 SH 1E20 SV4569A NO No 7

M6-22-14 SH.1/E20 SV4570A NO No 8

M6-22-14 SH.f E20 SV4587A NO No 9

M6-22-14 SH 1E20 SV45678 NO No 6

103D C6 E3 SQt RW 3T F General Electric 12HFAtStA2F 10 M6-22-14 SH 2E18 8206 NO No 11 MS-22-14 SH.2E18 SV4569B NO No 12 M6-22-14 SH.2E18 SV45708 NO No 13 M6-22-14 SH.2E18 SV4589A NO No 14 M6-22-14 SH 2/E18 SV45898 NO No 7

104C C6 ES SQt RW 37 0" Ge-,M Electric 12HFA151A2F 15 E18/E8 VAC205A-1 NO No 16 E18/E8 VAC2058-1 NO No 17 E18/E8 VAC205C-1 NO No 18 E18/E8 VAC2050-1 NO No 19 E18/E8 VAC205E-1 NO No 20 E18/E8 VAC205F-t NO No 21 E18/E8 VAC206A-1 NO No 22 E18/E8 VAC2068-1 NO No 8

1040 C6 ES SO1 RW 3T F General Electric 12HFA151A2F 23 E18/E8 VAC205A-2 NO No 24 E18/E8 VAC2058-2 NO No 25 E18/E8 VAC205C-2 NO No 26 E18/E8 VAC2050-2 NO No 9/f8/98 Rev. EO Page: 2 of 77

~-

e contact States connect score Energtreet Pilgrim Nuclear Power Station Essential Relay Contacts

." " j 60 Panet Notes SAT SO Basis BMg Elevation Manufacturer ModelNumber schemnoc Nwnser Equap so poNcp tYeswe) 27 E18/E8 VAC205E-2 NO No s -

,=

28 E18/E8 VAC205F-2 NO N+

n -

e.

29 E18/E8 VAC206A-2 NO No s -, w,=

30 E18/E8 VAC206B-2 NO No s_

=

9 104E C6 ES SQ1 RW 37 0" General Electnc 12HFA151A2F 31 E18/E7 B106 NO No 32 E18/E7 SV4569A NO No 33 E18/E7 SV4570A NO No 34 E18/E7 SV4587A NO No 35 E18/E7 SV45878 NO No 10 104F C8 ES SQ1 RW 37 0" General Electric 12HFA151A2F 38 E18/E7 B206 NO No 37 E18/E7 SV45696 NO No 38 E18/E7 SV4570B NO No 39 E18/C7 SV4589A NO No i

40 E18/E7 SV45898 NO No 11 104G C8 ES SQt RW 3T 0" G..-se Electric 12HFA151A2F 41 E18/E7 8106 NO No 42 E18/E7 B208 NO No 43 E18/E7 SV4569A NO No 44 E18/E7 SV45698 NO No 45 E18/E7 SV4570A NO No 48 E18/E7 SV45708 NO No 47 E18/E7 SV4587A NO No 48 E18/E7 SV45878 NO No 49 E18/E7 SV4589A NO No 50 E18/E7 SV45898 NO No 12 105E C6 ES OL2 RW 3T 0" General Electric HF 454J 51 E18/E8 VAC205A-1 NO No 52 E18/E8 VAC2058-1 NO No 53 E18/E8 VAC205C-1 NO No 54 E18/E8 VAC2050-1 NO No 55 E18/E8 VAC205E-1 NO No 56 E18/E8 VAC205F-1 NO No.

57 E18/E8 VAC206A 1 NO No 9/fS48 Rev EO Page: 3 of 7i

Contact States coneser stee.

En.,;, ear Pilgrim Nuclest Power Station Essential Relay Contacts Reney D Panel Notes SAT SQ Basis Bldy Elevatlors Manufacturer ModelNuoreber schemetre Numser Equip ID 00(M4C)

(YesNo) 58 E18/E8 VAC206B-1 NO No 13 105F C6 ES OL2 RW 3T 0" General Etectne HFASAJ 59 E18/E8 VAC205A-2 NO No 60 E18/E8 VAC2059-2 NO No 61 E18/E8 VAC205C-2 NO No 62 E18/E8 VAC2050-2 NO No 63 E13/E8 VAC20SE-2 NO No 64 E18/E8 VAC205F-2 NO No 65 E18/E8 VAC206A-2 NO No 66 E18/E8 VAC2068-2 NO No 14 105XA1 C208 ES SQt RB 2T O' G-ie Electric CR120B0 67 E189/Sh2/E4 VAC205A-1 NC No 68 E189/St.2/E4 VAC205B-1 NC No 69 E189/Sh2/E4 VAC205C-1 NC No 70 E189/Sh2/E4 VAC2050-1 NC No 71 E189/Sh2/E4 VAC205E-1 NC No 72 E189/Sh2/E4 VAC205F-1 NC No 73 E189/Sh2/E4 VAC206A-1 NC No 74 E189/Sh2/E4 VAC2068-1 NC No 15 10SXB1 C209 ES SQt RB 23'0" General Electre CR120BD 75 E189/Sh2/E4 VAC205A 2 NC No 76 E189/Sh2/E4 VAC2059-2 NC No 77 E189/Sh2/E4 VAC205C-2 NC No 78 E189/Sh2/E4 VAC2050-2 NC No 79 E189tSh2/E4 VAC205E-2 NC No 80 E189/Sh2/E4 VAC205F-2 NC No 81 E189/Sh2/E4 VAC206A-2 NC No 82 E189/Sh2/E4 VAC2068-2 NC No 16 10A-K100143A C903 ES SO3 RW 37 0' Agostat EGPl 83 M1H39/E11 M010017A NO No 17 10A-K1001-438 C903 ES SO3 RW 3T U" Agostat EGPt 84 M1H40/E9 M010017B NO No 18 10A-K1001-43C C903 ES SQ3 RW 37 0" Agostet EGPI 85 M1H16-5/E8 M01001-7C NO No 9/f8W Rev.EO Pete: 4 of TT

contact states Centact Store Enerptsed Pilgrim Nuclear Power Station Essential Relay Contacts Relay JD Penel Notes SAT SQ Basis Bldg Elevation Manufacturer ModelNumber schemenc Numeer Equip IO tFONC)

(YestFio) 19 10A-K1001-430 C903 ES SO3 RW 37 0" Agastat EGPl 86 M1H17-5/E6 M01001-7D NO No 20 10A-K102A C932 ES SQt RW ^

27 0-General Electnc 12HGA11 A52F 87 M1H7-12E18 SV203-3A NO No 88 M1H7-12E18 SV203-38 NO No 89 M1H7-12E18 SV203-3C NO No 90 M1H7-12/E18 SV203-3D NO No i

21 10A-K1028 C933 ES SO1 RW 27 0" G=.=r. Electric 12HGA11 A52F 91 M1H9-12E17 SV203-3A NO No 92 M1H9-12E17 SV203-38 NO No 93 M1H9-12E17 SV203-3C NO No 94 M1H9-12/E17 SV203-30 NO No 22 10A-K105A C932 4

ES SO1 RW 27 0" General Electric 12HGA11A52F 95 M1H8-10/E19 MO1001-28A NO No 96 M1H8-10/E19 M O1001-288 NO No 97 M1H8-10/E19 MO202-5A NO No 98 M1H8-10/E19 MO202-58 NO No 23 10A-K1058 C933 4

ES SQt RW 27 0" General Electric 12HGA11 A52F 99 M1H10-10/E16 MO1001-28A NO No 100 M1H10-10/E16 M01001-288 NO No 101 M1H10-10/E16 MO202-St.

NO No 102 M1H10-10/E18 MO202-5B NO No 24 10A-K10A C932 ES SOS RW 27 (T General Electric 12HFA151 A2F 103 E18/E7 B106 NO No 104 M1H8-10/E19 MO1001-28A NO No 105 M1H8-10/E19 M01001-288 NO No 106 M1H8-10/E19 MO202-5A NO No 107 M1H8-10/E19 MO202-58 NO No 108 E18/E7 SV4569A NO No 109 E1847 SV4570A NO No 110 E18/E7 SV4587A NO No 111 E18/E7 SV45878 NO No 112 E18E8 VAC205A-1 NO No 113 E18/E8 VAC2058-1 NO No S/f8/98 Rev.EO Page: S of 77

i contact states Contact State Enerptred Pilgrim Nuclear Power Station Essential Relay Contacts RelayID Panel Notes SAT SQBasis Bldg Elevadon Manufacturer ModelNumber schenette Number Equlp 10 tNONC) tYeswo) 114 E18/E8 VAC205C-1 NO No s-e, 115 E18/E8 VAC2050-1 NO No s

-e e-116 E18/E8 VAC205E 1 NO No s-e.,-

117 E18/E8 VAC205F-1 NO No s - e.e. e-.=,.=*=

118 E18/E8 VAC206A-1 NO No 119 E18fE8 VAC2068-1 NO No s.

em.=, w 25 10A-K10B C933 ES SQ1 RW 23'0" G-we Electric 12HFA151A2F 120 E18/E7 B206 NO No 121 M1H10-10/E16 MO100128A NO Jo 122 M1H10-10/E16 MO1001-288 NO No 123 M1H10-10/E16 M O202-5A NO No 124 M1H10-10/E16 MO202-58 NO No 125 E18/E7 SV45698 NO No 126 E18/E7 SV45708 NO No 127 E18/E7 SV4589A NO No 128 E18/E7 SV4589B NO No 129 E18/E8 VAC205A-2 NO No 130 E18/E8 VAC2058-2 NO No 131 E18/E8 VAC205C-2 NO No 132 E18/E8 VAC2050-2 NO No 133 E18/E8 VAC205E-2 NO No 134 E18/E8 VAC205F-2 NO No 135 E18/E8 VAC206A-2 NO No 136 E18/E8 VAC2068-2 NO No 26 10A-K152A C2233A 4

ES SQ3 RW 23'(T Agoetet EGP9002 137 M1H7-12/E18 M01001-28A NO No 138 M1H7-12/E18 MO1001-288 NO No 139 M1H7-12/E18 MO202-5A NO No 140 M1H7-12/E18 MO202-58 NO No 141 M1H7-12/E18 VAC205A.1 NO No 142 M1H7-12/E18 VAC205A-2 NO No 143 M1H7-12/E18 VAC2058-1 NO No 144 M1H7-12/E18 VAC2058-2 NO No 145 M1H7-12/E18 VAC205C-1 NO No 146 M1H7-12/E18 VAC205C-2 NO No 9/fW Rev. EO Page: 8 of

____._.__m Contact States contact state Ewrised Pilgrim Nuclear Power Station Essential Relay Contacts Relay DO Penet Notes SAT SQBests Bldg Elevation heat.ufacturer htodelNumber schematic Number Equsp to tuowc)

(Yesnwo) 147 M1H7-12/Ei8 VAC205D-1 NO No s-w 148 M1H7-12/E18 VAC2050-2 NO No 149 M1H7-12/E18 VAC205E-1 NO No s-w 150 M1H7-12/E18 VAC205E-2 NO No e-w,=-

151 M1H7-12E18 VAC205F-1 NO No s -

w

.===

152 MtH7-12/E18 VAC205F-2 NO No s -

w

,=.e-153 M1H7-12/E18 VAC206A-1 NO No s.- w

.=e-154 M1H7-12E18 VAC206A-2 NO No

-w, 155 M1H7-12,E18 VAC2068-1 NO No w,

156 M1H7-12E18 VAC2068-2 NO No s -

w,====

27 10A-K1528 C22338 4

ES SQ3 RW 27 (T Agostet EGPB002 157 M1H7-12E18 M01001-28A NO No 158 M1H7-12/E18 M01001-288 NO No 159 M1H7-12/E18 M O202-5A NO No 160 M1H7-12E18 MO202-5B NO No 161 M1H7-12E18 VAC205A-1 NO No 162 M1H7-12E18 VAC205A-2 NO No 163 M1H7-12E18 VAC2058-1 NO Nc 164 M1H7-12/E18 VAC2058 2 NO No 165 M1H7-12E18 VAC205C-1 NO No 166 M1H7-12E18 VAC205C-2 NO No 167 M1H7-12/E18 VAC2050-1 NO No 168 M1H7-12/E18 VAC2050-2 NO No 189 M1H7-12E18 VAC205E-1 NO No 170 M1H7-12E18 VAC205E-2 NO No 171 M1H7-12E18 VAC205F-1 NO No 172 M1H7-12E18 VAC205F-2 NO No 173 M1H7-12E18 VAC206A-1 NO No 174 M1H712E18 VAC206A-2 NO No 175 M1H7-12E18 VAC2068-1 NO No 176 M1H7-12E18 VAC2068-2 NO No 28 10A M152C C2233A ES S03 RW 27 0" Agostet EGPB002 177 M1H7-12E15 B106 NO No 178 M1H7-12E15 B206 NO No 179 M1H7-12E15 SV4569A NO No S/f8/98 Rev E0 Pere: Tor 7:

contsCt states Pilgrim Nuclear Power Station Essential Relay Contacts Contact State EneryIzed RelayID Panel Notes SAT SQ Basis B!dg EI*vation L.vi-cturer ModelNumber schemede NutrM EM IO 900NC)

O'esNo) 180 M1H7-12/E15 SV45698 NO No s

-e w

e-181 M1H7-12/E15 SV4570A NO No 182 M1H712/E15 SV45708 NO No 183 M1H7-12/E15 SV4587A NO No 184 M1H7-12/E15 SV45878 NO No 185 M1H7-12/E15 SV4589A NO No 186 M1H7-12/E15 SV45898 NO No e m e.ee m.oo.=on 29 10A-K152D C22338 ES SO3 RW 27 0" Agostat EGPB002 187 M1H9-12/E14 8106 NO No 188 M1H9-12/E14 B208 NO No 189 M1H9-12/E14 SV4569A NO No 190 M1H9-12/E14 SV4569B NO No 191 M1H9-12/E14 SV4570A NO No 192 M1H9-12/E14 SV45708 NO No 193 M1H9-12/E14 SV4587A NO No 194 M1H9-12/E14 SV4567B NO No 195 M1H9-12/E14 SV4589A NO No 196 M1H9-12/E14 SV45898 NO No 30 10A-K153A C2233A 4

ES SO3 RW 23'0" Agostat EGPB002 197 M1H7-12/E18 M01001-28A NO No 198 M1H7-12/E18 M01001-288 NO No 199 M1H7-12/E18 MO202-5A NO No 200 M1H7-12/E18 MO202-5B NO No 201 M1H7-12/E18 VAC205A-1 NO No 202 M1H7-12/E18 VAC205A-2 NO No 203 M1H7-12!E18 VAC2058-1 NO No 204 M1H7-12/E18 VAC205B-2 NO No 205 M1H7-12/E18 VAC205C-1 NO No 206 M1H7-12/E18 VAC205C-2 NO No 207 M1H7-12/E18 VAC2050-1 NO No 208 M1H7-12/E18 VAC205D-2 NO No 209 M1H7-12/E18 VAC205E-1 NO No 210 M1H7-12/E18

.VAC205E-2 NO No 211 M1H7-12/E18 VAC205F-1 NO No 212 M1H7-12/E18 VAC205F-2 NO No 9/f8/98 Pope: 8of17 Rev.EO

(

s contact states Pilgrien Nuclear Power Statfort Esserstial Relay Contacts Conenct state Ene.ptred Melay AD Panet Notes SAT SQBasis BIdg Elevation Manufacturer ModelNumber Schematic Number CMC tNONC)

(YesNo) 213 M1H712/E18 VAC206A-1 NO No s.

w

,w 214 M1H7-12/E18 VAC206A-2 NO No s - seen w.=,-

215 M1H7-12/E18 VAC2068-1 NO No n

-s w

,w 216 M1H7-12/E18 VAC2068-2 NO No s.

w 31 10A-K1539 C22338 4

ES SQ3 RW 23'0" Agostat EGPB002 217 M1H7-12/E18 M01001-28A NO No 218 M1H7-12/E18 MO1001-288 NO No 219 M1H7-12!E iB M O202-5A NO No 220 M1H7-12/E18 MO202-58 NO No 221 M1H7-12/E18 VAC205A-1 NO No 222 M1H7-12/E18 VAC205A-2 NO No 223 M1H7-12/E18 VAC2058-1 NO No 224 M1H7-12/E18 VAC2058-2 NO No 225 M1H7-12/E18 VAC205C-1 NO No 226 M1H7-12/E18 VAC205C-2 NO No 227 M1H7-12/E18 VAC2050-1 NO No 228 M1H7-12/E18 VAC2050-2 NO No 229 M1H7-12/E18 VAC205E-1 NO No 230 M1H7-12/E18 VAC205E-2 NO No 231 M1H7-12/E18 VAC205F-1 NO No 232 M1H7-12/E18 VAC205F-2 NO No 233 M1H7-12/E18 VAC206A-1 NO No 234 M1H7-12/E18 VAC206A-2 NO No 235 M1H7-12/E18 VAC20CB-1 NO No 236 M1H7-12/E18 VAC2068-2 NO No 32 10A-K153C C2233A ES SO3 RW 23'0" Agostat EGP8002 237 M1H7-12/E15 -

8106 NO No 238 M1H7-12/E15 8206 NO No 239 M1H7-12/E15 MO2301-14 NO No 240 M1H7-12/E15 M O2301-8 NO No 241 M1H7-12/E15 SV4569A NO No 242 M1H7-12/E15 SV45698 NO No v

243 M1H7-12K15 SV4570A NO No 244 M1H7-12/E15 SV45708 NO No 245 M1H7-12/E15 SV4587A NO No 9/ft/98 Page: 9 of17 Rev EO

contact states Conrect store enerpsied Pilgrim Nuclear Power Station Essential Relay Contacts ReleyID Panel Notes SM SOBasis Bldg Elevation Manutseturer Atoder Number schemette Number Equip so promc) gYeoma) 246 M1H7-12E15 SV4587B NO No 247 M1H7-12/E15 SV4589A NO No e.

248 M1H7-12/E15 SV4589B NO No s -

w,,

s.

e==

33 10A-K153D C22338 ES SO3 RW 23T Agastat EGP8002 249 M1H9-12/E14 B106 NO No 250 M1H9-12/E14 8206 NO No 251 M1H9-12/E14 M O2301-)4 NO No 252 M1H9-12/E14 MO2301-8 NO No 253 M1H9-12/E14 SV4569A NO No 254 M1H9-12E14 SV4569B NO No 255 M1H9-12E14 SV4570A NO No 256 M1H9-12/E14 SV4570B NO No 257 M1H9-12/E14 SV4587A NO No 258 M1H9-12/E14 SV4587B NO No 259 M1H9-12/E14 SV4589A NO No 260 M1H9-12/E14 SV4589B NO No 34 10A-K156A C2233A 4

ES SO3 RW 27 r Agostat EGPB002 261 M1H7-12E18 M01001-29A NO No 262 M1H8-1GrE19 MO1001-298 NO No 35 10A-K156B C2233B 4

ES SO3 RW 27 U" Agastat EGPB002 263 M1H10-10/E16 M01001-29A NO No 264 M1H10-10/E16 MO10C1-298 NO No 36 10A-K18A C932 ES SQ1 RW 27 0" General Electric 12HGA11 A52F 265 M1H20-4/E7 P203A NO No 37 10A-K18B C933 ES SO1 RW 27 0" Gese Electric 12HGA11 A52F 266 M1H20-4/E7 P2038 NO No 36 10A-K21A C932 ES SO1 RW 27 0" General Electric 12HGA11 A52F 267 M1H20-4/E7 P203C NO No 39 10A-K218 C933 ES SO1 RW 270" Gn+4 Electne 12HGAt1 A52F 268 M1H20-4/E7 P2030 NO No 40 10A-K27A C932 ES SQt RW 27 0" General Electric 12HFA151A2F 269 M1H8-10/E19 MO1001-28A NO No 270 M1H8-10/E19 M01001-28B NO No 271 M1H8-10/E19 MO202-5A NO No S/18/98 Rev E6 Page: 10 of 77

-.~

Contact States contact store en.+ :

Pilgrien Nuclear Power Station Essential Relay Contacts Melay DO Panel Notes SAT SQ Basis Bldg Elevation Manufacturer ModelNumber schemenc Num6er Equap so tNowcp tvesme) 272 M1H8-10/E19 M O202-5B NO No 41 10A-K27B C933 ES SQt RW 27 0" G=>-..; Elactric 12HFA151A2F 273 M1H10-10/E16 M01001-28A NO No M01001-288 NO

, No

,274 M1H10-10/E16

,MO202-5A NO No 275 M1H10-10/E16 276 M1H10-10/E16 MO202-58 NO No 42 10A-K28A C932 ES 503 RW 270" Agostat ETR1403A003 277 M1H8-10/E19 M01001-28A NO No 278 M1H8-10E19 M01001-288 NO No 279 M1H8-10/E19 MO202-5A NO No 280 M1HS-10/E19 MO202-58 NO No 43 10A-K288 C933 ES SQ3 RW 27 0" Agastat ETR1403A003 281 M1H10-10/E16 M01001-28A NO No 282 M1H10-10/E16 MO1001-28B NO No 283 M1H10-10/E16 MO202-5A NO No 284 M1H10-10/E16 MO202-58 NO No 44 10A-K33A C932 4

ES SQ1 RW 27 0" General Electric 12HGA11 A52F 285 M1HS-10/E19 M01001-28A NO No 286 M1H8-10/E19 M01001-288 NO No 287 M1H8-10/E19 MO202-5A NO No 288 M1H8-10/E19 MO202-5B NO No 45 10A-K338 C933 4

ES SQ1 RW 27U" General E;ecu;-

12HGA11 A52F 289 M1H1010/E16 MO1001-28A NO No 290 M1H10-10/E16 M01001-288 NO No 291 M1H10-10/E16 MO202-5A NO No 292 M1H10-10/E16 MO202 58 NO No 48 10A-K34A C932 ES SQ3 RW 27 F Av.wat ETR1403A003 293 M1H8-10/E19 MO1001-28A NO No 294 M1H8-10/E19 M01001-288 NO No 295 M1H8-10/E19 M O202-5B NO No 47 10A-K348 C933 ES SQ3 RW 27 0" Agastat ETR1403A003 296 Mt H10-10'E16 M01001-28A NO No 297 M1H10-10/E16 M01001-288 NO No 298 M1H10-10/E16 MO202-5B NO No Wft/96 Rev.EO Page: 11 of TT

contact states conrect store Enerpfreer EssentialRelay Contacts Pilgrim Nuclear Power St ~

MeieyID Panel w.es SAT SO Basis Bldg Elevadon Manufacturer ModelNumber schemede Number EquQ D

@ONC)

(YeeMo) 48 10A-K37A C932 4

ES SQ1 RW 27 0" General Etectric 12HFA151A2F 299 M1H8-10/E19 MO202-5A NO No 49 10A K37B C933 4

ES SO1 RW 21 0" GeneralElectric 12HFA151 A2F 300 M1H10-10/E16 MO202-5A NO No 50 10A-K38A C932 ES SQ1 RW 27 0" General Electric 12HFA151A2F 301 E410/E10 M O202-5A NO No 51 10A-K38B C933 ES SQt RW 27 F Gweers:Electnc 12HFA151A2F 302 E410/E10 MO202-5A NO No 53 10A-K39A C932 4

ES SQ1 RW 2J 0*

General Electric 12HFA151A2F 303 M1H8-10/E19 M O202-5A NO No 53 10A-K39B C933 4

ES SQ1 RW 27 U*

Generat Electric 12HFA151A2F 304 M1H10-10/E15 MO202-5A NO No 54 10A-K40A C932 ES SQ3 RW 27 0" Agastat ETR14D3A003 305 M1H8-10/E19 M01001-28A NO No 306 M1H8-10/E19 M01001-28B NO No 307 M1H8-10/E19 MO202-58 NO No l

55 10A-K438 C933 ES SQ3 RW 27 7 Agostat ETR14D3A003 308 M1H8-10/E19 M01001-28A NO No 309 M1H8-10/E19 M01001-28B NO No 310 M1H10-10/E16 MO202-58 NO No 58 10A-K42A C932 ES SQ1 RW 27 0" General Electric 12HFA151A2F 311 E410/E10 MO202-58 NO No 57 10A-K428 C933 ES SO1 RW 2J 0" General Electric 12HFA151A2F 312 E410/E10 MO202-58 NO No 58 10A-K43A C932 4

ES SQ1 RW 27 0" Gei w.:Ei a k 12HFA151A2F 313 M1H10-10/E16 M01001-28A NO No 314 M1H10-10/E16 MO1001-28B NO No 315 M1H8-10/E19 MO202-5B NO No l

59 10A-K438 C933 4

ES SQt RW 270" General Electric 12HFA151A2F 316 M1H8-10/E19 M01001-28A NO No 317 M1H8-10/E19 M O1001-28B NO No

(

318 M1H10-10/E16 M O202-5B NO No 80 10A-K44A C932 4

ES SO1 RW 27 0*

General Electne 12HFA151A2F 9/f8.98 Rev.E0 Paee: 12 of TT

contact States contact stare E - pied Pilgrien Nuclear Power Station Essential Relay Contacts Reiny D Penel Notes SAT SQ Basis Bldg Elevadon Manufacturet ModelNurnber schematte Number Equip JO INONC)

(YeeMe) 319 M1H712E18 M01001-29A NO No s.

w a, a.*-

320 M1H7-12E18 M01001-299 NO No s_

w,--

61 10A-K44B C933 4

ES SO1 RW. 23 0" Generaf Efectric 12HFA151A2F 321 M1H9-12/E17 M01001-29A NO No 322 M1H912/E17 MO1001-29B NO No 62 10A-K5A C932 4

ES SQt RW 23'0" General Efectne 12HFA151A2F 323 M1H7-12/E18 M01001-28A NO No 324 M1H7-12/E18 M01001-288 NO No 325 M1H7-12/E18 MO202-5A NO No 326 M1H7-12/E18 MO202-58 NO No 327 M1H7-12/E18 VAC205A-1 NO No 328 M1H7-12/E18 VAC205A-2 NO No 329 M1H7-12/E18 VAC2058-1 NO No 330 M1H7-12/E18 VAC2058-2 NO No 331 M1H7-12/E18 VAC205C-1 NO No 332 M1H7-12/E18 VAC205C-2 NO No 333 M1H7-12E18 VAC2050-1 NO No 334 M1H7-12E18 VAC2050-2 NO No 335 M1H7-12E18 VAC205E-1 NO No 336 M1H7-12/E18 VAC205E-2 NO No 337 M1H7-12E18 VAC2C6F-1 NO No 338 M1H7-12K18 VAC205F-2 NO No 339 M1H7-12/E18 VAC206A-1 NO No 340 M1H7-12/E18 VAC206A-2 NO No 341 M1H7-12'E18 VAC2068-1 NO No t

342 M1H7-12/E18 VAC2068-2 NO No 63 10A-KSB C933 4

ES SQ1 RW 2T 0" General Electric 12HFA151A2F 343 M1H7-12E18 MO1001-28A NO No 344 M1H7-12E18 M01001-288 NO No 345 M1H7-12E18 M0102-5A NO No 346 M1H7-12/E18 MO2OSS NO No 347 M1 H7-12E18 VACEr'." !

NO No 348 M1H7-12E18 VAC205A-2 NO No 349 M1 H7-12/E18 VAC2058-1 NO No 350 M1H7-12/E18 VAC2058-2 NO No 9/18.98 Rev.E0 Page: 13 of 77

contact states Contact state Enerptsed Pilgrien Nuclear Power Station Essential Relay contacts Metey 80 Penel Notes SAT sQ Baals B!de Epevetion Manutecturer ModelNun,ber schemenc Number EM C (NONC)

(YesMe) 351 M1H7-12/E18 VAC205C-1 NO No s-352 M1H7-12/E18 VAC205C-2 NO No w,

353 M1H7-12/E18 VAC205D-1 NO No 354 M1H7-12/E18 VAC205D-2 NO No 355 M1H7-12/E18 VAC205E-1 NO No s.

w

- ;.w,

356 M1H7-12/E18 VAC205E-2 NO No s-w 357 M1H7-12/E18 VAC205F 1 NO No s-,,

358 M1H7-12/E18 VAC205F-2 NO No s -, w 359 M1H7-12/E18 VAC206A-1 NO No s

e.

360 M1H7-12/E18 VAC206A-2 NO No s.

361 M1H7-12/E18 VAC2068-1 NO No s.

362 M1H7-12/E18 VAC206B-2 NO No s_

w, 64 10A-K86A C932 ES SQ1 RW 23'0" G=ws: Electric 12HFA151A2F 363 M1H16-5/E8 MO1001-29A NO No 65 10A-K66B C933 ES SQ1 RW 23'0" General Electric 12HGA11 A52F 364 M1H16-5/E8 M0100129A NO No 66 10A-K67A C932 ES SO1 RW 23'0" General Electric 12HGA11 A52F 365 M1H17-5/E7 MO1001-298 NO No 67 10A-K678 C933 ES SQt RW 23'0" General Electric 12HFAtS1A2F 366 M1H17-5/E7 MO1001-298 NO No 68 10A-K6A C932 4

ES SQ1 RW 23'0" General Electric 12HFA151A2F 367 M1H7-12/E15 B106 NO No 368 M1H9-12/E14 B206 NO No 369 M1H7-12/E15 SV4569A NO No 370 M1H9-12/E14 SV45698 NO No 371 M1H7-12/E15 SV4570A NO No 372 M1H9-12/E14 SV45708 NO No 373 M1H7-12/E15 SV4587A NO No 374 M1H7-12/E15 SV4587B NO No 375 M1H9-12/E14 SV4589A NO No 376 M1H9-12/E14 SV4589B NO No C9 10A-K68 C933 4

ES SO1 RW 23'0" General Electric 12HFA151A2F 377 M1H7-12/E15 B106 NO No 378 M1H9-12/E14 B206 NO No s/fsee Rev.EO Pepe: f 4 or 77

contact states contact state Enerstred Pilgrint Nuclear Power Station Essential Relay Contacts Relay D Pane!

Notes SAT SQ Basis Bldg Elevation Manufacturer ModelNumber schemette Number Equip 80 INONC)

(Yeswo) 379 M1H7-12/E15 SV4569A NO No 3,.-,.,,,,,,.

380 M1H9-12/E14 SV45698 NO No

sww, 381 M1H7-12/E15 SV4570A NO No s-,w 382 M1H9-12/E14 SV4570B NO No
  • 383 M1H712/E15 SV4567A NO No w,,

384 M1H7-12/E15 SV4587B NO No 385 M1H912/E14 SV4589A NO No w,

386 M1H9-12/E14 SV45898 NO No s.

e.

=,

70 10A-K70A C932 ES SQ3 RW 23'0" Agostet ETR 387 M1H7-12/E15 P203A NO No 71 10A X709 C933 ES SQ3 RW 23 (r Agostet ETR 388 MtH9-12/E13 P2038 NO No 73 10A-K75A C932 ES SO3 RW 23'0" Agostet ETR 389 M1H7-12/Et 5 P203C NO No 73 10A-K75B C933 ES SO3 RW 23'0" Agostet ETR 390 M1H9-12/E13 P2030 NO No 74 10A-K7A C932 4

ES SQ1 RW 23'0" Genetel Electnc 12HFA151A2F 391 M1H7-12/E18 M01001-28A NO No 392 M1H7-12/E18 M01001-288 NO No l

393 M1H7-12/E18 M O202-5A NO No l

394 M1H7-12/E18 M O202-5B NO No 395 M1H7-12/E18 VAC205A-1 NO No 396 M1H7-12/E18 VAC205A-2 NO No 397 M1H7-12/E18 VAC2058-1 NO No 398 M1H7-12/E18 VAC205B-2 NO No 399 M1H7-12/E18 VAC2050-1 NO No 400 MlH7-12/E18 VAC205C-2 NO No 401 M1H7-12/E18 VAC2050-1 NO No 402 M1H7-12/E18 VAC2050-2 NO No 403 M1H7-12/E18 VAC205E-1 NO No 404 M1H7-12/E18 VAC205E-2 NO No 405 M1H7-12/E18 VAC205F-1 NO No 406 M1H7-12/E18 VAC205F-2 NO No 407 M1H7-12/E18 VAC206A-1 NO No 9/tCM6 Rev EO Page: 15 of 77

contact States contact store gnerptred Pilgrins Nuclear Power Station Essential Relay Contacts Reiny 60 Penel Notes SAT SQBasis BMg Elevation Manufacturer ModelNumber senemenc Nwnser gm powc)

(Yeemo) 408 M1H7-12/E18 VAC206A-2 NO No s-.

409 M1H7-12/E18 VAC2068-1 NO No s.

410 M1H7-12/E18 VAC2068-2 NO No s.

,w 12HFA151A2F 75 10A K78 C933 4

ES SO1 RW 27 0" General Ekdr.c' M1H712/E18 M01001-28A NO No 411 412 M1H7-12/E18 M01001-288 NO No 413 M1H7-12/E18 MO202-5A NO No 414 M1H7-12/E18 MO202-58 NO No 415 M1H7-12/E18 VAC205A-1 NO No 416 M1H7-12/E18 VAC205A-2 NO No 417 M1H7-12.E18 VAC2058-1 NO No 418 M1H7-12/E18 VAC2058-2 NO No 419 M1H7-12/E18 VAC205C-1 NO No 420 M1H7-12/E18 VAC205C-2 NO No 421 M1H7-12/E18 VAC2050-1 NO No 422 M1H7-12/E18 VAC205D-2 NO No 423 M1H7-12/E18 VAC205E-1 NO No 424 M1H7-12/E18 VAC205E-2 NO No 425 M1H7-12/E18 VAC205F-1 NO No 426 M1H7-12/E18 VAC205F-2 NO No 427 M1H7-12iE18 VAC206A-1 NO No 428 M1H7-12/E18 VAC208A-2 NO No 429 M1H712/E18 VAC208B-1 NO No 430 M1H7-12/E18 VAC208B-2 NO No 78 10A-K87A C932 ES SQt RW 27 0" General E6d.'c 12HGA11 A52F 431 E5010/E10 MO1001-28A NO No 77 10A-K878 C933 ES SQt RW 27(T General Electric 12HGA11A52F 432 E5010/E10 MO1001-28A NO No 78 10A-K88A C932 ES SO1 RW 27 0*

Go se: Electric 12HGA11 A52F k

433 E5010/E10 MO1001-288 NO No 79 10A-K888 C933 ES SQ1 RW 27 0" General Electric 12HGA11A52F 434 E5010/E10 M01001-288 NO No i

SO 10A-K8A C932 4

ES SO1 RW 27 0*

General Electric 12HFA151A2F 435 M1H7-12/E15 8106 NO No i

9/f8/DS Rev.E0 Page: 18 W11

contact States Contact state Enerptsed Pilgrim Nuclear P&a.-Station Essential Relay Contacts

.MiJO Penet Notes SAT SQ Besis 9Idg Elevation htonufac'turer hiodelNumber schemene Numser Equep a peowcp (vesmo) 43C M1H9-12E14 B206 NO No s -, w,=

437 M1J16-10/E22 MO2301-14 NO No s.

w

.=

438 M1J1610522 M O2301-8 NO No s -

e. e-==,.=

439 M1H7-12E15 SV4569A NO No 440' M1H9-12/E14 SV45690 NO No*

s.

,w s - e.e. w

.= =

441 M1H7-12E15 SV4570A NO No s.

e.w.m.,== -

442 M1H9-12E14 SV4570B NO No s m w.m.v.===.

443 M1H7-12E15 SV4587A NO No s_

w.

444 M1H7-12E15 SV45878 NO No s.= _

e.e= w.==,====

445 M1H912414 SV4589A NO No s.

e.w.*, -==

446 M1H9-12E14 SV45898 NO No s,

=

81 10A-K8B C933 4

ES A01 RW 27 F General Electric 12HFA151A2F 447 M1H7-12E15 8106 NO No 448 M1H9-12E14 B206 NO No 449 M1J16-10E22 MO2301-14 NO No 450 M1J16-10/E22 MO2301-8 NO No 451 M1H7-12E15 SV4569A NO No 452 M1H9-12E14 SV4569B NO No 453 M1H7-12E15 SV4570A NO No 454 M1H9-12E14 SV45708 NO No 455 M1H7-12E15 SV4587A NO No 456 M1H7-12E15 SV45870 NO No 457 M1H9-12/E14 SV4589A NO No 458 M1H9-12E14 SV45898 NO No 82 10A-K90A C932 4

ES SQt RW 270" Ge =.e: E;cctr.G 12HFA151A2F 459 M1H7-12E18 M01001-29A NO No 460 M1H8-10/E19 M01001-298 NO No 83 10A-K908 C933 4

ES SQ1 RW 27 0" Genes s; Electric 12HFA151A2F 461 M1H7-12E18 MO1001-29A NO No 462 M1HS-10E19 MO1001-298 NO No 84 10A-K92A C932 4

ES SO1 RW 27 7 General Electne 12HFA151A2F 463 M1H8-10/E19 MO1001-28A NO No 464 M1H8-10/E19 M01001-288 NO No 465 M1H8-10/E19 MO202-5A NO No 466 M1H8-10/E19 MO202-58 NO No 9/18M6 g,,, go Page: 17 of 77

e contact states Pilgrirn Nuclear Power Station Essential Relay Contacts Contact state Enerptred ReneyID Panel Notes SAT SQ Basis Bldg Eceve0on Menurecturer Moder Number schemenc Nur.+er Eng c powcp (res4*op 85 10A-K928 C933 4

ES SO1 RW 27 tT General Electric 12HFA151A2F 467 M1H10-10/E16 M01001-2",A NO No 468 M1H10-10/E16 MO1001-28B NO No 469 M1H10-10/E16 M O202-5A NO No 470 M1H10-10/E16 M O202-5B NO No 86 10A-K9A C932 ES SOf RW 27 0-General Electnc 12HFA151A2F 471 E18/E7 8106 NO No 472 E18/E7 SV4569A NO No 473 E18/E7 SV4570A NO No 474 E18/E7 SV4587A NO No 475 E18/E7 SV4587B NO No 476 E1tL'E8 VAC205A.1 NO No 477 E18/EB VAC2058-1 NO No 478 E18/E8 VAC205C-1 NO No 479 E18/E8 VAC2050-1 NO No 480 E18/E8 VAC205E-1 NO No 481 E18/E8 VAC205F-1 NO No 482 E18/E8 VAC206A's NO No 483 E18/E8 VAC206B-1 NO No 87 10A-K98 C933 ES SQt RW 27 0' General Electnc 12HFA151A2F 484 E18/E7 B206 NO No 485 E18/E7 SV45698 NO No 486 E18/E7 SV45708 NO No 487 E18/E7 SV4589A NO No 488 E18/E7 SV4589B NO No 489 E18/E8 VAC205A-2 NO No 490 E18/E8 VAC205B-2 NO No 491 E18/E8 VAC205C-2 NO No 492 E18/E8 VAC2050-2 NO No 493 E18/E8 VAC205E-2 NO No 494 E18/E8 VAC205F-2 NO No 495 E18/E8 VAC206A-2 NO No 496 E18/E8 VAC2068-2 NO No 88 127-504/1 A504 ES OL2 TB 37 0' General Electnc 12tAV5381 A 497 E38/E6 A504 NC Yes 9/f&98 Page: 18 of 77 p,,, go m.

contact states Pilgrim Nuclear Pcz.^ Station Essential Relay Contacts censoce sesee Enwytred

.=, JD Paael Notes SAT SQBasis Bldg Elevation Manufacturer ModelNumber schemenc Number Equip D geconcy (YesNo) 498 ES-1224BC/E1 B106 NC Yes s=

499 ES-122-8BC!E1 SV4569A NC Yes 500 ES-1224BC/E1 SV4570A NC Yes 501 ES-1224BCIE1 SV4587A NC Yes 502 E5-1224BC/E1 SV4587B

' NC Yes s?

=

89 127-504r2 A504 ES OL2 TB 37 0-General Electric 12tAV5381A 503 E38/E6 A504 NC Yes 504 E5-1224BC/Et B106 NC Yes 505 ES-1224BC/E1 SV4569A NC Yes 506 ES-122-8BC/E1 SV4570A NC Yes 507 ES-1224BC/E1 SV4587A NC Yes 506 E5-1224BC/E1 SV45878 NC Yes 90 127-504X A504 ES OL3 TB 37 0-GenereI Electric 12HFA51A42H

$09 E38/E6 A504 NO/NC No 510 E18/E7 B106 NO No 511 E18/E7 SV4569A NO No 512 E18/E7 SV4570A NO No 513 E18/E7 SV4587A NO No 514 E18/E7 SV4587B NO No 91 127 604/1 A604 ES OL2 TB 23'0-Generel Electric 121AV5381A 515 E38/E6 A604 NC Yes 516 E5-146-8BC/E1 B206 NC Yes 517 E5-146-8BC/E1 SV45698 NC Yes 518 E5-1464BCIE1 SV45708 NC Yes 519 E5-146-8BC/E1 SV4589A NC Yes 520 E5-146-8BC/E1 SV45898 NC Yes 92 127404r2 A604 ES OL2 TB 23'0" General Electric 12tAV5381A 521 E38/E6 A604 NC Yes 522 ES-1464BC/E1 B206 NC Yes 523 ES-146-8BC/E1 SV45698 NC V=

524 ES-1464BC/E1 SV4570B NC Yes 525 E5-146-8BCIE1 SV4589A NC Yes 526 E5-146-8BC/E1 SV45898 NC Yes 93 127-604X A604 ES OL3 TB 23'0" General Electric 12HFA51A42H S/f8/98 Pape: 19 of 77 Rev. EO

I contact states coneocs sme enerres e

Pilgrim Nuclear Power Station Essential Relay Contacts Meiey DO Penet Notes SAT SQ Beste Bedg Elevenon h8enuf\\ncturer needelNtmeber schemenc Numser Eququ no W)

(veswe) 527 E38/E6 A604 NO/NC No e.

e.se e.

528 E18/E7 B206 NO No s.

w a===

529 E18/E7 SV45698 NO No e w w w =, =i==

530 E18/E7 SV45708 NO No 531 E18/E7 SV4589A NO No

n. -

w

.=ia.

s-i.e.* =====

532 E18/E7 SV4589B NO No s.

  • =, a.in.

94 127A-504/1 AA504 ES SQ3 TB 37 r ITE Electreaf 211T4375 533 E35/E4 A504 NC Yes 95 127A-504/2 AA504 ES SO3 TB 37 0" ITE Electreal 211T4375 534 E35/E4 A504 NC Yes 96 127A-504/3 AA504 ES SO3 TB 37 0" ITE Electrical 211T4375 535 E38/E6 A504 NC Yes 97 127A-504/4 AA504 ES SO3 TB 37 0" ITE Electrical 211T4375 536 E35/E4 A504 NC Yes 98 127A-804/1 AA604 ES SO3 TB 27 0" ITE EkiA.;

211T4375 537 E35/E4 A604 NC Yes 99 127A-004/2 AA604 ES SO3 TB 27 0" ITE Electreal 211T4375 538 E35/E4 A604 NC Yes 100 127A-804/3 AA604 ES SO3 TB 23 7 ITE Electrical 211T4375 539 E35/E4 A604 NC Yes 101 127A-604/4 AA804 ES SO3 TB 27 0" ITE Electrical 211T4375 540 E35/E4 A604 NC Yes 102 127A-AS/1 AA504 ES SO3 TB 370" 1TE Electrical 211T4375 541 E35/E4 B106 NO No 542 E35/E4 SV4569A NO No 543 E35/E4 SV4570A NO No 544 E35/E4 SV4587A NO No 545 E35/E4 SV4587B NO No 103 127A-AS/2 AA504 ES SO3 TB 37 0" ITE Electrical 211T4375 546 E35/E4 B106 NO No 547 E35/E4 SVa569A NO No 548 E35/E4 SV4570A NO No 549 E35/E4 SV4587A NO No 9/18/96 Rev. EO Page: 20of 77

d )e aw o

o o o o o o o o o o o

o o

o o

o o

o o o o e

N NNN NN N N N NN N

N N

N N

N N

N NN N Mm O

69 E.

& v I

E f e

/S R e

Sc O OOOOO OOOOO O

O O

O O

O O

O OOO tta) w N N NN N N N NN N N N

N N

N N

N N

N NN N tco a N tnI oC A A s

8 0 8 A 8 B 0 A8 9 0 7

9 0 9 9 9 0 9 9 6 7 e

D t

p 5

6 5 5 5 5 6 5 5 5 5 4

4 4

4 4

4 4

4 6 5 5 a

8 6 7 8 8 6 7 8 8 t

4 0 4 4 4 4 0 4 4 4 4 0

0 0

0 0

0 0

0 0 4 4 V V V

2 VV V V 2 VVV V 5

5 5

5 6

6 6

6 1

w s

S B SS S S B S SSS A

A A

A A

A A

A BS S tce tno re c

b muN e

n 4

4 4 4 4 4 4 4 4 4 4 6

6 6

6 6

6 6

6 7 7 7 t

m E

E EEEE EEEEE E

E E

E E

E E

E EE E e

/

/

/

/

/ / /

h 5

5 5 5 5 5 5 5 5 5 5

/8 8

8 8

8 8

8 8 8 8 e

/

/ / / / /

/ / / / /

/

/

3 3 3 3 3 3 3 3 3 3 3 3

3 3

3 3

3 3

3 1

1 1

s E

E EEEE EEEEE E

E E

E E

E E

E EEE c

1 2

3 4

5 6

7 8

9 0 1

5 5 5 5 5 5 5 5 5 5 6 6

6 6

6 6

6 6

6 6 7 7 0

1 2 3 4 5 6 7 8 9 0 5

5 5 5 5 5 5 5 5 5 5 5

5 5

5 5

5 5

5 5 5 5 re b

mu 5

5 A

A A

A A

A A

A A

N 7

7 l

4 4

P P

P P

P P

P P

P 3

3 d

T T

2 2

2 2

2 2

2 2

2 e

1 1

1 1

1 1

1 1

1 1

0 0

0 0

0 0

0 0

0 1

M 2

2 7

7 7

7 7

7 7

7 7

o 1

1 r

la te er t

ic c

u n

r t

c t

c t

t t

t t

te t

t e

e e

e e

e t

le l

te te te ts s

s s

te ts c

t t

t t

s u

E E

s s

s o

o o

o o

o o

o o

n E

g g

g g

g g

g g

g M

TI T

A A

A A

A A

A A

A e

E I

no "0

0 0

"0 "0

"0 d

v 0

0 0

0 0

e 7

7 7

7 7

7 7

7 7

7 7

s E

2 2

3 3

3 3

2 2

2 2

3 e

l tca tn g

B B

B B

B B

B B

B B

C o

d C

B T

T T

T T

T T

T T

T T

l ya s

e a

3 3

1 t

1 1

1 1

1 1

1 i

l s

R B

O O

0 Q

O O

Q O

O O

O S

S S

S S

S S

S S

S S

l Q

a S

it S

S S

S S

S S

S S

S S

n M

s S

E E

E E

E E

E E

E E

E e

sE s

n e

o to it N

a tS r

4 4

4 4

4 4

4 4

4 4

4 e

e 0

0 0

0 0

0 0

0 0

0 0

wo n

6 6

5 5

5 5

6 6

6 6

5 l

P a

A A

A A

A A

A A

A A

A P

A A

A A

A A

A A

A A

A rae l

ll c

N 1

2 3

4 1

2 3

4 u

/

4

/4 4

4 4

4 4

/

4

/

/

/

/

/

/

1 7

w /

2 0

0 0

0 0

0 0

0 S

7 m

C 6

5 5

5 5

5 4

6 6

6 A

f 1

r X

X X

A A

X X

X X

X X

o f

J ir A

A A

A A

A A

A A

A 2

7 7

7 7

7 7

7 7

7 7

7 g

. A 2.

2 2

2 2

2 2

2 2

2 2

2 l

s i

1 1

1 1

1 1

1 1

1 1

p P

1 e

4 5

6 7

8 9

0 1

2 3

4 P

. 0 0

0 0

0 0

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 I

s 1

Contact States conteet store swerred Pilgrim Nuclear Power Station Essential Relay Contacts Meley 60 Panel Notes SAT SQ Bests Bldg Elevation Manutecturer ModelNumber schemette Number uns9ID INoe*C)

(YesNel 572 E18E7 SV4587A NO No s - a.o. = =

573 E1847 SV45878 NO No s m e.e.aw w.n 115 127AX-A5/2 AA504 ES SQt TB 3T 0" Agastat 7012PA 574 E18/E7 B106 NO No 575 E1BIE7 SV4569A NO No 576 E18/E7 SV4570A NO No 577 E18/E7 SV4587A NO No 578 E18/E7 SV4587B NO No 116 127AX-A6/1 AA604 ES SO1 TB 27 0" Agastat 7012PA 579 E18/E7 B206 NO No 580 E18E7 SV4569B NO No 581 EtSIE7 SV4570B NO No 582 E18/E7 SV4589A NO No 583 E18E7 SV4589B NO No 117 127AX-A6/2 AA604 ES SQ1 TB 27 0" Agastat 7012PA 584 E18/E7 B206 NO No 585 E18/E7 SV45698 NO No 586 E18/E7 SV4570B NO No 587 E18/E7 SV4589A NO No 588 E18/E7 SV4589B NO No 118 132-509 C101 ES OL2 DGA 27 0*

Wes6./m CRN-1 589 E40/E7 A509 NO No 119 132 6 C102 ES OL2 DGB 270" West 9M.ise CRN-1 590 E40/E7 A609 NO No i

120 13A-K1 C930 ES S01 RW 27 0" General Electric 12HFA151A2F 591 M1G27ES MO1301-49 NO No 592 M1G16-7E5 M01301-61 NO No 121 13A-K10 C930 ES SQ1 RW 270" General Electric 12HFA151A2F 593 M1G12-12E11 Mot 301-16 NO No 594 M1G12-12E11 M01301-17 NO No 595 M1G12-12E11 SV1301-1 NO No 122 13A-K11 C930 ES 501 RW 27 0" General Electric 12HFA151A2F 596 M1G14-9fE8 SV1301-1 NO No 9/f&96 Rev.E0 Pope: 22 of 77 l

e contset states Pilgrim Nuclear Power Station Essential Relay contacts Comroer Store enery# sed Money 80 Perset Notes SAT SQ Basis Bldg ElevetIort W ~.% turer Model Number senemette reummer Equip c prown (Yesway 123 13A-K13 C930 ES SQt RW 27 0" Generat Electric 12HGA11 A52F 597 M1G16-7/E5 M01301-60 NO No 124 13A-K14 C930 ES SQ1 RW 27 0" General Electric 12HGA11A52F 596 M1G12-12/E11 SV1301-1 NO No 125 13A-K17 C930 ES SO1 RW 270" Gews: Electric 12HGA11 A52F 599 M1G12-12E11 SV1301-1 NO No 126 13A-K18 C930 4

ES SQ1 RW 27 0" General Electnc 12HFA151A2F 600 M1G15-9E9 M01301-22 NO No 127 13A-K2 C930 ES SQ1 RW 270" Generat Electric 12HFA151A2F 601 M1G16-7/E5 M01301-60 NO No 128 13A-K22 C930 ES SQ1 RW 270" Generat Electric 12HFA151A2F 602 M1G15-9/E9 MO1301-16 NO No 603 M1G15-9/E9 MO1301-17 NO No 604 M1G12-12/E11 SV1301-1 NO No 129 13A-K3 C930 ES SQ1 RW 27 (T General Electric 12HGA11 A52F 605 M1G12-12/E11 M01301-16 NO No 606 M1G12-12/E11 M01M1-17 NO No 607 M1G12-12/Et t SV1301-1 NO No 130 13A-K31 C933 ES SQ1 RW 27 0" Generet Electric 12HGA11 A52F 608 M1G12-12/E11 MO1301-16 NO No 609 M1G12-12/E11 M01301-17 NO No 610 M1G12-12E11 SV1301-1 NO No 131 13A-K32 C933 ES SQ1 RW 270" CM Electric 12HGA11 A52F 611 M1G12-12/E11 M01301-16 NO No 612 M1G12-12E11 M01301-17 NO No 613 M1G12-12/E11 SV1301-1 NO No 132 13A-K33 C933 ES SQ1 RW 270" Agostet 7014PB 614 M1G12-12/E11 M01301-16 NO No 615 M1G12-12E11 M0130117 NO No 616 M1G12-12/E11 SV1301-1 NO No 133 13A-K34 C933 ES SQ1 RW 27 0" General Electric 12HFA151A2F 617 M1G15-9/E9 MO1301-16 NO No 618 M1G15-9/E9 M01301-17 NO No 9/fE16 Pope: 23 of 77 Rev EO

contact states conrect store an.+e Pilgrim Nuclear Power Station Essential Relay Contacts Recey DO Penet Notee SAT SQBasle Bldg Eleveders Mornskettsrer ModelMarber schemmer Number Equtp so gpONQ (YesNo) 134 13A-K5 C930 ES SQ1 RW 23'0" Generst Electric 12HGA11 A52F 619 M1G12-12!E11 MO1301-16 NO No 620 M1G1212/E11 MO1301-17 NO No 621 M1G12-12/E11 SV1301 1 NO No 135 13A-K7 C930 ES SQt RW 23'0" Agostet 7014PB T M1G12-12/E11 M01301-16 NO No P M1G12-12/E11 M01301-17 NO No tN M1G12-12411 SV1301 1 NO No 136 14A-K10A C932 ES SO1 RW 23* (T Gv = ;Ein. tit 12HFA151A2F 625 E18/E7 8106 NO No 626 E18/E7 SV4569A NO No 627 E18/E7 SV4570A NO No 628 E18/E7 SV4587A NO No 629 E18/E7 SV45878 NO No 630 E18/E8 VAC205A-1 NO No 631 E18/E8 VAC2058-1 NO No 632 E18/E8 VAC205C-1 NO No 833 E18/E8 VAC2050-1 NO No 634 E18/E8 VAC205E-1 NO No 635 E18/E8 VAC205F-1 NO No 636 E18/E8 VAC206A-1 NO No 837 E18/E8 VAC2068-1 NO No 137 14A-K108 C933 ES SOS RW 23'0" General EMt.t 12HFA151A2F 638 E18/E7 B206 NO No 639 E18/E7 SV4569B NO No 640 E18/E7 SV4570B NO No 641 E18/E7 SV4589A NO No 642 E18/E7 SV4589B NO No 643 E18/E8 VAC205A-2 NO No 644 E1&T8 VAC2058-2 NO No 645 E18/E8 VAC205C-2 NO No 646 E18/E8 VAC2050-2 NO No 647 E18/E8 VAC205E-2 NO No 648 E18/E8 VAC205F-2 NO No 649 E18/E8 VAC206A-2 NO No S/ft98 Rev. EO Pope: 24 of 77

aw Contact states comect sewe e,,erpri.e Pilgrim Nuclear Power Station Essential Relay Contacts Money DO Penel Notss SA T SQ Beste Bldg Elevation heenuf>cturer nfedetNumber schemenc Nuneer tw a pency greswey 650 E18/E8 VAC206B-2 NO No s.

,e.===

138 14A-K12A C932 ES SQ1 RW 27 0*

General Electric 12HFA151A2F 651 M1K7-7E3 P215A NO No 139 14A-K12B C933 ES SC1 RW 27 0" General Electnc 12HFA151 A2F 652 M1K7-7E3 P2158 NO No 140 14A-K13A C932 ES SQ1 RW 270" G-=.4 Electne 12HFA151A2F 653 M1K16/E6 M01400-25A NO No 101 14A-K138 C933 ES SQ1 RW 270" G-wd Electric 12HFA151A2F 654 MIK16/E6 MO1400-258 NO No 1C2 14A-K14A C932 4

ES SQ3 RW 27 F Agostet ETR1403A003 655 M1K4-11E15 P215A NO No 143 14A-K148 C933 4

ES SQ3 RW 27 0" A9estet ETR14D3A003 656 MIK4-11/E15 P2158 NO No 144 14A-K23A C932 ES SQt RW 27 (T G--ie Electnc 12HGA11 A52F 657 M1K411E15 SV203-3A NO No 658 M1K4-11/E15 SV203-38 NO No 659 M1K4-11/E15 SV203-3C NO No 660 M1K4-11/E15 SV203-30 NO No 145 14A-K238 C933 ES SQ1 RW 27 0" Gwed Electric 12HGA11 A52F 661 M1K4-11/E15 SV2O3-3A NO No 662 M1K4-11/E15 SV203-38 NO No l

663 M1K411/E15 SV203-3C NO No 664 M1K4-11/E15 SV203-3D NO No 146 14A-K50C C2233A ES SQ3 RW 270" A,- -

EGPB002 665 M1K411/E15 B106 NO No 666 M1K4-11/E15 8206 NO No

[

667 M1K4-11tE15 MO2301-14 NO No 666 M1K4-11tE15 M O230t-33 NO No 669 M1K4-11E15 MO2301-34 NO No 670 M1K4-11/E15 MO2301-8 NO No 671 M1K4-11tE15 SV4569A NO No 672 M1K4-11/E15 SV45698 NO No 673 M1K4-11/E15 SV4570A NO No 9/1696 Rev. EO Pope: 25 of 77

contect states Centeet store Enerpered Pilgrim Nuclear Power Station Essential Relay Contacts C.=, 80 Perset Notes SAT SO Basis Bldg Elevation Manufacturer AfodelNumber Schemede Number Equtp to tNooec) tt'eswe) 674 M1K4-11/E15 SV45708 NO No 675 M1K4-11/E15 SV4587A NO No 676 M1K4-11/E15 SV45678 NO No 677 M1K4-11E15 SV4589A NO No w w 678 M1K4-11E15 SV45898 NO No s-,,

679 M1K4-11E15 VAC205A-1 NO No s.

680 MIK&11/E15 VAC205A-2 NO No s,.,

681 M1K4-11E15 VAC2058-1 NO No s-,.,

682 M1K411/E15 VAC2058-2 NO No 683 M1K&11E15 VAC205C 1 NO No s_

684 M1K4-11E15 VAC205C-2 NO No s -,

685 M1K411E15 VAC205D-1 NO No s -,

686 M1K4-11/E15 VAC205D-2 NO No 687 M1K4-11E15 VAC205E-1 NO No 688 M1K+11E15 VAC205E 2 NO No s-,.,

689 M1K411E15 VAC205F-1 NO No s-,w, s.

690 M1K411/E15 VAC205F-2 NO No s - e w 691 M1K&11E15 VAC206A-1 NO No 692 M1K4-11E15 VAC206A-2 NO No s-,,

693 M1K4-11/E15 VAC2068-1 NO No sw 694 MIK4-11E15 VAC2068-2 NO No s.

e.

s.

- w.

147 14A-K500 C2233B ES SO3 RW 23' (T Agostet EGPB002 695 M1K4-11E15 B106 NO No 696 M1K&t1E15 B206 NO No 697 MIK411/E15 MO2301-14 NO No 698 M1K411/E15 MO2301-33 NO No 699 M1K411/E15 M O2301-34 NO No 700 M1K&11tE15 MO2301-8 NO No 701 MIK411E15 SV4569A NO No 702 M1K4-11/E15 SV45698 NO No 703 M1K411/E15 SV4570A NO No 704 M1K411/E15 SV45700 NO No 705 M1K411/E15 SV4567A NO No 706 M1K&11/E15 SV45678 NO No 707 M1K4-11/E15 SV4589A NO No 708 M1K4-11/E15 SV45898 NO No I

S/f&96 Rev.E0 Pete: 26 of 77

contact states Centeet State En,:M PHorim Nuclear Power Station Essential Relay Contacts Mosey 80 Pene!

Notes SAT SQBasis BMg Elevedon Menestecturer ModelNuneber schemenc Numser Equip o tNosen (Yeewey 709 M1K4-11/E15 VAC205A-1 f:0 No s-,w.*,*"**

710 M1K411/E15 VAC205A-2 NO No swww.*, a=*"

711 M1K4-11E15 VAC205B-1 NO No 5"***"*****'"***

712 M1K4-11/E15 VAC2058-2 NO No s

w.*, = -

713 M1K4-11E15 VAC205C-1 NO k

me. _

w.*,=.e.

714 M1K4-11Mi5 VAC205C-2 NO No s.

w.*,ane-715 M1K4-11/E10 VAC20*0-1 NO No s_

==*,="**

716 M1K4-11E15 VAC205D-2 NO No sa.

w w '*v *==**

717 M1K&11E15 VAC205E-1 NO No s e s ** * '*' *"**

718 M1K4-11/Et5 VAC205E-2 NO No

[

n=w.a.==='*'""**

719 M1K4-11/E15 VAC205F-1 NO No s=. -

720 M1K4-11/E15 VAC205F-2 NO No

s. - e=s.w.*, =*.

721 M1K4-11/E15 VAC206A-1 NO No s

w =, -

722 M1K411E15 VAC206A-2 NO No

  • ar**="w***'"***

723 M1K4-11E15 VAC2068-1 NO No s.

s.o. w.*, =**

724 M1K4-11E15 JAC2068-2 NO No s.

e=.*,=an-i 148 14A-K51 A C2233A ES SQ3 RW 27 0" Agostet EGPB002 725 Mt K4-11/E15 VAC205A-1 NO No 726 M1K411E15 VAC205A-2 NO No 727 M1K&t1/E15 VAC2058-1 NO No 728 M1K4-11/E15 VAC2058-2 NO No 7

)

729 M1K4-11E15 VAC205C-1 NO No 730 M1K4-11/E15 VAC205C-2 NO No i

731 M1K4-11/E15 VAC205D-1 NO No 732 M1K4-11E15 VAC2050-2 NO No f

733 M1K411E15 VAC205E-1 NO No l

734 M1K4-11/E15 VAC205E-2 NO No 735 M1 K4-11E15 VAC205F-1 NO No 736 M1K4-11/E15 VAC205F-2 NO No 737 M1K4-11/E15 VAC206A-1 NO No 738 M1K4-11E15 VAC206A-2 NO No 739 M1K411/E15 VAC2068-1 NO No 740 M1K+11/E15 VAC206B-2 NO No f

149 14A-K51B C22338 ES SO3 RW 27 U" Agostet EGPB002

)

741 M1K4-11/E15 VAC205A-1 NO No 9/f898 Rev. E0 Pope: 27 ot T7 b

.~. -

contact stores Centect Sante : -,=ed Pilgrim Nuclear Power Station Essential Relay Contacts Relay D Perset Notes SAT SQBasis BMg Elevatlors L fi-turer ModelNumber schemece Nurreer Equer D INOMQ (YesNel 742 M1K4-11/E15 VAC205A-2 NO No s-743 M1K4-11E15 VAC2058-1 NO No s o w.un 744 M1K4-11E15 VAC2058-2 NO No a_

w 745 M1K4-11/E15 VAC205C-1 NO No n -

o. a. m.,

746 M1K411tE15 VAC205C 2 NO No s-w 747 M1K411E15 VAC205D-1 NO No s -

ww 748 M1K411/E15 VAC2050-2 NO No s -

w==, =

749 M1K4-11tE15 VAC205E-1 NO ho n= - =

750 M1K411E15 VAC205E 2 NO No s

e.

751 M1K411/E15 VAC205F-1 NO No s= - s 752 M1K411/E15 V8 0 4 5F-2 NO No s - s w.=,.-==

753 MiC *s4:'"

VAC206A-1 NO No s_

.=,

754 M1K411/E15 VAC206A-2 NO No s=

s.

, =

755 M1K4-11/E15 VAC20681 NO No e.

. - =

756 M1K4-11/E15 VAC2068-2 NO No s.

e.

150 14A-K51C C2233A ES SQ3 RW 270" Agastat EGPB002 757 MIK4-11E15 B106 NO No 758 M1K4-11E15 B206 NO No 759 M1K4-11E15 M01301-49 NO No 760 M1K4-11/E15 MC1301-60 NO No 761 M1K4-11E15 M01301-61 NO No 762 M1K4-11E15 SV4569A NO No 763 M1K411E15 SV4569B NO No 764 M1K4-11/E15 SV4570A NO No 765 M1K4-11E15 SV45708 NO No 766 M1K4-11/E15 SV4587A NO No 767 M1K4-11/E15 SV4587B NO No 768 M1K4-11/E15 SV4589A NO No 769 MIK611/E15 SV45898 NO No 151 14A-K51D C2233B ES SQ3 RW 270" Agastat EGPB002 770 M1K4-11E15 B106 NO No 771 M1K411/E15 B206 NO No 772 M1K411/E15 M0130149 NO No 773 M1K4-11/E15 MO1301-60 NO No 774 M1K411E15 MO130141 NO No 9/1H Rev. EO Pete: 26 of TT

l contact stores conroer store enwr*

Pilgrim Nuclear Power Station Essential Relay Contacts

=; D Panet Notes sat sososts BMg Elevation nennut>chorer needet A>anber scomnene nun,sw em a conc) tYesm) 775 M1K411E15 SV4569A NO No s-

776 M1K41tE15 SV45699 NO No s.

, w.m 777 M1K411E15 SV4570A NO No 778 M1K411E15 SV45708 NO No 779 M1K411E15 SV4587A NO No s -

e.

780 M1K4-11E15 SV45878 NO No s.

w,..

781 M1K4-11E15 SV4589A NO No I

s a.assene.

,a===

782 M1K4-11E15 SV45898 NO No s.

e.

152 14A-K52A C2233A ES SO3 RW 27 (r Agostat EGPB002 783 M1K&11/E15 MO1400-25A NO No 784 M1K611/E15 MO1400-258 NO No 153 14A-K528 C22338 ES SQO RW 27 0-Agostat EGP9002 785 M1K4-11E15 M01400-25A NO No 786 M1K411E15 M01400-25B NO No 154 14A-K6A C932 4

ES SQ1 RW 27 0" General Electr6c 12HFA151A2F 787 M1K4-11/E15 B106 NO No i

788 M1K4-11/E15 8206 NO No 789 M1J16-10/E22 MO2301-14 NO No 790 M1J15-10/E16 MO2301-33 NO No 791 M1J15-10/E16 M O2301-34 NO No 792 M1J16-10/E22 MO2301-8 NO No 793 M1K411/E15 SV4569A NO No 794 MIK4-11E15 SV45690 NO No 795 M1K411E15 SV4570A NO No 796 M1K411/E15 SV45708 NO No 797 M1K611E15 SV4567A NO No 798 M1K4-11E15 SV45878 NO No 799 M1K4-11E15 SV4589A NO No 800 M1K4-11/E15 SV45898 NO No 801 M1K4-11E15 VAC205A-1 NO No f

802 M1K4-11E15 VAC205A-2 NO No 803 M1K4-11E15 VAC2058-1 NO No 804 M1K&t1/E15 VAC2058-2 NO No 805 M1K411E15 VAC205C-1 NO No l

806 M1K4-11/E15 VAC205C-2 NO No 9/f8L98 Rev. E0 7

Page: 29 of 77 i

contact States Pilgrien Nuclear Power Station Essential Relay Contacts contact state Enerytres Rotey DO Penet Notes SAT SQ Basis BMg Devotion Manu*ecturer ModelNumber schenenc Nunter EM D INOftQ (YesNej 807 M1K611E15 VAC2050-1 NO No s-808 M1K4-11E15 VAC2050-2 NO No

  • =a-

= = = = * * '

  • = * -

812 M1K411E15 VAC205F-2 NO No 813 M1K4-11E15 VAC206A-1 NO No s -

w =, a"**

814 M1K4-11E15 VAC206A-2 NO No 815 M1K4-11/Et5 VAC206B-1 NO No s.* -

816 M1K4-11E15 VAC2068-2 NO No s_

155 14A-K6B C933 4

ES SQ1 RW 23'O' Generel Electric 12HFA151A2F 817 M1K4-11E15 B106 NO No 818 M1K4-11E15 B206 NO No 819 M1J16-10fE22 MO2301-14 NO No 820 M1J18-10/E22 MO2301-33 NO No 821 M1J16-10E22 MO2301-34 NO No 822 M1J18-10E22 MO2301-8 NO No 823 M1K4-11E15 SV4569A NO No 824 M1K411E15 SV45698 NO No 825 M1K4-11E15 SV4570A NO No 826 M1K4-11/E15 SV4570B NO No 827 M1K4-11/E15 SV4587A NO No 828 M1K4-11E15 SV45878 NO No 829 M1K4-11E15 SV4589A NO No 830 M1K&11/E15 SV45898 NO No 831 M1K4-11E15 VAC205A 1 NO No 832 M1K4-11/E15 VAC205A-2 NO No 833 M1K&11E15 VAC2058-1 NO No 834 M1K4-11E15 VAC2058-2 NO No I

835 M1K611/E15 VAC205C 1 NO No 836 M1K4-11E15 VAC205C-2 NO No 837 M1K4-11E15 VAC2050-1 NO No 838 M1K&11/E15 VAC2050 2 NO No 839 M1K411/E15 VAC205E-1 NO No 840 M1K4-11E15 VAC205E-2 NO No 841 M1K4-11E15 VAC205F.1 NO No S/f896 Rev. E0 Page: 30 of TT

1 I

I contact States ceneect seme e-veren Pilgrim Nuclear Power Station tissential Relay Contacts Meky 9 Penel Notes SAT SQBasis Bldg Elevation Manufacturer Model Number schenenc Num6er Equip to Qwowq (Yeswe) 842 M1K4-11/E15 VAC205F-2 NO No a m noew ms=*e=

843 M1K41ti 15 VAC206A-1 NO No 844 M1K4-11/E15 VAC206A-2 NO No 845 M1K411E15 VAC2068-1 NO No 846 M1K4-11/E15 VAC2068-2 NO No

}

1's6 14A-K8A C932 4

ES S01 RW 27 (T Generst Electric 12HFA151A2F 847 M1K4-11E15 B106 NO No 848 M1K4-11E15 8206 NO No 849 M1G12-12E11 MO1301-49 NO No 850 M1G12-12E11 M01301-60 NO No 851 M1K4-11/E15 M01301-61 NO No 852 M1K4-11/E15 SV4569A NO No 853 M1K4-11/E15 SV45698 NO No 854 M1K4-11E15 SV4570A NO No 855 M1K4-11/E15 SV4570B NO No

{

{

856 M1K4-11/E15 SV4587A NO No 857 M1K4-11/E15 SV4587B NO No 1

858 M1K4-11/E15 SV4589A NO No 859 M1K411/E15 SV45898 NO No 860 M1K4-11/E15 VAC205A-1 NO No 861 M1K4-11/E15 VAC205A-2 NO No 862 M1K4-11/E15 VAC2058-1 NO No 863 M1K4-11/E15 VAC2058-2 NO No 864 M1K4-11/E15 VAC205C-1 NO No 865 M1K4-11E15 VAC205C-2 NO No 866 M1K4-11E15 VAC2050-1 NO No 867 M1K4-11/E15 VAC2050-2 NO No 868 M1K4-11/E15 VAC205E-1 NO No 869 M1K4-11/E15 VAC205E-2 NO No 870 M1K4-11/E15 VAC205F-1 NO No 871 M1K4-11/E15 VAC205F-2 NO No 872 M1K4-11/E15 VAC206A-1 NO No 873 M1K4-11/E15 VAC206A-2 NO No 874 M1K4-11/E15 VAC2068-1 NO No 875 M1K4-11/E15 VAC2068-2 NO No 9/1848 Rev. EO Page: 31of 77

conteet states Contact State :-@

Pilgrim Nuclear Power Station Essential Relay Contacts Retey DO Panet Notes SAT SQ Basis Bldg Elvrettorr L ~f cturer AfodelNtJmber Schemette Nurnber Equip DD gNONG (resNel 157 14A-K8B C933 4

ES SQt RW 27 0" General Electric 12HFA151A2F 876 M1K&t1E15 B106 NO No 877 M1K&11/E15 B206 NO No 878 M1G12-12E11 MO130149 NO No 879 M1G12-12E11 MO1301-60 NO No 880 M1K4-11tE15 MO1301-61 NO No 881 M1K4-11/E15 SV4569A NO No 882 M1K411E15 SV4569B NO No 883 M1K&t1E15 SV4570A NO No 884 M1K4-11E15 SV4570B NO No et5 M1K4-11E15 SV4587A NO No 886 M1K4-11E15 SV4587B NO No 887 M1K4-11E15 SV4589A NO No 888 M1K4-11E15 SV4589B NO No 889 M1K4-11tE15 VAC205A-1 NO No 890 M1K4-11/E15 VAC205A-2 NO No 891 M1 K4-11E15 VAC2058-1 NO No 892 M1K4-11E15 VAC205B-2 NO No 893 M1K4-11/E15 VAC205C-1 NO No 894 M1K411E15 VAC205C-2 NO No 895 M1K&t1E15 VAC2050-1 NO No 896 M1K411E15 VAC2050-2 NO No 897 M1K411/E15 VAC205E-1 NO No 898 MIK&11/E15 VAC205E-2 NO No 899 M1K4-11E15 VAC205F-1 NO No 900 M1K411E15 VAC205F-2 NO No 901 M1K411/E15 VAC206A-1 NO No 902 M1K&11/E15 VAC206A-2 NO No 903 M1K4-11/E15 VAC206B-1 NO No 904 M1K411/E15 VAC206B-2 NO No 158 14A-K9A C932 4

ES SQ1 RW 27 0" Gewd EWi,1c 12HFA151A2F 905 M1K16/E6 M01400-25A NO No 906 MIK16/E6 M01400-258 NO No 159 14A-K99 C933 4

ES SQ1 RW 23'0" Gei-M Electric 12HFA151A2F 907 M1K16/E6 M01400-25A NO No S/fa,98 Rev. EO Page: 32 of TT

d1ee o

o o o o o o o o o o o o o WM o N

N N N NN NN N N N N N N O

pe N W E.

r e

e nY v

g E

I e W R e

O O

OO OO OO OO OO OO ro)

N N

NN N N N N NN N N N N t

C O

S M N txO tN nt eC 852 s

e 0

0 S

ip 6

8 6

6 6

6 4 4 4 4 4 4 4 9 4 9 4 9 t

8 0

0 0

0 0

0 0

0 0 0 0 0 0 0 0 00 0 0 a

4 u 0 5

6 5

6 5

6 5 6 5 6 5 6 5 5 5 5 5 5 t

1 E M A

A A

A A

A AA AA AA AA AA A A q

tca tn o

r e

c b

muN 6

en E

1 1 1 1 1 1 m

E E

E E

E E

26 6 5 6 5 EE EE EE e

6 1

1 1

1 1

1 e

K 6

6 6

6 6

6 9 9 9 9 9 9 4 4 4 4 4 /

1

/

/

/

/

/

/

/

/

/ /

/ /

/ 4 1

3 3

3 3

3 3

1 1 1 1 1

1 3 3 3 3 3 3 s

M E

E E

E E

E EE EE EE EE EE EE hc 6

9 0

1 2

3 4

5 6 7 8 9 0 1 2 3 4 5 6 0

0 1

1 1

1 1

1 1

1 1 1

2 2 2 2 2 2 2 9

9 9

9 9

9 9

9 9 9 9 9 9 9 9 9 9 9 9 r

A A

A A

A e

1 1

2 2

2 A

1 1

1 2

b V

V m

A A

A A

A A

7 7

7 1

1 1

7 7

7 5

u 1

1 N

C C

C C

C C

A A

At 2

1 1

1 1

J J

8 8

8 l

1 1

1 1

t t

A e

P P

O O

O 2

2 2

t de O

O O

O 2

2 C

C C

1 1

1 1

n C

C C

C 1

1 e

r e

e e

e i

c n

r ic e

c c

i n

c r

n s

e e

t t

t t

+

s s

c c

c tc t

r e

u s

s s

r.

e.

m e

le e

le l

e s

s s

s c

c u

u u

l r

u u

u u

e le E

E E

E f

i g.

p.

g.

l E

g g

p.

la J

le la E

la t

fr.

c M-r se n

w e

e

=

r a

M e

e e

e r

n n

e r

u s

t i

t e

e n

s s

s s

n e

e W

W W

W G

G W

W W

G G

G G

e e

e e

e e

r ih sro v

0 "0

"0 "0

"0 0

"0 "0

"0 "0

"0 0

0 tt o

7 7

7 7

7 7

7 7

7 7

7 7

7 s

E 3

2 3

2 3

2 3

3 3

3 3

3 3

e l

tca tn g

W W

W B

B B

B o

h B

B B

B B

B C

B T

T T

T T

T R

R R

T T

T T

f y

t 1

1 t

t 1

2 2

2 2

2 2

3 e

a t

R B

Q 0

O Q

Q Q

L L

L L

L L

O l

s e

e S

S S

S S

S O

O O

O O

O S

l O

a S

it e

A S

S S

S S

S S

S S

S S

S S

n T

s S

E E

E E

E E

E E

E E

E E

E sE e

n e

o to it N

a tS re 4

1 1

1 w

e 6

6 6

6 6

6 0

0 0

0 l

P e 5

6 5

6 5

6 5

5 5

5 5

5 5

o n

0 0

0 0

0 0

P A

A A

A A

A C

C C

A A

A A

rae lcu 7

N 7

A 8

C A

=

f 1

1 1

4 o

A A

C C

n D

==

5 5

5 5

A 8

C 0

0 0

0 t

1 1

1 1

4 4

5 5

5 5

3 i

3 1

1

/

r N

N 4

f y

t

. 0

/

1 1

g e

. /

0 0

0 0

0 1

1 1

1 1

1 1

5 5

5 5

5 5

5 5

5 5

5 5

5

e l

1 1

1 1

1 1

1 1

1 1

1 1

1 i e g

P M a

1 2

3 4

5 6

7 6

9 0

1 2

P 6

6 6

6 6

6 6

6 6

6 7

7 7

0 s

1 1

1 1

1 1

1 1

1 1

1 1

1 l

contact states conrect sane ener9 tree Pilgrim Nuclear Power Station Essential Relay Contacts

, :!:yD Penet Notes SAT SQBests Bldg Elevation htantrfecturer 2,:;: Number serrerneoc Nurnber E@p 80

@*O**C)

(Yeome) 927 E3NE1 A504 NO No 928 E34E1 A509 NO No s,

=

173 151-504B A504 ES SO3 TB 37 0"

% w.: Electne 12 TAC 51A2A s.

e. w 929 E34E1 A504 NO No 930 E34E1 A509 NO No 174 151-504C A504 ES SQ3 TB 37 0" Gass: Electric 12 TAC 51A2A 931 E34/E1 A504 NO No 932 E34E1 A509 NO No 175 151-505A A505 ES SO3 T8 370" Gewst Electric 12 TAC 51A2A 933 E3*Et A504 NO No 934 E3NE1 A509 NO No 176 151-5059 A505 ES SQ3 TB 37 U"

%+s: Electric 12 TAC 51 A2A 935 E3NE1 A504 NO No 936 E34E1 A509 NO No 177 151-505C A505 ES SO3 TB 370" General Electric 12 TAC 51A2A 937 E3NE1 A504 NO No 938 E3*El A509 NO No 178 151-601 A A601 ES OL2 78 27 0" General Electnc 12 TAC 77A12A 939 E34E1 A604 NO No 940 E3NE1 A609 NO No 179 151-601B A601 ES OL2 TB 27 0" General Electric 121AC77A12A 941 E34E1 A604 NO No 942 E3*El A609 NO Na 180 151-601C A601 ES OL2 TB 27 0" Gewe: Electric 12 TAC 77A12A 943 E34E1 A604 NO No 944 E3*E1 A609 NO No 181 151-804A A604 ES SQ3 TB 27 0" General Electric 12iAC51A2A 945 E34E1 A604 NO No 946 E3*E1 A609 NO No 182 151-604B A604 ES SQ3 TB 270" Generet EWi 12!AC51A2A 947 E34E1 A604 NO No 948 E3*Et A609 NO No 183 151-604C A604 ES SQ3 TB 27 0" Gwes: Electric 12 TAC 51A2A 9/f&96 g,,, go Pege: 34 of 77

contact states cearece srae e,,weried Pilgrim Nuclear Power Station Essentist Relay Contacts Moky D Panel Notee SAT SQBeels Bldg Elevedon Manutecturer ModelNumber schemenc Num6er Ens 4 o tmwC)

(Yeswe) 949 E3*Et A604 NO No 950 E3*Et A609 NO No s.

so.

=.w 164 151-605A A605 ES SQ3 T8 270" General Electre 121AC51 A2A 951 E3*E1 A604 NO No 952 E3*Et A609 NO No 185 151405B A605 ES SQ3 TB 27 0" General Electne 12 TAC 51A2A 953 E3*E1 A604 NO No 954 E3*Et A609 NO No 186 151-805C A605 ES SQ3 TB 2J o*

General Electric 12 TAC 51A2A 955 E3*Et A604 NO No 956 E3*E1 A609 NO No 187 151N-501 A501 ES SQt TB 37(T G

e Electnc 12 TAC 53A3A 957 E3*E1 A504 NO No 956 E34/E1 A509 NO No 186 151N-504 A504 ES SQt TB 37 0" General Electric 12 TAC 53A3A 959 E3NE1 A504 NO No 960 E3*E1 A509 NO No 189 151N-505 A505 ES SO1 TB 37 0" Generet Electric 121AC53A3A 961 E3*E1 A504 NO No 962 E3*El A509 NO No 190 151N401 A601 ES SQt TB 27 (T General Electric 12 TAC 53A3A 963 E3*Et A604 NO No 964 E3*E1 A609 NO No 191 151N404 A604 ES SQf TB 27 U" Geneal Electric 12 TAC 53A3A 965 E3*Et A604 NO No 966 E3*Et A609 NO No 192 151N405 A605 ES SQt TB 27 0" Generel Electric 12 TAC 53A3A 967 E3*Et A604 NO No 968 E3*El A609 NO No 193 151VISO9A A509 ES 503 TB 37 0" General Electric 12iJCVS2A9A 969 E5128-5BC/E2 A509 NO Yes 970 E5-128-5BCIE2 X107A-ER NO Yes 194 151Vl5098 A509 ES SO3 TB 37 0" G

GElectric 12WCVS2A9A Ffs/ps Rev.EO Page: 35 et 77

=.

b contact states Contact Sante Energeted Pilgrim Nuclear Power Station Essential Relay Contacts ReGey D Panel Notes SAT SQBeels BMg Elevadon Manutecturer ModelNumber Schem*0c Number Equep 20 0*ONC1 (Yeone) 971 E5-128-5BCE2 A509 NO Yes 972 E5-128-5BCE2 X107A-ER NO Yes s_

,.=e.

195 151V/509C A509 ES SQ3 TB 37 0" Generet Electnc 12WCV52A9A 973 ES-126-5BCE2 A509 NO Yes 974 ES-126-5BC/E2 X107A-ER NO Yes 196 151V/609A A609 ES SQ3 TB 270" General Electric 12VCV52A9A 975 E3352 A609 NO Yes 976 E33/E2 X1078-ER NO Yes 197 151 Vie 09B A609 ES SO3 TB 27 0" General Electric 121JCV52A9A 977 E33/E2 A609 NO Yes 978 E33/E2 X1078-ER NO Yes 196 151Vt009C A609 ES SO3 TB 27 0" G.,

d Electrte 12VCV52A9A 979 E33E2 A609 NO Yes 980 E33/E2 X107B-ER NO Yes

$99 152Y A501 21 ES OL2 TB 37 0" Geme Electne AM416-250-8H 961 E28 SH.1E8 A501 t

0 200 152Y A502 21 ES OL2 TB 37 0" General Electric AM 416-2504H 1

962 E26 SH.1E8 A502 201 152Y A504 21 ES OL2 TB 37 0" G-+-

Electric AM-416-250-8H 983 E28 SH 1/EB A504 202 152Y A505 21 ES OL2 TB 3T r Gwe Electric AM-4.16-250L8H 964 E26 SH.1E8 A505 203 152Y A500 21 ES OL2 TB 37 r General Electric AM-416-250L8H 965 ES-127-6BC/1 A509 s

204 152Y A601 21 ES OL2 TB 27 0" Generet Electric AMA 16-2504H 966 E28 SH.1E8 A601 i

205 152Y A802 21 ES OL2 TB 27 0-General Electric AM 4.16-2504H 967 E28 SH 1E8 A602 206 152Y A604 21 ES OL2 TB 270" G-+ e: Electric AM-416-250-8H 988 E28 SH.1E8 A604 207 152Y A605 21 ES OL2 TB 270" General Electric AM-416-250-8H 969 E28 SH 1ES A605 9/f8/96 Rev.E0 Page: 36 of TT

Corttact States Centset State Enwatred Pilgrim Nuclear Power Station Essential Relay Contacts

=;JO Panel Notes SAT SQ Bank Bldg ElevaUon Manufacturer ModelNumber schemenc Number Equip 20

@ONC)

(Yeento) 206 152Y A609 21 ES OL2 TB 270" General Electnc AM-416-2504H 990 E28 SH 1/E8 A609 209 159-509/1 C101 ES OL2 DGA 27 0" Generaf Electric SV 991 E40/E7 A509 NO No 210 159-509/2 C101 ES OL2 DG A 27(T Ga.wral Electric SV 992 E40/E7 A509 NO No 211 15&e0W1 C102 ES OL2 DG B 270" General Electric SV 993 E40/E7 A609 NO No 212 159-609/2 C102 ES OL2 DG B 27 0" General Electric SV s94 E40/E7 A609 NO No 273 162-501 A501 ES S01 TB 37 0-Agostat 2412PCL 995 E39/E2 ASC1 NO No 214 162-509 A509 ES SQ3 TB 37(r Agastat DSCXXO12XSPAXAA 996 E40/E7 A509 NO No 215 162-601 A501 ES SO3 TB 27 0" Agastat DSCXXO12XSPAXAA 997 E39rE2 A601 NO No 216 162-609 A609 ES SQ3 TB 27 0" Agastet DSCXXO12XSPAXAA 996 E40/E7 A609 NO No 217 16A-K10 C942 4

ES SQt RW 37 0" General Electric CR120A 999 M1N374E11 SV203-2A-AC NO No 1000 M1N374E11 SV203-2A-DC NO No 1001 M1N374/E11 SV203-2B-AC NO No 1002 M1N37-6/E11 SV203-28-DC NO No 1003 M1N37-6/E11 SV203-2C-AC NO No 1004 M1N37-6/E11 SV203-2C-DC NO No 1005 M1N37-6/E11 SV203-2D-AC NO No 1006 MIN 37-6/E11 SV203-20-DC NO No 218 16A-K13 C941 ES SQ1 RW 37 0*

General Electne 12HFA151A2H 1007 MIN 36-7/E11 SV203-1 A-DC NO Yes 1006 M1N36-7/E11 SV203-18-DC NO Yes 1009 M1N36 7/E11 Sv203-1C-DC NO Yes 1010 M1N36-7/E11 SV203-10-DC NO Yes 219 16A-K14 C941 ES SO1 RW 37 0" G m,e: Electnc 12HFA151A2H 9/ft96 Rev. E0 Pope: 31of 77

I contact states Centeet Stete Enerpesed Pilgrim Nuclear Power Station Essential Relay Contacts schemenc Number Equrp o pocmq (resone)

ReGeyID Penet Notes SAT SQ Beels Bldg Elevation Atenutecturer niodel;;...r 1011 M1N36-7E11 SV203-1A-AC NO Yes 1012 M1N36-7tEtt SV203-tB AC NO Yes s_

1013 M1N36-7/E11 SV203-1C-AC NO Yes s-,.,

1014 M1N36-7/E11 SV203-1D-AC NO Yes s,

220 16A-M1S C942 ES SQ1 RW 37 0" General Electne 12HFA151A2H

,u 1015 MIN 37 6/E11 SV203-2A-DC NO Yes 1016 M1N374E11 SV203-2B-DC NO Yes 1017 M1N37-6/E11 SV203-2C-DC NO Yes 1018 M1N37-6/E11 Sv203-2D-DC NO Yes 231 16A-K16 C942 ES SQt RW 370" Ge, erd Electric 12HFA151A9H 1019 M1N37-6/E11 SV203-2A-AC NO Yes 1020 M1N37-6/E11 Sv203-28-AC NO Yes 1021 M1N37-6/E11 SV203-2C-AC NO Yes 1022 M1N374E11 SV203-20-AC NO Yes 222 16A-K51 C941 ES SQt RW 37 0" General Electric 12HFA151A2H 1023 M1N36-7E11 SV203-1A-DC NO Yes 1024 M1N36-7/E11 SV203-18-DC NO Yes 1025 M1N36-7tE11 SV203-1C-DC NO Yes 1026 M1N36-7E11 SV203-1D-DC NO Yes 223 16A-K52 C942 ES SQt RW 37 U*

Gewe Electric 12HFA151A2H 1027 M1N37-6/E11 SV203 2A-DC NO Yes 1028 M1N374E11 SV203-28-DC NO Yes 1029 M1N374E11 SV203-2C-DC NO Yes 1030 M1N374E11 SV203-2D-DC NO Yes 224 16A-K9 C941 4

ES SQt RW 370" General Electric CRf 20A 1031 M1N36-7E11 SV203-1 A4C NO No 1032 M1N36-7E11 SV203-1 A-DC NO No 1033 M1N36-7E11 SV203-1B-AC NO No 1034 M1N36-7E11 SV203-1B-DC NO No 1035 M1N36-7E11 SV203-1C-AC NO No 1036 M1N36-7E11 SV203-1C-DC NO No 1037 MIN 36-7E11 SV203-1D-AC NO No 1038 M1N36-7E11 SV203-1 D-DC NO No 225 186-4 CS ES SQ1 RW 37 0" G-wi4 Electric HEA-61 9/1A90 Rev.E0 Pete: 38 of 77

contact states Centact State E -,Jed Pilgrim Nuclear Power Station Essential Relay Contacts Recey 8D Penel Notee SAT SQ Beels 8tdg Elevanon Memdecturer ModelNumber schemecc Number Equip 40 (NO**C)

LYeeMe) 1039 E38/E6 A504 NO/NC No s;

=,.

1040 E38/E6 A604 NO/NC No s_

, = =

226 186-509 A509 ES SQ1 TB 37 0" G== M Electnc 12HEA61A223 1041 E40/E7 A509 NO!NC No 1042 M6-46-6 SH.1/E4 X107A-ER NO/NC No 227 186-809 A809 ES SQt TB 270" G-e-d Electric 12HEA61A223 1043 E40/E7 A609 NOINC No i

1044 M6-46-6 SH 2/E4 X1078-ER NO/NC No 228 186-A5 A504 ES SO1 TB 37 7 General Electnc 12HEA618235 1045 E38/E6 A504 NO/NC No 1046 E40/E7 A509 NC No 229 186-A6 A804 ES SQt TB 27 0" G.,wi4 Electric 12HEA618236 1047 E38/E6 A604 NOINC No 1048 E40/E7 A609 NC No 230 187-4A CS ES OL2 RW 37 0" W na g ~ase HU-1 1049 E19/6 A504 NO No 1050 E194 A604 NO No 231 187-48 C5 ES OL2 RW 3T 0" Wei./we HU-1 1051 E194 A504 NO No 1052 E194 A604 NO No 232 187-4C C5 ES OL2 RW 37 0" W,4L g mose HU-1 1053 E19/6 A504 NO No 1054 E194 A604 NO No 233 187-509 A509 ES OL2 TB 37 0" West.gm SA-1 1055 E5-128-5BC/E2 A509 NO Yes 1056 ES-126-5BC/E2 X107A-ER NO Yes 234 187-809 A609 ES OL2 TB 270" Wa-g~ase SA-1 1057 E33/E2 A609 NO Yes 1058 E33/E2 X1078-ER NO Yes 235 187N 4 C5 ES OL2 RW 370" W W. g muse CWC 1059 E194 A504 NO No 1060 E194 A604 NO No 236 IV D32 ES OL2 TB 37 0" Automehe Swach Co 214A120 Sns/96 Rev.E0 Pope. 29 of 77

.m__

i Corstect States Pilgrim Nuclear Power Station Essential Relay Contacts Contest state Energsted Meiey DO Panet Notes SAT SQ Basis Bldg Devanon hianufacturer AtodelNumber schemeee Number Eque o tuoeeq tYeeMe) r 1061 ES34/E1 D32 NO Yes 1062 E534'E1 D33 NO Yes s~

=,

237 IV Y10 ES OL2 RW 27 0" Automate Switch Co 214B120 1063 E45A4-5/E1 Y10 NC Yes l

236 SV Y11 ES OL2 TB 270" Aut.c.;c Switch Co 214869 1064 E163-1-3 Y11 NC Yes 239 TV Y12 ES OL2 RW 270" Automate Switch Co 214A69 1065 E168-2-3 Y12 NC Yes 240 23A-K1 C939 ES SQt RW 27 0" General Electric 12HFA151A2F 1066 M1J19-9/E11 M O2301-8 NO No 241 23A-K14 C939 ES SO1 RW 27 7 Genera 4 Electric 12HFA151A2F 1067 M1J18-11/E14 SV2300-9 NO No 242 23A-K17 C939 ES SO1 RW 270" General Electric 12HGA11A52F 1068 M1J16-10'E22 SV2300-9 NO No 243 23A-K2 C939 ES SQt RW 27 0" General Electric 12HFA151A2F 1069 M1J32/E4 MO2301-14 NO No 244 23A-K20 C939 ES SQ1 RW 27 0" General Electric 12HGA11 A52F 1070 M1J16-10/E22 SV2300-9 NO No 245 23A-K21 C939 ES SOS RW 270" General Electric 12HFA151A2F 1071 M1J19-9/E11 MO23014 NO No 246 23A-K22 C939 ES SO1 RW 27 7 General Electric 12HFA151A2F 1072 M1J19-9/E11 MO2301-6 NO No 247 23A-K27 C939 ES S01 RW 27 F G- ; Electric 12HFA151A2F 1073 M1J16-1GE22 CV9068B NO No 1074 M1J20-5/E10 MO2301-35 NO No 1075 M1J20-5/E10 MO2301-36 NO No 1076 M1J19-9/E11 MO2301-4 NO No 1077 M1J19-9/E11 MO2301-5 NO No 1078 M1J16-10/E22 '

SV2300-9 NO No 248 23A-K28 C939 ES SQ1 RW 27 0" General EEifs 12HFA151A2F 1079 M1J16-10/E22 SV2300 9 NO No 249 23A-K3 C939 ES SQ1 RW 23' T Generet Electric 12HFA151A2F Srf&96 p,v,,

Page: 40 of 77

~

contact states Connect state E:

,A PHgrim NucI=ar Power Station Essendel Relay Contacts MoneyD Penet Notes SAT SOBeele BMg Elevet9ers M emotetturer ModelNumber schemene Num6er Equtp e twowc; (veswe) 1060 M1J19-9/E11 M O2301-6 NO No s

e..=

250 23A-K34 C941 ES SO1 RW 27 0" Generat Etectre CR120A 1061 M1J15-10/E16 CV9066A NO No 1062 M1J16-10/E22 CV90688 NO No 1063 M1J16-10/E22 M O2301-35 NO No 1064 M1J16-10/E22 M O2301-36 NO No 1065 M1J16-10/E22 M O2301-4 NO No 1066 M1J16-10/E22 MO2301-5 NO No 1067 M1J16-10rE22 SV2300-9 NO No 251 23A-K35 C941 ES SO1 RW 270" General Electric CR120A 1066 M1J15-10/E16 CV9066A NO No 1069 M1J16-10/E22 CV90688 NO No 1090 M1J16-10/E22 MO230135 NO No 1091 M1J16-10/E22 M O2301-36 NO No 1092 M1J16-10/E22 MO2301-4 NO No 1093 M1J16-10/E22 MO2301-5 NO No 1094 M1J16-10/E22 SV2300-9 NO No 252 23A-K36 C941 ES SQ1 RW_

27 0" Agostet 7014PB 1095 M1J15-10/E16 CV9066A NO No 1096 M1J15-10/E22 CV90688 NO No 1097 M1J16-10C2

"' 3 1-35 NO No 1096 M1J16-10/E22 -

MO2301-36 NO No 1099 M1J16-10/E22 M O2301-4 NO No 1100 M1J16-10/E22 M O2301-5 NO No

[

1101 M1J16-10/E22 SV23049 NO No i

253 23A-K37 C941 ES SQ1 RW 27 0" hi e Electric CR120A 1102 M1J15-10/E16 CV9066A NO No 1103 M1J19-9/E11 M O2301-4 NO No 1104 M1J19-9/E11 MO2301-5 NO No 254 23A-K36 C941 ES SQ1 RW 37 0" As4 Electric CR120A 1105 M1J16-10/E22 SV2300-9 NO No 255 23A-K4 C939 ES SQt RW 270" General Electnc 12HFA151A2F 1106 M1J32/E4 MO2301-14 NO No 256 23A-K42 C939 ES SO1 RW 27 0" G e2 Electric 12HGA11 A52F 9/ft98 Rev EO Peee: 41 of 7i

contact states coneser same Enseytree Pilgrim Nuclear Power Station Essential Relay Contacts Reneyno rener nones sar sQ Besen BMg Ebevedon Menutecturer Modet Nurn6er scheneec Num6er E% no INoenc)

(Yemede) 1107 M1J217/E11 SV2301-64 NC Yes

[

s, mes e-.=r ase-257 23A-K5 C939 ES SQt RW 270" Geiws: Electric 12HFA151A2F I

1108 M1J16-10/E22 SV2300 9 NO No 256 23A-K50A C2233*

ES S03 RW 27 0" Agostet EGPB002 1109 M1J16-10/E22 SV2300-9 NO No 259 23A-K51A C2233A ES SQ3 RW 27 0" Agostet EGPB002 1110 M1J15-10fE16 CV9068A NO No 1111 M1J15-10/E16 CV90686 NO No 1112 M1J15-10/E16 MO2301-35 NO No 1113 M1J15-10/E16 MO2301-36 NO No 1114 M1J15-10/E16 MO2301-4 NO No 1115 M1J15-10/E16 MO2301-5 NO No 1116 M1J15-10/E16 SV2300-9 NO No 260 23A-K518 C2233B ES SO3 RW 270" Agostet EGP9002 1117 M1J16-10/E22 CV9068A NO No 1118 M1J16-10/E22 CV90688 NO No 1119 M1J16-10/E22 MO2301-35 NO No 1120 M1J16-10/E22 MO2301-36 NO No 1121 M1J16-10/E22 M O2301-4 NO No 1122 M1J16-10/E22 M O2301-5 NO No 1123 MtJ16-10/E22 SV2300-9 NO No l

261 23A-K52A C941 ES SO3 RW 27 0" Agostat EGPD002 1124 M1J15-10/E16 CV9068A NO No 1125 M1J16-10E22 CV9C668 NO No 1126 M1J16-10T22 M O2301-35 NO No 1127 M1J16-10C22 MO2301-36 NO No 1128 M1J16-10E22 M O2301-4 NO No 1129 M1J16-10E22 MO2301-5 NO No 1130 M1J16-10'E22 SV2300-9 NO No 262 23A-K529 C939 ES SO3 RW 27 0" Agostet EGPD002 1131 M1J15-10E16 CV9068A NO No 1132 M1J16-10'E22 CV90688 NO No 1133 M1J16-10E22 MO2301-35 NO No 1134 MtJ16-10E22 MO2301-36 NO No 9/f0/98 Page: 42 of 77 Rev.E0

contact states conrect store Ene,ytrear Pilgrim Nuclear Power Station Essential Relay contacts

.~=y JO Pard Notes SAT SQ Bests Bldg Eleveders Marsutecturer ModelNumber schemette Number tw no tNowcp tvenme) 1135 M1J16-10/E22 MO23014 NO No s -

ww 1136 M1J16-10/E22 M O2301-5 NO No 1137 M1J16-10/E22 SV2300-9 NO No s.

www s.

=,w 263 23A-K53A C941 4

ES SO3 RW 37 0" Agastat EGPD002 1138 M1J15-10/E16 MO2301-33 NO No 1139 M1J15-10/E16 M O2301-34 NO No 264 23A-K53B C939 4

ES SQ3 RW 27 0" Agastat EGPD002 1140 M1J1610/E22 MO230133 NO No 1141 M1J16-10/E22 M O2301-34 NO No 265 23A-K54A C941 ES SQ3 RW 37 0" Agastat EGPD002 1142 M1J-33/E1 M O2301-33 NO No 1143 M1J-33/E1 M O2301-34 NO No 266 23A-K548 C939 ES SQ3 RW 23'0" Agastat EGPD002 1144 M1J-33/E1 MO2301-33 NO No 1145 M1J-33/E1 MO2301-34 NO No 267 23A-K6 C939 ES SO1 RW 27 0" Ge+-g Elecinc 12HGA11 A52F 1146 M1J15-10/E16 CV9068A NO No 1147 M1J16-10/E22 CV90688 NO No 1148 M1J16-10/E22 M O2301-35 NO No 1149 M1J16-10/E22 M O2301-36 NO No 1150 M1J16-10/E22 MO2301-4 NO No 1151 M1J16-10/E22 MO2301-5 NO No 1152 M1J16-10/E22 SV2300-9 NO No 268 23A-K8 C939 ES SQ1 RW 270" G-w.: Electric 12HGA11 A52F 1153 M1J15-10/E16 CV9068A NO No 1154 M1J16-10/E22 CV90688 NO No 1155 M1J16-10/E22 MO2301-35 NO No 1156 M1J16-10/E22 MO2301-36 NO No 1157 M1J16-10/E22 MO2301-4 NO No 1158 M1J16-10/E22 MO2301-5 NO No 1159 M1J16-10/E22 SV2300-9 NO No 269 23A-K9 C939 ES SO1 RW 27 0" Agostat 7014PB 1160 M1J15-10/E16 CV9068A NO No 1161 M1J16-10/E22 C'/90688 NO No 9/f&96 Rev. E0 Page: 43 ofIT

6 contact States Cenenet state Energred P)lgrim Nuclear Power Station Essential Relay Contacts Meeny RD Perret Noree SAT SQ Basis BMg Elevation Menerfecturer mom Nunsber sctmmenc Num6er Eq ap no tNoeect LYeomel 1162 M1Jt6-10/E22 M O2301-35 NO No 1163 M1J16-10/E22 MO2301-36 NO No 1164 M1J16-10/E22 MO23014 NO No f

1165 M1J1610/E22 M O2301-5 NO No s-.-

1166 M1J16-10/E22 SV2300-9 NO No s.

=

270 27-B1x B6 ES OL3 RW 27 0" Go+ e: Electric 12HFA51A42H s=-

8601 NO/NC No

_1167 E46/E4 1168 E46/E4 B602 NO No 271 27-B1Y B1 ES SQt TB 3T 0" General Electric 12HFA51A42H 1169 E172/E3 M O3808 NO No 2P2 27-81Z B1 ES OL3 TB 37 0" Generet Electnc 12HFA51 A42H 1170 EdvE4 8102 NO/NC No 1171 E4 44 8202 NO No 1t72 E4A1 MO3808 NO No 273 27-82X1 B6 ES SQt RW 27 0" Generet Electric 12HFA51A42H 1173 E46/E4 8601 NO No NO No 1174 E46/E4 8602 274 27-82X2 B6 ES OL3 RW 27 0" Geriorst Electric 12HFA51A42H 1175 E46/E4 B601 NO No l

1176 E46/E4 B602 NO/NC No 275 27-52Y B2 ES SQt TB 27 0" General Electric 12HFA51A42H 1177 E172/E3 M O38I3 NO No i

276 27-82Z1 B2 ES SO1 TB 27 0" Agostet 2412PB 1178 E46/E4 B102 NO No 1179 E46/E4 B202 NO No l

1180 E46/E4 MO3813 NO No 277 27-82Z2 B2 ES OL2 TB 27 0" Geee: Electnc 12HFA65062H.

1181 E46/E4 B102 NO No 1182 E46/E4 8202 NO/NC No 1183 E45/11 MO3613 NO No 278 2AX Y10 ES SQt RW 27 0" Agostet 2412PE No 1184 E45A-6-5/E1 Y10 NC 279 2E-K12A C932 4

ES SQt RW 27 (T Generet Electric 12HGA11 A52F 9/ft9s Mov. EO P000: de of 77 o.

m.

e contact states Contact State E:-ered Pilgrim Nuclear Power Station Essential Relay Contacts noney a rener notes SAT sosente steg novenon manutnesurer modernumber sesemene numeer we twoeoch (Yeswei 1185 M1R410/E19 SV2O3-3A NO No s.

=,

1186 M1R4-10/E19 SV203-38 NO No 1187 M1R4-10/E19 SV203-3C NO No s.

w

.=

No 1188 M1R4-10/E19 SV203-30 NO e_

,=

e.

200 2E-K128 C932 4

ES SQt RW 27 0" Generef EE.c 12HGA11 A52F 1189 M1R410/E19 SV203-3A NO No 1190 MIR4-10/E19 SV203-38 NO No 1191 MIR410/E19 SV203-3C NO No 1192 M1R4-10/E19 SV203-30 NO No 281 2E-K13A C932 ES SOS RW 27 0*

General Electnc 12HFA151A2F 1193 M1R410/E19 SV203-3A NC Yes 282 2E-K138 C932 ES SO1 RW 270" General Electric 12HFA151A2F 1194 MIR4-10/E19 SV203-38 NC Yes 283 2E-M13C C932 ES SQt RW 27 0-General Electnc 12HFA151A2F Yes 1195 MIR4-10/E19 SV203 3C _. NC 284 2E-M130 C932 ES SO1 RW 27 F General Electre 12HFA151A2F 1196 M1R4-10/E19 SV203-30 NC Yes 28" 2E-K7A C932 4

ES SQ1 RW 27 0*

General Electre 12HFA151A2F 1197 MIR8-2/E8 SV203-3A NO No 1198 MIR8-2/E8 Sv203-38 NO No 1199 MIR8-2iE8 SV2O3-3C NO No 1200 MIR8-2/E8 SV203-30 NO No 288 2E-K'8 C932 4

ES SOS RW 27 0*

General Electric 12HFA151A2F 1201 M1RS-2/E8 SV2O3-3A NO No 1202 MIRS-2/E8 SV203-38 NO No 1203 M1RS-2/E8 Sv203-3C NO No 1204 M1R8-2/E8 SV203-30 NO No 287 3A Y11 ES OL1 TB 27 0-Cramer Tener To8eDeteraned 1205 E168-1-3 Y11 NC No 288 3A-K32-XX XX C928 11 ES OL2 RW 37 r General Electric CR120K 1208 M1V19-4/2 FCV302-120 NO No 1207 M*V19-4/7 FCV302123 NO No 1208 M1V19 Ar2 SV305-121 NO No 9/18/98 pp,, gg Page: SS of 77 l

I o

o o.

o o

o o

o N

N N _.

,lee N

N N

N N

O o, N No M

s E

e e

v eY n

1 o

E(

V M e

O O

O r

s4 O

O O

O O

O N

N N

oQ t

N N

N N

N 6 N ec C e

v rag i

e 3

c 3

4 6

5 1

2 3

0 0

0 A

8 C

s 2

0 0

0 E

E F_

0 E-8 0

3 1

2 2

2 e

0 C

3 1

2 2

2 2

2 6

6.

3 3

2 0

0 0

t 8

5 0

0 0

0 0

0 0

O O

O 2

2 2

a t

p 0

8-2 0

O 2

2 2

2 2

2 2

E S

P M

P P

P P

P P

P M

M M

P P

P n

3 s

p V

2 t

tca tn r

o e

7 7

7 c

b m

7 7

7 7

7 E

E E

/

/

u E

E E

E E

/

1 1

/

/

/

/

/

1 1

N 1

2 2

2 2

1 E

H H

H E

H H

H H

H 8

8 2

2

/

S S

S 2

3 n /

8

/

S S

S S

S E

E 7

E 3

6 6

6 4

/

0 11

/1 3

/

J 7

7 7

9 E

3

/

6 6

6 6

6 0

1 0

J 7

7 7

7 7

7 7

7 7

1 1

1 1

- V 7

1 1

1 1

1 1

1 1

S M

E M

E E

E E

E E

E E

E M

E E

E 1

1 G

1 1

9 0

1 2

3 4

5 6

7 6

9 0

1 2

3 4

1 1

1 1

1 1

1 1

1 2

2 2

2 2

2 2

2 2

2 2

2 2

2 2

2 2

2 2

2 2

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

0 1

b C

C C

C C

C C

C C

C C

C C

r m

X A

A A

A A

A A

A A

A A

A A

e u

C C

C C

C C

C C

C C

C C

C C

4 B

4 A

4 4

4 1

1 1

4 4

4 4

0 M

M M

_M M

M M

M M

M N

4 1

_0 0

0 0

0 0

0 M

M M

0 M

0 0

0 0

0 0

0 2

0 0

0 2

0 l

1 0

0 0

0 2

2 2

2 2

2 2

0 0

0 e

1 A

A A

A A

A A

d 0

0 0

R 2

R 2

2 2

M A

A A

C A

C A

A A

o 2

2 2

e c

n n

e e

n e

e e

e e

t s

s s

m r

e e

e r

e t

s e

e a

e e

-~.

e.

u u

t m

c u

u e

s s

s c

r u

u u

le u

l h

g 4

g g-g 4

o e

s o

r, h

r g

u r,

o r,

E 4

la its s

s s

E g

g 4-la t

h f.

m

i e

a t

c n

g t

t e

s s

s i

e t

t t

e e

h r

t t

t e

s n

e e

e e

e e

e t

M W

W W

G W

G W

W W

W W

W W

W W

W un s

s s

n e

e e

e e

e e

n o

0 "0

0 0

"0 0

0 0

"0 0

0" 0

"0 7

7 i

ta

- 7 7

7 7

7 7

7 7

7 7

7 7

7 7

7 v

0 e

7 l

t

'2 s

E a

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y t

A A

A A

A A

A A

A A

A A

A A

A c

n g

B B

B B

B B

B B

B B

8 B

B B

8 o

d W

X X

X X

X X

X X

X X

X X

X X

X C

B R

A A

A A

A A

A A

A A

A A

A A

A l

y t

3 1

3 3

3 3

3 3

3 3

3 3

a s

R B

O 0

O O

O 0

O O

0 O

O O

O O

O 0

l s

3 3

3 1

S S

S S

S 5

S S

5 S

S S

S S

S 5

e e

l O

a S

S S

S S

S S

S S

S S

S S

S S

S S

it s

S E

E E

E E

E E

E E

E E

E E

E E

E n

T e

A s

E s

n e

o to it N

a tS 4

4 6

3 1

3 5

1 r

e 6

2 3

3 3

3 3

4 4

6 6

2 3

3 3

4 e

3 3

5 1

o n 0

4 4

4 4

4 4

4 4

4 4

5 5

5 5

5 1

3 1

w 1

1 1

1 1

1 1

1 1

1 1

1 1

1 l

P 8

8 8

B 8

8 8

8 8

B B

8 8

8 8

8 1

1 1

P e rae lC 7

U 7

N C

O C

/

4 t

/

f C

X X

4 t

6 3

1 3

5 1

o i

6 2

3 3

3 3

3 4

4 6

0 2

3 3

3 4

3 1

1 3

3 5

1 m

D w

0 4

4 4

4 4

4 4

4 4

4 5

5 5

5 5

6 1

1 1

1 1

1 1

4 1

1 1

1 1

1 1

1 1

1 r

Q 2

2 2

2 2

2 2

2 2

2 2

2 2

2 2

P C

4 4

4 4

4 4

4 4

4 4

4 4

4 4

4 4

e 2

g g

l a

i

. 9 0

1 2

3 4

5 6

7 8

9 0

1 2

3 4

P 6

9 9

9 9

9 9

9 9

9 9

0 0

0 0

0 s

2

- 2 2

2 2

2 2

2 2

2 2

3 3

3 3

3 l

contact states cenwr store Enerstred Pilgrim Nuclear Power Station Essential Relay Corstacts schemene Nunser E1pm to INONC1 tYenNel Relay s0 Penet Notes SAT SQBasis BMg Elevadon Manufacturer Model Ntmat,s.-

1225 E170/E8 P208A n.

ew A200M4CAC 305 42-1544 81544 ES 503 AXBAY. 7 0-Westwahouse 1226 E170/E8 P2068 A200M1CAC 306 42-1564tc B1564 ES SO3 AXBAY 70-Wee. g.cuse MO3800 1227 E171tE2 A201K1CA 307 42-1506/O 81566 ES SO3 AXBAY T 17' West;rg.ause 1228 E171tE2 MO3801 306 42-1714 81714 ES 503 RB 27 0-Westh g. case A200MICAC 1229 E210 SH 21/E2 VSF206A 309 42-1715 81 1 ES 503 R8 27 0" Weetingtwuee A200MtCAC 1230 E210 SH 21tE2 VEX 214A 310 42-1741/C B1741 ES SO3 RB 270" Weeta'g.cuse A200M1CAC 1231 M1K315/E18 M01400-3A 311 42-1743/O 81743 ES SO3 R8 27 0*

Weeig.euse A201K1CA 1232 MIK3-15/E18 MO1400-4A 312 42-174cc B1744 ES SO3 RB 27 0*

Westsg.euse A200M1CAC 1233 M1K315tE18 MO1400-24A 313 42-1746/O B1746 ES SO3 RB 27 0" W.4e g.euse A201K1CA 1234 M1K3-15/E18 M01400-25A 314 42-1751tC 81751 ES SO3 RB 27 0" W e e #.euse A200MICACM 1235 M1H51-15tE16 M01001-7A 315 42-1753/C B1753 ES S03 RB 27 0" WestWW.c~=

A200M1CACM 1236 M1H51-15tE16 MO10017C 316 42-1754/C 81754 8

ES SO3 R8 27 0" Westeg.euse A200M1CACM 1237 M1H51-15/E16 MO1001 18A 317 42-1756tO 81756 ES SO3 R8 27 0" Westk g.ouse A201K1CA 1238 M1H51-15tE16 MO1001-23A 318 42-1763/C B1763 8

ES SO3 R8 27 0" West g.cuse A201K1CA 1239 M1H5115/E16 MO1001-16A 319 42-1764/C 51764 ES SO3 RB 27 0' Wee; g.euse AZK)M1CACM 1240 M1J19-1WEll MO2301-4 320 42-1766tO B1766 8

ES SO3 R8 27 0" West.p.euse A201K1CA 9/fS/98 Rev.EO Page: 47of 77

contact stores cenrut steer eneruee Pilgrien Nuclear Power Station Essential Relay Contacts Menny D Fenet Notes SAT SQBasin Bldg Elevanon MamstIncturer ModetNumber schemenc Nunser Equip t0 PONCl (YesNol 1241 M1H5-1-15tE16 M01001-34A s-e.

321 42-177110 81771 8

ES SQ3 R8 2J 0" Wesag.suse A201K1CA 1242 M1H5-1-15/E16 M01001-36A 322 42-1773/O 81773 ES SO3 RB 27 0" Westag. ease A201K1CA 1243 M1H51-15tE16 M01001-37A 323 42-1774/O 81774 ES 503 RB 27 0" W.J.g.euse A201K1CA 1244 M1H5-1-15/E16 M0100143A 324 42 1778/O 81776 ES SO3 RB 27 0" Westig.ouse A201K1CA 1245 M1H51-15tE16 M01001-43C 325 421783tO 81783 8

ES SO3 RB 27 0" Westig.ause A201K1CA 1746 E178/E8 MO4080A 326 42 1784/O 81784 8

ES SQ3 R8 27 0" Weehng%vse A201K1CA 1247 E178/E8 MC40608 327 42-1788tC 81786 ES SO3 RB 2T 0" Weeta-i. case A200M1CAC 1248 E178/E8 M O4065 328 42-1791/C 81791 ES SQ3 RS 27 0" W.4e-g.svee A200MICAC 1249 E177/E4 MO4085A 329 42-1793/C 81793 ES S03 R8 27 0

Weste.if. ease A200MICAC 1250 E177/E4 MO40858 330 42-1796/C 81796 8

ES SO3 R8 27 7 W.eap.:=:

A200M1CAC 1251 E177/E4 M O4084 331 42-18116 816116 ES SO3 R8 27 7 W a ; 4.suse A200M1CAC 1252 E210 SH 21/E2 VEX 2148 332 42-1814 81814 ES SO3 R8 27 0" West g~use A200M1CAC 1253 E210 SH 21tE2 VSF2088 1

333 42-1841/C 81841 ES SO3 R8 27 0" Westigan A200M1CY 1254 M1K3-15tE18 M01400-38 334 42 1843/O 81843 ES SO3 R8 27 0" West-dmuse A200M1CX 1255 MIK3-15tE18 M01400-48 335 421844rc 81844 ES SO3 R8 23' T We;-@=

A200M1CX 1256 M1K3-15tE18 M01400-248 336 42-1848to 81846 ES SO3 R8 27 0" Westinghouse A201 MICA S/ftse New E0 Page: 48of77 i

contact stores contece Store Enerpfred Pilgrien Nucleer Power Station Essential Relay Contacts Men *VJD Penet Noree SAT SQBeste BMp Elevenon Monadecturer neasetNumber schemenc Numeer En e promcl tYesme) 1257 M1K3-15tE18 M01400-25B 337 42-1851/C 81851 ES SO3 RB 27 0" West--g.suse A200M1 CAM 1258 M1H51-15tE16 M01001-78 338 42-1853tc 81853 ES SQ3 RB 27 0-Westmghouse A200M1 CAM 1259 M1H51-15/E16 M O1001-7D 339 42-1854C B1854 8

ES SQ3 R8 27 0-Wa g.s,;=

A200M1CACM 1260 M1H51-15tE16 M01001-188 340 42-1858tO 81856 ES SQ3 R8 27 0" West-6.euse A201K1CX 1261 M1H51-15tE16 M01001-238 341 42-1863tC 81863 8

ES 503 RB 27 0" Westeg.suse A201K1CX 1262 M1H51-15/E16 M01001 168 342 42-1884C 81884 ES SO3 RB 27 0" Wa-J.e,,=

A200M1CAC 1263 M1G159tE9 M01301-16 343 42-1888#O 81886 8

ES SQ3 RB 270" Wa-Gm A201K1CA 1264 M1H51-15/E16 M 01001-348 344 42-187110 B1871 8

ES SO3 RB 27 0" W a g.suse A201K1CA 1265 M1H51-15/E16 M01001-368 345 42-1873I0 81673 ES SQ3 RB 270" Wa;.g=

A201K1CA 1266 M1H51-15tE16 M01001378 346 42-1874tO 81874 ES SQ3 RB 27 F Wa;.g:r A201K1CA 1267 M1H51-15tE16 MO1001438 347 42-187610 81878 ES SO3 RB 27 U*

Wa J.;,;=

A201K1CA 1268 M1H51-15tE16 M01001-430 348 42-1883tO 81883 8

ES SQ3 RB 27 0" Wa g.;,:=

A201K1CX 1269 E178/E8 MO4010A 349 42-1884/O 81884 8

ES SQ3 RB 27 0F Westinghouse A201K1CA 1270 E178tE8 MO40108 r

350 42-1891/C 81891 ES SO3 RB 270" W.. J.e.=

A200M1CXM 1271 E177/E5 MO4009A 351 42-1893tC B1893 ES SO3 R8 270" Westinghouse A200M1CX 1272 E177tES MO40098 352 42-1894C B1894 ES SO3 RB 27 0" Westeghouse A200M1CAC L

9/1898 nw. te Pere: de er vi

contact states conunctsw. enestmee Pilgrim Nuclear Pc.;;.-Stadon Essential Relay Contacts ReeeyJD Penet Notes SAT SQ Baels 'BMg Elevadon Menutincturer ModelNuneber schemenc Number Ep.Q so

@*OceC1 tYesMo) t273 E178'E9 MO4002 NO No s,

w

,w 353 42-1896/C B1896 8

ES SQ3 RB 27 0" West p~use A200MICX 1274 E177/E4 MO4083 354 42-202 4 0 B2024 ES SQ3 RB 27 0" West di,use A200M2CAC 1275 M1H5-1-15/E16 MO1001-29A 355 42-2026/O B2026 ES SO3 RB 27 0" Westig.c.use A200M2CAC 1276 M1HS-1-15/E16 MO1001298 356 42-2031/C B2031 8

%S SQ3 RB 27 r W 4 J.c.uee A201K3CA 1277 M1H41/E6 M01001-28A t

357 42-2031XR 82031 4

ES SO1 RB 27 0" General Electric CR120B022-22 1278 E5010/E10 M01001-28A NO No 358 42-203*C B2034 8

ES SQ3 RB 27 &

Westenghouse A201K3CA 1279 MtH41/E6 M01001-288 359 42-2034xR 82034 4

ES SQ1 RB 27 0" General Etectric CR120B022-22 1280 E5010/E10 M01001-288 NO No 380 42-2043/O B2043 8

ES SQ3 RB 27 r W a G ~use A201K1CA 361 42 2046/O B2046 ES SO3 98 2y r West #.c~a A201K1CA 1282 M1N28-12/E20 M01001-50 j

j 362 42-2054C B2054 ES SQ3 RB 2J 0" Westigc,ase A200MtCAC 1283 M1N28-12/E20 mot 201-2 363 42-2054/O B2054 ES SQ3 RB 27 7 W.4-g.c.use A20tKtCA 1284 MIN 28-12/E20 Mot 201-2 364 42-2056/C B2056 ES SQ3 RB 27 0" W e g muse A200MICAC 1285 M1N28-12/E20 Mot 201-80 365 42-2056/O B2056 ES SQ3 RB 27 0" W ai ga,ase A20tKtCA 1286 MIN 28-12/E20 M01201-80 l

t 386 42-2074/O B2074 ES SQ3 RB 27 0" Westig.c,use A20tK1CA 1287 M1N28-12/E20 MO220-1 367 42-2083C B2083 ES SO3 RB 27 r Wesii9.c,uee A200M2CAC 1288 E410/E10 MO202-5A c

368 42-2096/C B2096

'S SQ3 RB 27 0" W W a g ~use A200M2CAC

  • /fW Rev.E0 l

Page: 50 of TT 1

contact States contact store eneptues Pilgrim Nuclear Pca;; Station Essential Relay Contacts

,^ 80 Panel Noten SAT SQ Beels Bldg Elevatoon M = tarer ModelNumber scheneoc Number Equip a tNoNQ (Yesmop 1289 E410rE10 MO202 58 s.

w

,w 369 42-731/1F 0 731 ES SQ3 RB

, 27 0" Wesie 9.esa MME20-25 t

1290 MIN 28-12E20 M01201-5 370 42-731/1R D731 ES SQ3 RB 270" West geuse MME20-25 1291 MIN 28-12E20 M O1201-5 371 42-741/C D741 ES SQ3 RB 270" Westmghouse MME20-25 1292 E172E3 M O3808 372 42-744tC 0744 ES SO3 RB 27 0" Wes;-f~ase MME20-25 1293 M1G1111/E13 M Ot30t-17 373 42-751tO 0751 8

ES SO3 RB 27 7 Westeghouse MME20-25 1294 M1G11-11E13 M01301-61 374 42-754tC D754 ES SO3 RB 27 0" Westig.euse MME20-25 1295 MIG 11-11/E13 M01301-22 375 42-76110 0761 ES SO3 RB 27U" West F. ease MME20-25 1296 M1G11-11rE13 M O1301-25 376 42-764/O 0764 ES SO3 RB 27 0*

West g.euse MME20-25 1297 M1G11-11tE13 M01301-26 377 42-771tC D771 ES SQt RB 27 0" Cutter H. T -

6002H485A 1298 mig 11-11/E13 M0130148- - - -

378 42-774tO D774 ES SO3 RB 23'0" Wes;;.9r.cose MME20-25 1299 M1G11-11!E13 M0130149 379 42-781/O 0781 ES 503 RB 27 0" Wa gm MME20-25 1300 mig 11-11/E13 MO1301-53 380 42 784/O 0784 ES SQ3 RB 27 F W W' g.euse MME20-25 1301 M1G1111/E13 M01301-60 381 42-794tO 0794 8

Es 503 RB 27 0" Weetnghouse MME20-25 1302 M1G11-11/E13 M0130142 382 42-814tC D814 ES SQ3 RB 27 0*

Westeghouse MME20-25 1303 M1J14-14tE19 MO2301-6 383 42-82110 D821 ES SO3 RB 27 0" Westmghouse MME20-25 1304 M1J14-14/E19 MO2301 14 384 42-824/O 0824 ES SQ3 RB 27 0" Westeghouse MME20-50 f/18,98 Rev EO Page: S1 et 77

contact states coeract snare eneresen Pilgrim Nuclear Power Station Essential Relay Contacts MeheY80 Pano!

Notes SAT SQBasis Bleig Eleversort Manufacturer Montet Number Sctromaec Nunter Equep 80 tNO@eQ (YeatNel 1305 M1J14-14/E19 M O2301-35 s.

=.e MME20-50 27 0" Westep.c.use 1306 M1J1414/E19 MO2301-36 385 42-831/O D631 ES SO3 RB 386 42434/C D634 ES SO3 R8 23 7 West-g~,,.:

MME20-25 1307 E172K3 M O3613 367 42-94170 0941 ES SO1 RB 27 0" CuMor H

.-.a; 6002H485A 1306 M1J14-14/E19 MO2301 15 MME20-50 386 42-944/C 0944 8

ES S03 RB 27 7 W :.cg.c.use 1309 M1Jt4-14/E19 MO2301-3 389 42-951tC 0951 ES SO3 RB 27 0" W.-- e.c.see MME20-50 1310 M1J14-14/E19 MO2301-5 390 42-954/O 0954 ES SO3 RB 27 0" Weseg.c.,;;:

MME20-50 1

1311 M1J14-14/E19 M O2301-8 391 42-96111F D961 4

ES SO3 RS 27 0" W..^ g.c,ase MME-20-50 1312 M1N26-12/E20 MO1001-47 392 42-964/C 0964 ES SO1 R8 27 0" Cuner Hersner 6002H48SA 1313 M1J1414/E19 MO23019 West h MME20-50 393 42-97110 D971 ES SO3 R8 27 F 1314 M1J1414/E19 MO2301 10 394 42X-741/C D741 ES SO1 RB 27 0" Wesanghouse BFD33S 1315 E172E3 M O3606 395 42X-744rc D744 ES SO1 RB 27 7 W ;-g-,;;:

BFD33S 1316 M1G11-11/E13 M01301-17 j

396 42X-751/0 D751 8

ES SO1 R8 27 0" WM-4.:.c BFD33S 1317 mig 11-11/E13 M01301-61 397 42X-754/C D754 ES SO1 R8 27 0" Wesad,.=

8FD33S 1318 M1G11-11/E13 M01301-22 j

398 42X-761tO D761 ES SO1 RB 27 0" West g one 8FD33S 1319 M1G11-11/E13 Mot 301-25 399 42X-764/O D764 ES SO1 RB 270" W ^ g _-

8FD33S 1320 M1G.11-11tE13 M0.1301-26 400 42X-771/C DTil ES OL2 RB 27 0" Cuner Hw. i PIN 9575H20t8A Type 626 9/ft90 Rev. E0 Page $2 of 77

I

_qantact stores Contact store Enorytred PHgrim Nuclear Power Station Essential Relay Contacts sena eee m meer eques e g,c,;rq tremone) noneye penet nones sar so seers sur severson nenner\\ecturer needetnumeer 1321 M1G1111tE13 M01301.ee BFD33S 401 42X-774r0 0774 ES SQt R8 27 0" W=ea.fr.cuse n.

1322 M1G11-11/E13 M0130149 P/N 9575H2018A Type 626 ES OL2 RS 27 0" Camer Hammer 1323 M1G1111tE13 M0130153 402 42X-7610 0781 8FD33S ES SQt RS 27 0" W,4 g:m 1324 M1G11-11/E13 M01301-60 403 42X 7840 0784 404 42X-794/O 0794 8

ES SQt R8 27 0" W.4;.-g.r.,see 8FD33S 1325 M1G11-11rE13 MO1301-62 405 42X-814/C 0814 ES SQ1 RS 2T 0" W,e g:m BFD33S 1326 M1J1414/E19 MO23014 8FD33S 406 42X4210

'1621 ES SQ1 RS 27 0" W 4./.e,;:

1327 M1Jt&t4/E19 MO2301-14 407 42X4240 0624 ES SQ1 RS 27 0" W.e -g.r.,:::

BFD33S 1328 M1J1414/E19 M O2301-35 406 42X43110 0831 ES SQt RS 27 0" W4 4:m BFD33S 1329 M1J1614/E19 MO230136 BFD33S 409 42X-834tC 06"-J ES S01 R8 27 0" W ;.g:r 1330 E172/E3 MO36_13 P/N 9575H2018A Type 626 410 42X 94110 D941 ES OL2 RB 27 F Cutter Hammer 1331 M1J14-14fE19 MO2301-15 411 42X-944tC D944 8

ES SQt R8 270" W.J g.r,ase 8FD33S 1332 M1J1414tE19 M O2301-3 412 42X-951rc D951 ES SQ1 R8 27 0" W.J;rg.r.,:::

8FD33S 1333 M1J1&t4/E19 MO23015 413 42X-954f0 D954 ES SQ1 R8 270" J._ g.same 8FD33S 1334 M1J1414/E19 MO2301-8 414 42X-96110 D961 ES SQ1 RS 27 0" W.- 4,ase 8F033S 1335 M1N2812/E20 M01001-47 PJN 9575H2016A Type 626 41S 42X-96&C 0964 ES OL2 RB 270" Cuner H...-.;

- - - _230._1_9_ _.

MO 1336 M1J1414/E19 416 42X-971tO D971 ES S01 R8 2717' W e.i;.same 8FD33S 9/1&98 Mew Et rego: S3 ofIT

contact states cearne ster. rwr.e Pilgrim Nuclear Power Station Essential Relay Contacts MoneyD Penet Notee SAT SQBeels Bldg Elevation Manufacturer ModelNumber schemede Number Egenono INowC)

(Yes/Nel 1337 M1J14-14E19 MO2301-10_

s.

417 52X B102 23 ES OL2 TB 37 0" General Etectric AK-2A-50-1 1338 E46/E4 B102 418 52X 8202 23 ES OL2 TB 27 0" Geise Electnc AK-2A-50-1 1339 E46/E4 B202 C19 52X 8310 23 ES OL2 TB 37 0"

%=-M Electnc AK-2A-25-1 1340 E43/E2 8310 420 52X 8410 23 ES OL2 TB 27 0"

%+c Electric AK-2A-25-1 1341 E43/E2 B410 C21 52X B601 23 ES OL2 RW 27 0"

%we Electric AK-2A-50-1 1342 E46/E4 B601 422 52X B602 23 ES OL2 RW 27 0"

%we Electne AK-2A-50-1 1343 E46/E4 B602 423 52X B605 23 ES OL2 RW 27 0" General EMts;c AK-2A-25-1 1344 E43E2 B605 424 52X B606.

23 ES OL2 RW 27 (T General Electnc AK-2A-25-1 1345 E43/E2 B606 425 5A-K14A C915 ES SO3 RW 37 0" General Electric CR10501 1346 M1N21-9/E3 SOV305-117114 NO No 1347 MtN19-7E3 SOV305-117-2/3 NO No 1346 MIN 21-9tE3 SV302-20A NO No 1349 M1N19-7E3 SV302-20C NO No 1350 M1N21-943 SV302 21 A NO No 1351 MIN 19-7E3 SV302-21C NO No 426 5A-K148 C917 ES SO3 RW 37 0" General Electnc CR10501 1352 M1N21-9/E3 SOV305-118114 NO No 1353 MIN 20-7E2 SOV305-118-2f3 NO No 1354 M1N21-91E3 SV302-208 NO No 1355 M1N20-7/E2 SV302-200 NO No 1356 M1N21-9/E3 SV302-219 NO No 1357 M1N20-742 SV302-210 NO No 427 5A-K14C C915 ES SO3 RW 37 0" General Elec*nc CR105 1358 M1N21-943 SOV305-117-114 NO No 9/f8/98 Page: 54 et 77

{

Rev. EO

.. =. --.

contact states Contact State Energtred schennec Num6er EquepIO WI Lyes **el Pilgrim Nuclear Power Station Essential Relay Contacts SAT SQBeels Bldg Elevacoot M. ":-:turer MohlNumber No SOV305-117-2/3 NO Penel Notes 1359 M1N19 7/E3 L:.;D 1360 M1N21&E3 SV302-20A NO No s-1361 M1N19-7tE3 SV302-20C NO No n-,=

1362 M1N21-9/E3 SV302-21 A NO No 1363 M1N19-7tE3 SV302-21C NO No ___

w.

ww, w

,., =

ES SO3 RW 37 0" Generet Electne CR10501 1364 M1N21-9/E3 SOV3051181s4 NO No n.

=

No

<28 5A-K140 C917 SOV305118-2/3 NO 1365 M1N20-7/E2 1366 M1N21-9/E3 SV302-208 NO No 1387 MIN 20 7E2 SV302-200 NO No Sv302-218 NO No 1368 MIN 21-9tE3 1369 M1N20-7/E2 Sv302-210 NO No ES SO3 RW 37 0" General Electnc CR3050 1370 MIN 19-7tE3 SOV305-117114 NO No 429 5A-K14E C915 SOV305-117 2f3 NO No 1371 M1N21*E3 1372 M1N19-7/E3 SV302 20A NO No 1373 M1N219/E3 SV302-20C NO No 1374 MIN 19-7/E3 SV302-21 A NO No 1375 M1N21-9/E3 Sv302-_21C

..NO...... No ES SO3 RW 3T 0" Gene of Electric CR105 1376 MIN 20-7/E2 SOV305-118-114 NO No 430 5A K14F C917 No 1377 M1N21-9/E3 SOV305-118-2/3 NO 1378 M1N20-7/E2 SV302-200 NO No 1379 M1N19-7!E3 SV302-200 NO No 1380 M1N20 7E2 SV302-218 NO No 1381 M1N19-7/E3 SV302-210 NO No 431 5A-K14G C915 ES SQ3 RW 3T 0" Generet Electric CR105 1382 M1N19-7/E3 SOV305117-114 NO No No 1383 M1N21-9/E3 SOV305-117-2/3 NO 1384 M1N19-7/E3 SV302-20A NO No 1365 M1N21-9/E3 SV302-20C NJ No 1386 MIN 19-7/E3 SV302-21 A NO No Sv302-21C NO No 138_7 M1N21-9tE3 432 5A-K14H C917 ES 503 RW 37 0" Generet Electric CR3050 9/f8,98 New f 0 Page: SSof 77

~.

i contact States centut ssue ewe ree r

Pilgrim Nuclear Power Station Essential Relay Contacts noneya renet Notes sAr soseals BMg Eleven n Manutecturer ModelNumber schemene numeer Equy no INOnc)

(Yeemo) 1388 MIN 20 7E2 SOV305-118-1/4 NO No s

w.=,

1389 M1N21-9/E3 Sov305-118-2/3 NO No sww 1390 M1N20-7E2 SV302-208 NO No sw 1391 M1N19-7/E3 SV302-200 NO No n

w, 1392 MIN 20 7E2 SV302 218 NO No s.

w 1393 M1N19-7E3 SV302-21D NO No s.

w.m.

433 5A-K15A C915 ES SO3 RW 37 0" General Electnc CR10501 1394 M1N21-9E3 SOV305-1171/4 NO No 1395 MIN 197E3 SOV305-117-2/3 NO No 1396 M1N21-9/E3 SV302-20A NO No 1397 M1N19-7E3 SV302 20C NO No 1398 M1N219/E3 SV302-21 A NO No 1399 M1N19-7E3 SV302-21C NO No 434 5A-K158 C917 ES SQ3 RW 37 0" General Electnc CR10501 1400 M1N21-9/E3 SOV305-118-1/4 NO No 1401 M1N20-7E2 SOV305-118-2/3 NO No l

1402 MIN 21-9tE3 SV302-208 NO No 1403 M1N20-7/E2 SV302-200 NO No l

I 1404 MIN 21-9/E3 SV302-218 NO No S

No i

...V3_02._-2_1 D _.-NO._ _

4 1405 M1N20-7E2 435 5A-K15C C915 ES SO3 RW 37 0" General Eb*1c CR105 1408 MIN 19-7/f t SOV305-117114 NO No 1407 M1N20-7/E2 SOV305-117 2/3 NO No

[

1408 M1N19-7E3 SV302-20A NO No 1409 M1N21-9/E3 SV302-20C NO No l

1410 M1N19-743 SV302-21 A NO No 1411 M1N21-9/E3 SV302-21C NO No _

l 436 5A-K150 C917 ES SO3 RW 37 0" General Electnc CR105 l

1412 M1N20-7E2 SOV305-118-1/4 NO t%

1413 M1N21-9/E3 SOV305-118-2/3 NO No 1414 M1N20-7E2 SV302-208 NO No 1415 MIN 21-9/E3 SV302-200 NO No 1416 M1N20-7/E2 SV302-218 NO No 1417 MIN 21-9tE3 SV302-2 t D

, NO No D/fS16 Mov. EO Page: 36 of 77

contact States centeer state Enesered Pilgritn Nuclear Power Station Essential Relay Contacts Money 00 Pereet Notes SAT SQ 8 asis Body EleveNorr Mamrfecturer Modet Number schemenc Nuno6er Ewa to twnect LYesNel C37 5A K18A C915 ES SQt RW 3T O' Generet Electre 12HFA151A2F 1418 M1N19-7 LS302-83A NO No No 1419 M1N20-7 LS302-83_8_ _ _ _-.NO___.

438 5A-K18C C915 ES SO1 RW 37 0" General Electre 12HFA151A2F 1420 M1N19-7 LS302-82C NO No 1421 M1N20-7 LS302-820 NO No 439 5A K19A C915 ES S01 RW 3T 0" General E"ecac 12HFA151A2F 1422 M1N19-7/E3 SOV305-117114 NO No 1423 M1N19-7/E3 SOV305-117-2f3 NO No 1424 MIN 19-7E3 SV302-20A NO No 1425 MIN 19-7tE3 SV302-20C NO No 1426 M1N19-TE3 SV302-21 A NO No 1427 M1N19-7/E3 SV302-21C NO No 440 5A-K198 C917 ES SO1 RW 37 0" G=,-al Electric 12HFA151A2F 1428 M1N20-7/E2 SOV3051181/4 NO No 1429 M1N20-7E2 SOV305-118-2f3 NO No 1430 M1N20-7E2 SV302-208 NO No 1431 M1N20-7E2 SV302-200 NO No 1432 MIN 20-7/E2 SV302-2t 8 NO No SV302 NO No

... -_. _ -210

. _33- _M1 N2_0.7E 2 14 441 5A-K19C C915 ES SOS RW 37 0' General Electric 12HFA151A2F 1434 M1N19-7/E3 SOV305-1171/4 NO No 1435 M1N19-7/E3 SOV305-117-2/3 NO No 1436 MIN 19-7/E3 SV302-20A NO No 1437 MIN 19-7E3 SV302-20C NO No 1438 M1N19 7E3 SV302-21 A NO No 1439 M1N19-7/E3 SV302-21C NO No 442 5A-K190 C917 ES SO1

'W 37 0" General Electne 12HFA151A2F 1440 MIN 20-7/E2 SOV305-118114 NO No 1441 MIN 20-7/E2 SOV305-118-2/3 NO No 1442 MIN 20-7tE2 SV302-208 NO No 1443 MIN 20-7/E2 SV302-200 NO No 1444 M1N20-7/E2 Sv302-218 NO No No SV302-210__._NO_ _ _

1445 M1N20-7/E2 9/f8/98 Nov. EO Page: S7 or17

contact states Connect stese Ene vred Pilgrim Nuclear Pc;= Station Essential Relay Contacts Reney D Penet Notes SAT SQBesle Bldg Elevadon Menutlecturer ModelNumber schemene Num6er Equ> no twonecs tveswe) 443 5A-K1C C915 ES SOS RW 37 0" Generet Electre 12HFA151A2F No 1446 M1N174 LS30242C NO 444 5A-K10 C917 ES SOS RW 37 0" Generel Electnc 12HFA151A2F 1447 M1N18-8 LS302420 NO No 445 5A-K28A C915 ES SO1 RW 37 0" General Electre 12HFA151A2F 1448 M1N17-8 LS30243A NO No i

I 448 5A-K288 C917 ES SQ1 RW 37 0" General Electric 12HFA151A2F 1449 M1N18-8 LS302438 NO No 447 5A-K53A C2228-Al ES OL2 RW 270" Agostet GPBN 1450 M1N17-8 PS37 NO No 448 5A-.OS C2229-B1 ES OL2 RW 27 0" Agostet GPSN 1451 MIN 184 PS38 NO No 449 SA-K53C C2228-A2 ES OL2 RW 270" Agostet GP8N 1452 MIN 174 PS39 NO No 450 SA-K530 C2229-82 ES OL2 RW 23 0" Agostet GPSN 1453 M1N184 PS40 NO No 451 5A-K74A C2228-At ES OL2 RW 270" Agnetet GPON 1454 E698/E11 LS30243A NO No b

452 SA-K748 C2229-81 ES OL2 RW 27 0" Agostet GPSN 1455 E700/E10 LS302 838 NO No 453 5A-K74C C2228-A1 ES OL2 RW 27 0*

Agostet GPBN 1456 E699/E7 LS30242C NO No 454 5A-K740 C2229-82 ES OL2 RW 27 0" Agostet GPBN 1457 E701/E8 LS302420 NO No 4S5 5A-K8A C915 ES SOS RW 37 0" Generel Electrte 12HFA151A2F 1458 M1N19-7 PS37 NO No 456 5A-K88 C917 ES SOS RW 37 0" Generel Electric 12HFA151A2F 1459 MIN 20 7 PS38 NO No 457 5A-K8C C915 ES SO1 RW 37 0*

General Electric 12HFA151A2F 1460 MIN 19-7 PS39 NO No 458 5A K80 C9t7 ES SOS RW 3T 0" Generet Electric 12HF A151 A2F 1461 M1N20-7 PS40 NO No 9/ft98 Rev.E0 Pope: 58 of 71

I Contact states conrect store Enestemt Pilgrim Nuclear Power Station Essential Relay Contacts Money 60 Penet Notes SAT SQ Basis Bldy Elevedon Menutecturer ModelNumber schemenc Nunser Equqp e INONC) tYo*No) 459 SA-K9A C915 ES SO1 RW 37 0" General EMnc 12HFA151A2F 1462 MIN 19-7 PS37 NO No 460 5A-K98 C917 ES SQ1 RW 37 7 General Electre 12HFA151A2F 1463 MIN 20-7 PS38 NO No 461 5A-K9C C915 ES SQ1 RW 37 0" Gewe E6k c 12HFA151A2F 1464 M1N19-7 PS39 NO No 462 5A-K90 C917 ES S01 RW 370" G

e Electric 12HFA151A2F 1465 M1N20-7 PS40 NO No 463 62-104A C6 ES SQ1 RW 37 0" Agostat 2412P8L 1466 E18/E7 8106 NO/NC No 1467 E18/E7 SV4569A NO/NC No 1468 E18/E7 SV4570A NO/NC No 1469 E18/E7 SV4587A NO/NC No 1470 E18/E7 SV45878 NO/NC No 464 62-1048 C6 ES SQt RW 370" Agastet 2412PBL 1471 E18/E7 B206 NO/NC No 1472 E18/E7 SV45696 NO/NC No 1473 E18/E7 SV45700 NO/NC No 1474 E18/E7 SV4589A NO/NC No 1475 E18/E7 SV45890 NO/NC No 465 62-1061 C1 ES SQ1 RW 37 0" Agostat 2412AE-T 1476 E170/E8 P206C NC No 496 62-1431 C1 ES SQt RW 37 0" Agastet 2412AE-T 1477 E176 SH 2/E7 P202D NO No 467 62-1433 C1-ES SQt RW 3T r Agostat 2412AE-T 1478 E176 SH.2/E7 P202E NO, No 468 62 1435 C1 ES SQ1 RW 37 0-Ages'at 2412AE-T 1479 E176 SH.1/E7 P202F NO No l

469 62-1441 C1 ES SO1 RW 3T 0" Agostat 2412AE-T 1480 E170/E8 P2080 NO No 470 62-1444 C1 ES SQt RW 3T r Agostet 2412AE-T 1481 E170/E8 P208E NO No 47f 62 1531 C1 ES SQt RW 3T F Agostat 2412AE-T 9/f8/98 Rev. E0 Page: 59 of 77 i

~'

contact states Centeet Steee Eneoptred Pilgrim Nuclear Power Station Essential Relay Contacts Money 80 Panet Neeen SAT SQBaele Bhsp Elevanon nienutechwer ntodelNumber schemenc Nunser me tNowc)

(veenes NO No 1482 E176 S_H 1/E7

, P202A_

e. -

C72 62-1533 C1 ES SQt RW 3T 0" Agestat 2412AE-T 1483 E176 SH 1E7 P202B NO No 2412AE-T C73 62-1535 C1 ES S01 RW 3T 0" Agostat 1464 E176 SH tie 7 P202C NO No 474 62-1541 C1 ES SQ1 RW 3T 0" Agnolet 2412AE-T 1485 E170/E8 P208A NO No C75 62-1544 C1 ES SO1 RW 37 0" Agostat 2412AE.T 1486 E170/E8 P2000 NO No 476 A44X C904 ES SQt RW 37 0" Agostat EGP-t-750 1487 M1N35-7/E7 SV220-44 NO Yes 477 A45X C904 ES SO1 RW 37 (T A0estat EGP-t-750 1488 MIN 35-7tE7 SV220-45 NO Yes _

G78 AR D33 ES OL1 T8 23 0" Automatic Switch Co To8eDetermined 1489 ES34/E1 D32 NO/NC Yes 1490 E534/E1 D33 NOINC Yes 479 CKVR C1038 ES SQ1 DG A 23'0" W.eigm 8FD30S 1498 M6-22-14 SH 1E20 X107A NO No 480 CKVR C1048 ES 501 DGB 23 0" Westinghouse BFD30S 1492 M6-22-14 SH 2E18 X1078 NO No 481 CKVS X107A ES SO4 DGA 270" Pewton Mitches PM-120 1493 M6-2214 SH 1E20 X107A 482 CKVS X1078 ES SO4 DG B 270" Ponton Mitches PM-120 1494 M6-2214 SH 2/E18 X1078 463 CR1 C1038 19 ES SQt DGA 27 0" W.4e-gm BFD20S 1495 M6-22-14 SH 1E20 SV4566A NO No 1496 M6-22-14 SH ttE20 Sv45878 NO No 464 CR1 C104B 19 ES S01 DG8 27 0" West..Fw BFD20S 1497 M6-22-14 SH 2E18 SV4588A NO No 1498 M6-22-14 SH 2E18 SV45898 NO No 485 CR2 C1038 19 ES 501 DGA 23'0" West-ga.:

8F020S 1499 M6-22-14 SH 1/E20 Sv45668 NO No 5/f8/98 Rev. EO Page: 60 of 77

l l

contact states cent.cr srme en-yrred Pilgrim Nuclear Power Station Essential Relay Contacts M yDD Panet Notes SAT SQBasis Bldg Elevanorr Memetscturer ModelNumtw schanese Number twa tNcwec)

(Yesmo) 1500 M6-2214 SH 1E20 SV4587A NO No s.

w%~

486 CR2 C104B 19 ES SQt DG B, 27 0-West.gm BFD20S 1501 M6-22-14 SH 2118 SV4588B NO No 1502 M6-22-14 SH 2E18 SV4589A NO No 487 DCFC C101 ES OL2 DG A 27 0-W e g.suse MDtto 1503 E40rE7 A509 NO Yes 1504 M6 46-6 SH.1E4 X107A-ER NO Yes 488 DCFC C102 ES OL2 DG B 27 0" Wese.g.suse MDi t0 1505 E40/E7 A609 NO Yes 1506 M6-46-6 SH 2/E4 X1078-ER NO Yes 489 DCFT1 C101 ES OL4 DG A 270" Agostet 2412PD 1507 E4CVE7 A509 NO Yes 1508 M6-46-6 SH 1E4 X107A-ER NO Yes 490 DCFT1 C102 ES SO1 DGB 27 0" Agostet 7012PC 1509 i YE7 A609 NO Yes 1510 M6-46-6 SH 2E4 X107B-ER NO Yes 491 DCFT2 C103B 19 ES Old DGA 27 0" Agostet 2412PD 1511 E422E6 SVL22 NO No 1512 M6-22-14 SH.1/E20 X107A NC Yes 492 DCFT2 C104B 19 ES OL4 DG B 2TIr Agentet 2412PD 1513 E422K6 SVL23 NO No 1514 M6-22-14 SH.2E18 X1078 NC Yes 493 DGSR-1 C89 4.19 ES SO1 DG A 27(T Agostat 2422AC 1515 E454E4 VEX 214.*

NC Yes 1516 E454/E4 VSF20&A NC Yes 494 DGSR-2 C90 4,19 ES SQt DGB 270" Agmatet 2422AC 1517 E454/E4 VEX 2148 NC Yes 1518 E454/E4 VSF2088 NC Yes 495 dPIS-2353 C2257A ES SQ3 RB

-1T 6" Barton 288 1519 M1J16-10/E22 CV9068A 1520 M1J16-10/E22 CV90688 1521 M1J16-10rE22 M O2301-35 1522 M1J16-10/E22 MO2301-36 SftSM gey, go Page: 61of 77

contact states l

coneece seese Enerytrear seheneene Nuneer Emunee W)

LYeanne)

Pilgrim Nuclear Power Station Essential Relay Contacts needel Nuorter sAr soseets sidy Eleve86rr neenullochwer MO23014 1523 M1J16-10rE22 rener w ee noenya MO2301-5 1524 MtJ16-10E22 l

1525 M1Jt6-10/E22 SV2300-9 m._

g. -

a 266 ES SO3 RB

-17 6" Berton 1526 M1JtS10E16 CV9066A page en selng maes Sea.

C2257A CV90668 496 dPIS2352 1527 M1J15-10E16 r

MO2301-35 1526 M1J15-10E16 MO2301-36 1529 M1J15-10E16 MO23014 1530 M1J1510/E16 MO2301-5 1531 MtJ15-10rE16 SV2300-9 1532 M1JtS 10E16 BFD66S ES SO1 DG A 23'0" W- :-,'. =-e A505 1533 E37E3 C101 A509 NC No 497 DR 1534 E40rE7 1535 M6 46-6 SH 1E4 X107A-ER NO/NC No BFD66S ES Sui DG 8 27 0" WW. igm A605 1536 E37/E3 C102 A609 NC No 496 DR 1537 E40/E7 1536 M6 46-6 SH 2iE4 X1078-ER NO!NC No r

BF022S NO No ES S01 OG A 27 (r Weehnghouse A509 1539 E40/E7 Clot l

499 DRX BFD22S NO No ES SQt DGB 27 0" WW-gr-A609 1540 E40/E7 C102 500 DRX C1038 19 ES SQt DG A 27 0" W.4.;m 1541 M6-446 SH 1/E4 A505 NC No BFD66S 501 EMSR 1542 M6-22-14 SH 1E20 A509 NC No 1543 M6-22-14 SH 1420 SV4566A NO No 1544 M6-22-14 SH.1620 SV45668 NO No 1545 M6-22-14 SH 1/E20 SV4567A NO No 1546 M6-2214 SH 1E20 SV45678 NO No 1547 M6-2214 SH 1E20 X107A NO/NC No 1546 M446-6 SH 1/E4 X107A-ER NC No 502 EMSR C1048 19 ES S01 OGB 27 0-Weer-g: r Bro 66S NC No 1549 M6-2214 SH 2/E21 A605 S/fRSS Rev.EO Pope: 62of 77 e

-.a

~

contact States Pilgrim Nuclear Power Station Essential Relay Contacts Conence store Enerpered Money JD Panel Nehe SAT SQ Benin Bids Elevadon Menut\\ecturer ModelNumber senemenc Nunser Em o twowcp (reswe) 1550 M6-22-14 SH 2/E21 A609 NC No s-*=-

1551 MS-22-14 SH.2E18 SV4588A NO No 1552 M6-22-14 SH.2E18 SV4588B NO No 1553 M6-22-14 SH.2E18 SV4589A NO No 1554 M6-22-14 SH 2E18 SV45898 NO No 1555 M6-22-14 SH 2E18 X1078 NO/NC No 1556 M6-46-6 SH 2/E4 X1078-ER NC No e.

=

503 ESR1 C103B 19 ES SQt DG A 270" W e g muse BFD64S 1557 M6 22-14 SH 1E20 A509 NC No 1558 M6-22-14 SH.1/E20 SV4569A N3 No 1559 M6-22-14 SH.1E20 SV4570A NO No 1560 M6-22-14 SH.1E20 SV4587A NO No 1561 M6-2214 SH.1E20 SV45878 NO No 1562 M6-22-14 SH 1E20 X107A NO No 1563 M6-464 SH 1E4 X107A-ER NC No 504 ESR1 C1048 19 ES SQt DGB 27 0" West;r.ff.c,use BFD843 1564 M6-22-14 SH 2E21 A609 NC No i

1565 M6-22-14 SH 2/E18 SV45898 NO No 1586 M6-22-14 SH 2E18 SV4570B NO No 1567 M6-22-14 SH 2E18 SV4589A NO No p

1568 M6-22-14 SH 2E18 SV45898 NO No

{

1569 M6-22-14 SH 2/E18 X1078 NO No 1570 M6M SH.2E4 X1078-ER NC No I

505 ESR2 C1038 19 ES SO1 DG A 270" Westingi%see BFD84S 1571 E40E7 A509 NC No 1572 M6-22-14 SH 1/E20 SV4569A NO No 1573 M6-22-14 SH.1/E20 SV4570A NO No 1574 M6-22-14 SH.1E20 SV4567A NO No 1575 M6-22-14 SH 1E20 SV4587B NO No 1576 E422E6 SVL22 NC Yes 1577 M6-22-14 SH 1E20 X107A NO No 1578 M6-46-6 SH.1E4 X107A-ER NC No 506 ESR2 C1048 19 ES SO1 DG B 27 0" Westinghouse BFD64S 1579 E40/E7 A609 NC No 1580 M6-22-14 SH 2/E18 SV45698 NO No 9/f8,96 Page: 63 of 77 Rev.E0 i

_ ontact states C

ce,w.a seme En.rew schemenc Num6er E% so liia;Q (YeaNo)

Pilgrim Nuclear Power Station Essential Reisy Contacts M*y 80 Penel Notee SM SQBaeJe Bide Bevedon hiancatectaaer htodelNunsber 1581 M6-22-14 SH 2E18 SV45708 NO No 1582 M6-2214 SH 2E18 SV4589A NO No s.

1583 M6-22-14 SH 2E18 SV45898 NO No SVL23 NC Yes

=-

1584 E422E6 s_

NO No s - =.=., w 1585 M6-2214 SH 2tE18 X1078 i

n p w=

1586 MSA6-6 SH 2E4 X1078-ER NC No s-.-

Egestat 7022P8 A509 NC No s.

507 ESR3 C1038 19 ES SQt DG A 27 CF 1587 E40/E7 7022PB NC No 508 ESR3 Ct048 19 ES SQt DG B 27 0*

Agostet 1588 E@ET A609 289 1589 M1G1212E11 MO1301-60 NOMC Yes/No ES SO3 RB 2' 9" Barton 509 FSL1360-7 C2258 BFD71S NO No C1038 19 ES SQ1 DG A 27 0" WW.gm 1590 M6-22-14 SH 1/E20 A509 510 JWPR1 1591 M6-22-14 SH 1E20 X107A NO/NC No 1592 M&468 SH 1/E4 X107A-ER 511 JWPR1 C1048 19 ES SQ1 DG B 27 0" W 6 g.euse BFD71S 1593 M6-22-14 SH 2K21 A609 NO No 1594 M6-22-14 SH 2tE18 X1078 NO/NC No 1595 M6-46 6_SH. 244 X.1078-ER

.~

512 JWPM2 C1038 19 ES S01 DG A 27 0" W r g:-_-

8FD715 1596 M6 2214 SH 1/E20 A509 NO No 1597 M6-2214 SH.1/E20 X107A NO/NC No 1598 M6 466 SH 1tE4 X107A-ER 513 JWPR2 C1048 19 ES SQ1 DG B 27 0' W e.g.r,uee 8FD71S 1599 MS-2214 SH 2E21 A609 NO No 1600 M6-22-14 SH 2/E18 X1078 NOINC No 1601 MS-464 SH 2/E4 X1078-ER 514 JWPS1 X107A ES SO4 DG A 27(T Unned Electnc Control Type J6 Modet 156 1602 M6-22-14 SH 1!E20 X107A 515 JWPS1 X1078 ES SO4 DG 8 27(F Unsed Electnc Control Type J6 Modet 156 1603 M6-22-14 SH 2/E18 X1078 _

Unned Electric Control Type J6 Model 156 516 JWPS2 X107A ES SO4 DGA 270" 9/18/98 Rev E0 Page: 64 of 77

contact states coroet sene E,n PHgrim Nuclear Power Stadon Essential Relay Contacts neiere renet noten sar so seein BMg Elevenen M e m h eturer noodetskmker senemenc Nwe6er Etpnp D tuonnc)

(YeeMel 1604 M6 22-14 SH.1tE20 X107A 517 JWPS2 X1078 ES SO4 DGB 27 0' Unsed Electnc Control Type J6 Model t56 s.

n e.an.oe ne=

1605 M6-22-14 SH 2/E18 X1078 ES S01 DG A 27 0" West.#.asse BFD40s No 1606 M6-22-14 SH 1/E20 X107A NO 518 JWTRH C1038 BFD40S 1607 M6-22-14 SH 2/E18 X1078 NO No 519 JWTRH C1048 ES S01 DG B 27 0" West g.c,use Unned Etoctre Control Type'C11 Model102 520 JWTSH X107A ES SO4 DG A 27 0" 1606 M6-22-14 SH 1420 X107A United Electric C.;c Type C11 Model102 521 JWTSH X1078 ES SO4 DGB 27 0" 1609 M6-22-14 SH 2/E18 X1078 MD101 1610 E40E7 A509 NC No C1Of ES OL2 DG A 27 0" W :rg.c.use 1611 M6 46-6 SH 1/E4 X107A-ER NO/NC No 522 K1 MOtot 1612 E40T7 A609 NC No C102 ES OL2 DGB 27 &

W ; p.c.aoe 1613 M6 46-6 SH 2/E4 X1078-ER NO/NC No 523 K1 524 M2 C101 ES OL2 DGA 27 0" W ;. e.;;::

M0120 1614 MtM64 SH ttE4 X107A-ER NO Nr 525 K2 C102 ES OL2 DG B 27 F W ;- e.c; Joe MDt20 1615 MS-46-6 SH 2/E4 XtO78 ER NO,,

No, _

526 K3 C101 ES OL2 DGA 2J(T Potter & Brum6 eld PR11AY 1616 M6466 SH 1/E4 Xt07A-ER NC No 527 K3 C102 ES OL2 DG B 270" Potter & Bet.." f PR11AY 1617 MS 46-6 SH 2/E4 X1078-ER NC No C101 ES OL2 DGA 270" Polter & Brumfleid PR1t DY 1618 M6-22-14 SH 1/E20 A509 NO/NC No 528 K4 1619 M6 46-6 SH 1/E4 X107A-ER NO/NC No 529 K4 C102 ES OL2 DG B 27 r Poner & Brumnold PR11DY 1620 M6-22-14 SH 2/E21 A609 NO/NC No 1621 MEM6-6 SH 2/E4 X107B-ER NOINC No 530 MWR C1038 ES 501 DGA 27 F West G.c/ Joe BFD30S atta/H Rev. E0 Page: 6Sof 77

contact states Centact Store E..

,:2A Pilgrim Nuclear Power Stadon Essendal Relay Contacts MoneyD 9enet Noten SAT SQBaele BMg Enevanon Mornstecturer Moder Nuneeber schemenc Numeer Equd> JO tNtMwC)

(YeeMe) 1622 M6 22-14 SH 1E20 SV4569A NO No s.

w = w.w.-

1623 M6-22-14 SH 1E20 SV4570A NO No s.

w 1624 M6-22-14 SH 1/E20 SV4587A NO No s-,=.=,

1625 MS-22-14 SH.1E20 SV45878 NO No s_

=

531 KWR C1048 ES SQ1 DG B 27 0" W- :.;+h BFD30S 1626 M6-22-14 SH 2E18 SV45699 NO No 1627 M6-22-14 SH 2E18 SV45709 NO No 1628 M6-22-14 SH.2E18 SV4589A NO No 1629 M6-22-14 SH 2E18 SV45898 NO No 532 KWS C101 ES SO1 DGA 27 0" Agnetet 2412PD 1630 M6-22-14 SH.1E20 SV4569A 1631 M6-22-14 SH 1E20 SV4570A 1632 M6-22-14 SH TE20 SV4587A 1633 M6-22-14 SH TE20 SV4587B 533 KWS C102 ES SO1 DGB 27C*

Ageotet 2412PD 1634 M6-22-14 SH 2E18 SV45698 1635 M6-22-14 SH.2E18 SV45708 1636 M6-22-14 SH.2E18 SV4589A 1637 M6-22-14 SH.2E18 SV45898 534 KWT C1038 ES SQ1 DGA 270" Agnetet 2412PD 1638 M6-22-14 SH.1/E20 SV4569A NC No 1639 M6-22-14 SH.1E20 SV4570A NC No 1640 M6-22-14 SH.1E20 SV4587A NC No 1641 M6-22-14 SH.1E20 SV4567B NC No i

535 KWT C1048 ES SO1 DGB 27 0*

Ageotet 2412PO 1642 M6-22-14 SH 2E18 SV45696 NC No 1643 M6-22-14 SH 2E18 SV45708 NC No 1644 M6-22-14 SH 2E18 SV4589A NC No 1645 M6-22-14 SH 2E18 SV4589B NC No 536 KXA-XX-XX C905 4.11 ES Ott RW 37 0" TBD ToBeC -.4 4 1646 M1V17-4/E0 FCV302-120 NO No 1647 M1V17-4/E0 FCV302-123 NO No 1648 M1V17-4/E0 SV305-121 NO No I

1649 M1V17-4/E0 SV305-122 NO No 9/18/98 Rev.E0 Pope: 66 el77 l.

I

contact states cone.cc sces. En.rerr d Pilgrim Nuclear Power Station Essential Relay Contacts schemeen Number Equip C lNONC)

(YeaNo) c Reney JD Penet Notes SAT SQ Basis Bldg Elevadon Manuf>cturer ModelNumber 537 LO D33 ES OL2 TB 270" Automate Swech Co 24A120 1650 E53*Et D32 NO Yes 1651 ES34/E1 0 33 NO Yes 536 LO Y10 ES OL1 RW 27 r Automate Swtch Co To8eDet=...i-4 1652 E45A-6-5/E1 Y10 NOiNC No 539 LO Y11 ES OL1 TB 270" Automatic Swech Co To8eDet

..a W 1653 E168-1-3 Y11 NO/NC No 540 LO Y12 ES OL1 RW 27 r Automatic Swuch Co ToBeDet

..a d

1654 E168-2-3 Y12 NO No 541 LOLR C1038 ES SQt DG A 27 0" Westinghouse BF20F 1655 M6-22-14 SH 1E20 X107A NO No 542 LOLR C1048 ES SQt DG B 27 r Westinghouse BF20F 1656 M6-22-14 SH 2E18 X1078 NO No 543 LOLS X107A ES SO4 DG A 270" GEMS LS-1800 1657 M6-20-9 SH.1E9 X107A 544 LOLS X1078 ES SO4 DG B 27 0" GEMS LS-1800 1658 M6-2D-9 SH 2/E9 X1078 545 LOTRH C1038 ES SO1 DG A 27 0" Westinghouse BFD30S 1659 M6-22-14 SH.1E20 X107A NO No 546 LOTRH C104B ES SQt DG B 27 0" Westin-/euse BFD30S 1660 M6-22-14 SH 2/E18 X1078 NO No 547 LOTSH X107A ES SO4 DGA 270" UrWed EEtf.c Control Type C100 Model 120 1661 M6-22-14 SH.1E20 X107A 548 LOTSH X107B ES SO4 DG B 270" United Electric Co.M Type C100 Model 120 1662 MS-22-14 SH 2E18 X1078 549 OCR C103B ES 301 DGA 27 7 West 6.v. ease BF030S t

1663 M6-22-14 SH.1E20 X107A NO No 550 OCR C1048 ES SQ1 DG B 27 0" Ww n.v.euse BFD30S t

1664 MS-22-14 SH.2E18 X1078 NO No 551 OCT1 C1038 ES SO1 DG A 27 0" Agastat 2412PD 1665 M6-22-14 SH.1E20 X107A NO No 552 OCT1 C1048 ES SQt DGB 27 0' Agostat 2412PD 9/1&98 Rev EO

~

Page: 67of TT

- - - ^ - - - - - __ _,_

contact states cearece seere ene wred sem Nunser gme p,s;,q gyeomey Pilgrim Nuclear Power Sistion Essential Relay Contacts Ronny 80 renet Notes SAT SO 8eele BMg Eceveepen hennenneturer needet Numser 1666 M6-22-14 SH 2E18 X1078 NO No 2412PD ES SQ1 OG A 27 0-Agentet 1667 M6-22-14 SH 1/E20 X107A NO No n-*-==-

^

C1038

$53 OCT2 2412PD No ES S01 OG 8 27 r Ageslot 1668 M6-22-14 SH 2/E18 X1078 NO 554 OCT2 C1048 BFD30S ES S01 DG A 270" Wested.e.;;;

1869 M6-22-14 SH 1E20 X107A NO No C1038 555 OPR1 BF030S C1048 ES 501 OGB 27 0*

Westig.suse 1670 M6-2214 SH 2/Ets X1078 NO No 556 OPR1 557 OPS 1 C103C ES OL2 DGA 270" UrmedElectr6cC re: Type J6 1156 1671 M6-22-14 SH ttE20 X107A UrWed Electre Control Type J6-1156 1672 M6-22-14 SH 2/E18 X1078 C104C ES OL2 OG8 27 7 558 OPS 1 559 OPS 2 C103C ES OL2 OG A 270" Urmed Electre C.e : Type J6 - 1156 1673 M6-22-14 SH 1E20 Xt07A tJrwted Electric Contres Type J6 - 1156 C104C ES OL2 OG B 270" 1674 M6-22-14 SH 2E18 X1078 580 OPS 2 241290 1675 M6-22-14 SH 1/E20 X107A NO No 561 OPT 1 C1038 ES SQt DG A 27 0-Agentet 2412PD 562 OPT 1 C1048 ES 501 DG B 270"

?7*et 1676 M6-22-14 SH 2E18 X1078 NO No 2412PD 1677 M6-22-14 SH 1/E20 X107A NO No 563 OPT 2 C1038 ES SQ1 DGA 270" Agostet 2412PD 564 OPT 2 C1048 ES 301 OG 8 27 0" Ageotet 1678 M6-22-14 SH 2/E18 X1078 NO No 565 OSR C1038 ES SQ1 DG A 27 0" W.e g.sase BF030S 1679 M6-22-14 SH tie 20 X107A NO No 566 OSR C1048 ES SO1 DG 8 270" West g.; Joe BFD30S 1660 M6-22-14 SH 2/E18 X1078 NO No P/N 2362113 567 OSS X107A ES SO4 OG A 270" ALCO 1681 M6-2214 SH ttE20 X107A PIN 2362113 568 OSS X1078 ES SO4 DG8 27 0' ALCO 9/ft/94 Rev. EO Page: 60 of 77

contact States cemece scene en.wiev Pilgrim Nuclear Power Station Essential Relay Corttects schemenc Nunser EM D PeONC)

(YeeMeep Meier o Panet Noree SAT so asess sMg Elevedon Manutecturer Model Nunsber 1682 M6-22-14 SH 2/E18 X1078 569 P8 Y12 ES OL1 RW 23'0" Autometc Switch Co ToBeDetc...e4 s.

=., w 1683 E168-2-3 Y12 6TA-BB45-NX-C1 A-JJTTX12 570 PS1001-93A LOCAL ES SQ3 RB

-1T 6" State-O-Ring 1684 M1H7-12/E18 SV203-3A NO No 1685 M1H7-12/E18 SV203-38 NO No 1686 M1H712/E18 SV203-3C NO No 1687 M1H7-12/E18 SV203-3D NO No 6TA-BB45-NX-C1A-JJTTXt2 571 PS1001-938 LOCAL ES SQ3 RB

-17 6" Stetz-O-Rang 1688 M1H9-12/E17 SV203-3A NO No 1689 M1H9-12/E17 SV203-38 NO No 1690 M1H9-12/E17 SV203-3C NO No 1691 M1H9-12/E17 SV203-3D NO No 572 PS1001-93C LOCAL ES SQ3 RB

-17 6" Steac O-Rhg 6TA-BB45-NX-C1 A-JJTTX12 1692 M1H7-12/E18 SV203-3A NO No 1693 M1H7-12E18 SV203-38 NO No 1694 M1H7-12/E18 SV203 3C NO No 1695 M1H712/E18 SV203-30 NO No 6TA-BB45-NX-C1 A-JJTTX12 573 PS1001-930 LOCAL ES SO3 RB

-17 6" Stenc-O-Reg 1696 M1H9-12/E17 SV203-3A NO No 1697 M1H9-12/E17 SV203-3B NO No 1698 M1H9-12/E17 SV203-3C NO No 1699 M1H9-12/E17 SV203-30 NO No 45N6-B118-NX-C1 A JJTTX13 574 PS1300-21A LOCAL ES 503 RS

-17 6" State-O-Ring 1700 M1G12-12/E11 SV1301-1 575 PS1380-9C C22578 4

ES OL2 RB

-17 6" Berksdale PlH-M85SSV 1701 M1G12-12/E11 MO1301-16 1702 M1G12-12/E11 M0130117 1703 M1G12-12/E11 SV1301-1 576 PS1380-90 C22578 4

ES OL2 RB

-17 6*

Barksdale PtH-M85SSV 1704 M1G12-12/E11 M01301 16 1705 M1G12-12/E11 MO1301-17 1706 MtG12-12/E11 SV1301 1 9/f&96 Rev.E0 Page: 69 of 77 l

.4 contact states coneset seste Enerytted Pilgrim Nuclear FOwa,-Station Essential Relay Contacts Reasy D Panel Notee SAT SQBasis Bldg Elevadon ^^ :: e--;

A9odelNumber scheme 0c Number Equep D peopec) gYespeo) 6TA-BB4SNX C1 A-JJTTX12 577 PS1464A C2201 ES SQ3 RB

-17 6" State-O-Ring 1707 M1K411E15 SV203-3A NO No 1708 M1K411E15 SV203-38 NO No 1709 M1K4-11E15 SV203-3C NO No 1710 M1K411E15 SV203-30 NO No 6TA-BB45-NX-C1 A-JJTTX12 578 PS14648 C2260 ES SQ3 RB

-17 6" Statt-O-Ring 1711 M1K&t1E15 SV203-3A NO No 1712 M1K4-11E15 SV203-38 NO No 1713 M1K4-11/E15 SV203-3C NO No 1714 M1K4-11E15 SV203-30 NO No 579 PS37 LOCAL ES SO3 TB 51'0" Statte-O-Ring SN6-BBS NX-C1 A4JTTX12 1715 MIN 17-8 PS37 NO No 580 PS38 LOCAL ES SO3 TB 51*0" Static-O-Ring SN6-BB5-NX-C1 A-JJTTX12 1716 M1N164 PS36 NO No SN6-BBS-NX-C1A-JJTTXt2 581 PS39 LOCAL ES SO3 TB 51'0" Static-O Ring 1717 MIN 174 PS39 NO No 582 PS40 LOCAL ES S03 TB 51*0" Static-O-Ring SN6-BBS-NX-C1 A-JJTTX12 1718 M1N184 PS40 NO No 583 PSH2368A C2250A ES OL2 RB

-17 6" Barkedele B2T-M12SS 1719 M1J16-10/E22 SV2300-9 NO No 584 PSH23688 C2250A ES OL2 RB

-17 6" Barksdale B2T-M12SS 1720 M1J16-10/E22 SV2300-9 NO No 585 PSL2380-1 C22508 ES SQ3 RB

-17 6" Static-O-Ring 54TA-BB118-NX-C1 A-JJTTX6 1721 M1J16-10/E22 SV2300 9 NO No 586 RPM X107A ES SO4 DGA 23'0" Sp A Start ToBeC

.4 4 1722 M6-21 11 SH 1/E8 A509 587 RPM X1078 ES SO4 DGB 23'0" Sp a Start ToBeDet...; M 1723 M6-21-11 SH 2/E7 A609 588 SDR C1038 19 ES SQt DG A 23'0" W-. :.#m BFD33S 1724 E40rE7 A509 NO No 1725 M6-22-14 SH 1/E20 X107A NC No X107A-ER NO No 1726 M6-46-6 SH,1/E4_

589 SDR C1048 19 ES SQt DG B 23'0" W-agm 8FD33S 9/f&96 Rev.E0 Page: 70 of 77

h contact states Enerytred Conrect 3 rose sc~ ~ Nunser E% no 9*0n*q (vesneel N

Pilgrim Nuclear Power station Essential Relay Corttacts ModelNumber sar sosesos sidg Ebevedon ;.". h cturer NO Ho A609 1727 E40/E7 t weet noten NC No awaya

^ ~

1728 M6-22-14 SH ?!E18 X1078 1729 "444 SH 2/E4 X1078-ER NO No

, _ - - m. w Automate Sentch Co To8e06..4ad NO/NC Yes 032 a.__

-m..

ES OL1 TS 37 0" 1730 E534/E1 NO!NC Yes D32 D33 590 SE 1731 ES34/Et AG...r; Santch Co To8eG

..;W NO/NC No

[

Y10 1732 E45A-6-5IE1 ES OL1 RW 27 0*

Y10 591 SE AG.,-ac Sintch Co To8eDet...

d NOINC No Y11 1733 E168-1-3 ES Ot1 TB 27 0-Y11 592 SE A6..cc Sudtch Co To8eDet...a d NOINC No Y12 1734 E168-2-3 ES Ott RW 27 0" Y12 593 SE Es SO1 DG A 27 0-Ww.ge=

1735 M6-21-11 SH.1E8 A509 NO No SFD33S S94 SPR 1736 M6-22-14 SH 1E20 SV4569A NC No C1038 1737 M6-22-14 SH 1rE20 SV4570A NC No 1738 M6-22-14 SH.1E20 SV4567A NC No 1739 M6-2214 SH 1E20 SV45878 NC No 8FD33S NO No ES SO1 OG 8 27 F Wdi.F.wse 1740 M6-21-11 SH 2E7 A609 595 SPR 1741 M6-2214 SH 2/E18 SV45898 NC No Ct048 1742 M6-22-14 SH 2E18 SV45708 NC No 1743 M6-22-14 SH 2E18 SV4589A NC No 1744 M6-2214 SH 2!E16 SV45898 NC No 2412PH NO Yes ES SO1 T8 ST F Agostat 1745 E534tE1 D32 506 TD 1746 ES34rEl 0 33 NO Yes D32 i

FSS653 ES OL2 DG A 27 0" TechPak 1747 M6-22-14 SH 1E20 A509 C1038 507 TP 1746 M6-22-14 SH.1E20 SV4569A i

1749 M6-22-14 SH 1E20 SV4570A 1750 M6-2214 SH TE20 SV4567A 1751 hE22-14 SH 1/E20 SV45678 1752 M6-22-14 SH 1tE20 X107A S/1846 Rev. EO repe: 71 of TT

--~

contact states conrect sem twa Pilgfirn Nuclear Power Station Essential Relay Contacts ReneyJD Penet Notes SAT SQ Bests BMg Elevadon Manufacturer ModelNumber schemene Nunser Eso e tNonc) creswe) 1753 M6-21-11 SH 1/E8 X107A-ER s

en w====

596 TP C1048 ES OL2 OGB 27 0" TechPak FSS653 1754 M6-22-14 SH 2/E21 A609 1755 M6-22-14 SH 2/E18 SV45699 1756 M6-22-14 SH 2/E18 SV45708 1757 M6-22-14 SH 2/E18 SV4589A 1758 M6-22-14 SH.2/E18 SV4589B 1759 M6-22-14 SH 2/E18 X107B 1760 M6-21-11 SH 2/E7 X107B-ER 599 TS Y10 ES OL2 RW 270" Automahc Switch Co X906126CL1A 1761 E45A45/E1 Y10 NO/NC No 600 TS Y11 ES OL2 TB 27 0" Automatic Sw!tch Co 906126CL1A 1762 E168-1-3 Y11 NO/NC No 601 TS Y12 ES OL2 RW 27 0" Automatic Swech Co 906126CL1A 1763 E168-2-3 Y12 NO/NC No

+

602 TS-1 D32 ES 012 TB 37 0" AG.c Switch Co 163A195C12 1764 EL34/E1 032 NO/NC No 1765 E534/E1 D73 NO/NC No e03 TS-2 D33 ES OL2 TB 27 0" Automatic SwEch Co 163A195AC12 1766 E534/E1 032 NO/NC No 1767 E534/E1 D33 NO/NC No 804 TS1360-14C JS99 ES SO3 RB 27 0" EGS/Patel 01-170233 490 1768 M1G12-12/E11 Mot 301-16 1769 M1G12-12/E11 MO1301-17 1770 M1G12-12/E11' SV1301-1 605 TS1380-15A J315 ES SQ3 R8

-F F EGStPatel 01-170230 490 1771 M1G12-12/E11 M01301-16 1772 M1G12-12/E11 M01301-17 1773 M1G12-12/E11 SV1301-1 606 TS1360-15C J600 ES SQ3 RB 27 0" EGS/Patet 01-170230 490 1774 M1G12-12/E11 M01301-16 1775 M1G12-12/E11 MO1301-17 1776 M1G12-12/E11 SV1301-1 3/fsst Rev EO Page: 72 of 77

l Contact States co-wtstee E;-,:a Pilgrim Nuclear Power Station Essential Relay Contacts Reney D Penet Notwo SAT SQ Beels BMg EleveUon Monuketurer neodelNumber schemeec Number Ew% 00 (Nowc1 tYesNc3 607 TS1360-16C J599 ES SQ3 RB 77 7 EGS/Patel 01-170230-090 1777 M1G12-12/E11 Mot 301-16 1778 Mf G12-12/E11 M01301-17 1779 M1G12-12E11 SV1301-1 SOS TS1300180 J601 4

ES SQ3 RB 27 0" EGS/Patel 01-1 swuC90 1780 M1G20-9/E8 Moi 301-16 1781 Mf G20-9tE8 MO1301-17 1782 M1G20-9/E8 SV1301-1 909 TS1300-17A J315 ES SQ3 RB

-7 0" EGS/Patel 01-1 (wi>090 1783 M1G12-12E11 MO1301-16 1784 M1G12-12/E11 M01301-17 1785 M1G12-1?JE11 SV1301 1 610 TS1360-17B J317 4

ES SQ3 RB

-7 0" EGS/Patel 01 1702K2490 1786 M1G20-9/E8 Mot 301 16 1787 M1G20-9/E8 MO1301-17 1788 M1G20-9/ES SV1301-1 611 TS1300-17C J600 ES SQ3 RB 27 0" EGS/Patel 01-1tv2 u 090 1789 M1G12-12/E11 M ot301-16 i

1790 M1G12-12/E11 M01301-17 1791 M1G12-12/E11 SV1301-1 612 TS1380-17D J602 4

ES SQ3 RB

-9' r EGS/Patel 01-1702KrO90 1792 M1G20-9/E8 Mot 301-16 1793 mfg 20-9tE8 Mot 301-17 1794 M1G20-9/E8 SV13011 613 TS2370C J603 ES SQ3 RB 27 0" EGS/Patel 01-1 su2KrO90 1795 M1J1510/E16 CV9068A NO No I

1796 M1J1510/E16 CV90688 NO No 1797 M1Jt5-10/E16 M O2301-35 NO No 1796 M1J1510/E16 MO2301-36 NO No 1799 M1J1510rE16 M O2301-4 NO No 1800 M1J1510/E16 MO2301-5 NO No 1801 M1J15-10/E16 SV2300-9 NO No 614 TS23700 J604 ES SQ3 RB 27 7 EGS/Patet 01 170230-090 1802 MlJ16-10/E22 CV9068A NO No 9/f&96 Rev.E0 Page: 73of 77

contact states Conrect Steve enwytred senemooc Number Eowp D skkTM (YeeNel Pilgrim Nuclear Power Statiott Essential Relay Contacts MeanyD Penel Notes SAT SQReels Body Elevadon Manutseturer Neder Number 1803 M1J16-10/E22 CV90688 NO No MO230135 NO No 1804 MtJ1&10rE22 M O2301-36 NO No s-,.

1805 M1J1610/E22 M O2301 4 NO No s

e.

1906 M1J151 ore 22 MO2301-5 NO No s_

r, =

1807 M1J16-10/E22 1806 M1J16-10/E22 SV2300-9 NO No 01-170230-090 1809 M1J1510/E16 CV9068A NO No ES SO3 RB

.17 6-EGS/Palet s_

-,m 1810 M1J1510/E16 CV90689 NO No CIS TS2371 A LOCAL 1811 MtJ1510/E16 MO2301-35 NO No MO2301-36 NO No 1812 MtJ1510/E16 1813 M1J1510/E16 MO23014 NO No 1814 MtJ1510/E16 M O2301-5 NO No 1815 MtJ1510/E16 SV2300-9 NO No 01-170230 490 1816 M1J16-10/E22 CV9068A NO No ES SO3 RB

-tT 6" EGS/F mel 1817 M1J1610/E22 CV90688 NO No 616 TS23715 LOCAL 1818 MtJts-10/E22 MO2301-35 NO No 1819 MtJ1610/E22 MO2301-36 NO No 1820 M1J1610/E22 MO23014 NO No M O 2301-5 NO No 1821 MtJ16-10/E22 1822 M1J1610/E22 SV2300-9 NO No 01-170230-090 1823 M1Jt510/E16 CV9068A NO No ES SQ3 RB 23'0" EGS/Petet 1824 MtJ1510/Et6 CV9068B NO No 6t7 TS2371C J605 1825 M1J15-10/E16 MO2301-35 NO No 1826 M1J1510/E16 MO2301-36 NO No 1827 M1JtS10sE16 M O2301 4 NO No 1828 M1J15-10/E16 MO2301-5 PO No 1829 M1J15-10/E16 SV2300-9 NO No 01-170230 490 1830 M1J16-10/E22 CV9068A NO No 618 TS237tD J606 ES SO3 RB 27 0" EGS/Patet 18J1 MfJ1610tE22 CV90688 NO No 1832 M1J16-10rE22 MO233135 NO No 1833 M1J16-10/E22 MO2301-36 NO No 9/tSS8 Rev. E0 Page: 74 e9 77

contect states contece store t w ersee screemerse Numse em o engr +q (Yeamet Pilgrim Nuclear Power Station Esserttial Relay Contacts Moey D Penet nonee SAT sQ: sets BMg Swenen ntemhca -

neodelNunser 1834 M1J16-10fE22 MO23014 NO No MO23015 NO No 1835 M1J1610/E22 No 1836 M1J1610/E22 SV2300 9 NO 2412PD ES SQ1 L.

A 27 7 Agostet 1837 M6-22-14 SH 1/E20 SV4569A NC No n., _ _

Q19 TVT1 C103B 1838 M6-22-14 SH 1/E20 SV45678 NC No 2412PD 620 TVTt C1048 ES SQt DG B 27 0" Agostet 1839 M6-22-14 SH 2/E18 SV45698 NC No 1840 M6-22-14 SH 2E18 SV45898 NC No 2412PD 821 TVT2 C1038 ES S01 DG A 270" Agostet 1841 M6-22-14 SH.1/E20 SV4570A NC No 1842 M6-22-14 SH 1!E20 SV4567A NC No 2412PD 622 TVT2 C1048 ES S01 DGB 27 0" Agostat 1843 M6-22-14 SH 2/E18 SV45708 NC No 1844 M6-22-14 SH 2/E18 SV4589A NC No l

sisame Rev. E0 Pere: 15 otit i

Notes for PNPS Essential Relay List nere m ner. r.n Contact chatter is acceptable because the component is not required to operate until after the earthquake t

Contact chatter is acceptable because there is another contact en senes that is not vulnerable to chat er.

01 Contact chatter is acceptable because there is another contact in senes that is seismicatty adequate 02 ll adequate Other contacts were designated chatter acceptable (CA) because of this contact being considered seismtca y 03 Contact chatter is acceptable because it will not change the state of the equipment.

04 d reset.

Contact chatter could cause an starm in the control room which would require operator action to acknowled 05 Contact chatter is acceptable because et will change the position of the component to the required state f the contactors is bemg considered essential 06 Simultaneous chatter of the motor contactors may have an adverse effect on the equipment, therefore one o 07 Contact chatter is acceptable because it will not prevent the component from changing state on demand have any adversi effect on the safe shutdown 08 The component is not required to operate until after the earthquake Spurious actuation of component will not 09 This contact is typical for 145 catrol rods. For rod identification see drawing M1V10-4 10 lt ts cycle Contact chatter is acceptable because chatter will not energize the time delay relay tong enough for the 11 t l Contact chatter could seat in the control circutt, If this occurs operator action would be required to reset the 12 t at panel C903 usmg the LPCI loop select 13 logte reset pushbutton (10A-S1A) Contact chatter could seal in the control circust. If this occurs oper t l logic reset pushbutton (10A-S18).

li t at panel C903 usmg the contamment 14 Contact chatter could seal in the control circuit. If this occurs operator action would be required to reset t li it at panel C903 usmg the contamment 15 spray signal reset pushbutton (16A-S33A)

Contact chatter could seal in the control circurt. If this occurs operator action would be required to teset the con t at panel C905 using the isolation vatve 16 sprey signal reset pushbutton (16A-S338)

Contact chatter could seat in the control circuit. If this occurs operator action would be required to reset th i

reset switch (16A-S33).

h ld not have an adverse effect on the 17 Contact chatter could inp a running pump. If this occurs a pump would start automaticatty on low header pressu 18 D These relays are considered essentraf Addrtional relays associated with this relay are evaluated and included under the correspondirig diesel equipment safe shutdown.

Contact chatter could momenterify open the cercuit. This would not have an adverse effect on the safe shutdown BH. This ref ay directly controls operatron of 19 152Y is the anti-pump relay supplied with the General Electnc Magne-Blast Circurt Breaker Model No AM-4.t6-250-20 21 the switchgeer and does not control other plant equipment Solid state relay per Power Systems Drvision walkdown and Vendor Manual V0366 22 sna.se Rev.E0 Pe9e: 76 of17

Notes for PNPS EssentialRelay Ust me.m nr. r.<t This relay directly controts operation of the breaker and does not control other 52X is the closing relay for GE Power Circuit Breaker AK-2A-25-1 or AK-2A-50-1 23 The valve plant equipment Contact chatter could momentanly cause the valve to change posstron t of the Honeyweti controffer which Relay is not seismically fragite and will be functional after the seismic eventstroke time is 30 seconds l

24 uses actual valve position as input. and would return valve to Ws original position followmg the event.

Contact chatter could momentarily cause a change of state. This would not have an adverse effect on the safe shutdow d

  • Low ruggedness relay listed in Appendix E to EPRI NP-7148. Operator ac. ion to reset trip of the RCIC turbine will b 25 26 P

snase Rev. to Pere: ilet 17

ATTACHMENT 2 OUTLIER RELAYS

" OUTLIERS" l

UST OF OUTLIERS - OL1 l

Relav ID PancLNufntxtr Manufacturer Model Number Potential Resolution Method 3A Y11 CT TBD S

AR D33 ASC TBD S

KXA-XX XX C905 TBD TBD S

LO Y10 ASC TBD S

LO Y11 ASC TBD S

LO Y12 ASC TBD S

PB Y12 ASC TBD S

SE Y10 ASC TBD S

SE Y11 ASC TBD S

SE Y12 ASC TBD S

SE D32 ASC TBD S

Total Number of OL1 Relavs=11 Leaend OL1= Relay an outlier. Relay make and/or model number unknown CT = Cramer Timer ASC = Automatic Switch Company POTENTIAL RESOLUTION METHOD S=

Outlier relays to be verified by REVIEW AND COMPARISON with similar rugged components.

C=

Outlier relays to be verified by CIRCulT ANALYSIS.

..m.:_

a.s

_a-L

---u

" OUTLIERS" l

LIST OF OUTLIERS - OL2

]

Relav ID.

PanelNo Manufacturer Model Number Potential Resolution Method 127-504/1 A504 GE 121AV53B1A S

127-604/1 A604 GE 121AV5381A S

151-4A C5 W

CO-8 S

i 1514C C5 W

C O-8 S

151-501B A501 GE 121 AC77A12A S

151-601 A A601 GE 121 AC77A12A S

152Y A501 GE AM-4.16-250-8H S

152Y A504 GE AM-4.16-250-8H S

152Y A509 GE AM-4.16-250-8H S

152Y A602 GE

~ AM-4.16-250-8H S

152Y A605 GE AM-4.16-250-8H S

151-601C A601 GE 121AC77A12A S

l 159-609/1 C102 GE SV S

159-609/2 C102 GE SV S

187-4B C5 W

HU-1 C

187N-4 C5 W

CWC C

1V Y10 ASC 214B120 S

i 1V Y12 ASC 214A69 S

3A-K32-XX-XX C928 GE CR120K C

42X-781/0 D781 CH PN9575H2018A ", ce 626 S

42X-964/C D964 CH PN9575H2018A fype 626 S

52X B102 GE AK-2A-50-1 S

52X B310 GE AK-2A-25-1 S

52X B601 GE AK-2A-50-1 S

52X B605 GE AK-2A-25-1 S

}

SA-K53A C2228-A1 Agastat GPBN S

SA-K53C C2228-A2 Agastat GPBN S

SA-K74A C2228-A1 Agastal GPBN S

SA-K74C C2228-A1 Agastat GPBN S

DCFC C102 W

MD101 S

K1 C102 W

MD101 S

K2 C102 W

MD120 S

K3 C102 PB PR11 AY S

K4 C102 PB PR11DY S

1 OPS 1 C103C UEC Type J6-1156 S

i OPS 2 C103C UEC Type J6-1156 S

PS1360-9C C2257B Barksdale PlH-M85SSV S

PSH2368A C2250A Barksdale B2T-M12SS S

TP C103B Tach Pak FSS653 S

TS Y10 ASC X906126CL1A S

I TS Y12 ASC X906126CL1A S

TS-2 D33 ASC 163A195C12 S

1 Leoend OL2 = Relay an outlier. Relay seismic capacity unknown. GE = General Electric W = Westinghouse ASC = Automatic Switch Company CH = Cutler Hammer PM = Paxton Mitchell UEC = United Electric Control PB = Potter & Brumfield RS = Robert Shaw MM = McDonnell and Miller W

POTENTIAL RESOLUTION METHOD S=

Outlier relays to be verified by REVIEW AND COMPARISON with similar rugged components.

Co Outlier relays to be verified by CIRCUlT ANALYSIS.

" OUTLIERS" l

LIST OF OUTLIERS - OL2 l

Relay ID Ea_nelNo Manufacturer Model Number Potential Resolution Method m

127-504/2 A504 GE 121AV53B1A S

127-604/2 A604 GE 121AV53B1A S

151-4B C5 W

CO-8 S

151-501 A A501 GE 121AC77A12A S

151-501C A501 GE 12 TAC 77A12A S

151-601B A601 GE 12lAC77A12A S

152Y A502 GE AM-4.16-250-8H S

152Y A505 GE AM-4.16-250-8H S

152Y A601 GE AM-4.16-250-8H S

152Y A604 GE AM-4.16-250-8H S

152Y A609 GE AM-4.16-250-8H S

159-509/1 C101 GE SV S

159-509/2 C101 GE SV S

187-4A C5 W

HU-1 C

187-4C C5 W

HU-1 C

1V D32 ASC 214A120 S

1V Y11 ASC 214B69 S

27-B2Z2 B2 GE 12HFA65062H S

42X-771/C D771 CH PN9575H2018A Type S

626 42X-941/0 D941 CH PN9575H2018A Type S

626 52X B202 GE AK-2A-50-1 S

52X B410 GE AK-2A-25-1 S

52X B602 GE AK-2A-50-1 S

52X B606 GE AK-2A-25-1 S

SA-K53B C2229-B1 Agastat GPBN S

SA-K53D C2229-B2 Agastat GPBN S

5A-K74B C2229-B1 Agastat GPBN S

SA-K74D C2229-B2 Agastat GPBN S

DCFC C101 W

MD101 S

K1 C101 W

MD101 S

K2 C101 W

MD120 S

K3 C101 PB PR11 AY S

K4 C101 PB PR11DY S

LO D33 ASC 24A/120 S

OPS 1 C104C UEC Type J6-1156 S

OPS 2 C104C UEC Type J6-1156 S

PS1360-9D C2257B Barksdale PlH-M85SSV C

PSH2368B C2250A Barksdale B2T-M12SS C

TP C104B Tach Pak FSS653 S

TS Y11 ASC X906126CL1A S

TS-1 D32 ASC 163A195C12 S

105E C6 GE HFA54J S

105F C6 GE HFAS4J S

187-509 A509 W

SA-1 S

187-609 A609 W

SA-1 S

132-509 C101 W

CRN-1 C

132-609 C102 W

CRN-1 C

Total Number of OL2 Relays = 89 l

POTENTIAL RESOLUTION METHOD l

S=

Outlier relays to be verified by REVIEW AND COMPARISON with similar rugged components.

C=

Outlier relays to be verified by CIRCUIT ANALYSIS.

i I

\\

" OUTLIERS" LIST OF OUTLIERS - OL3 Relav ID Panet Number Manufacturer Model Number Potential Resolution Method 103A C6 GE 12HFA151A2F C

1038 C6 GE 12HFA151A2F C

127-504X A504 GE 12HFA151A2H C

127-604X A604 GE 12HFA151A2H C

27 B1X B6 GE 12HFA151A2H C

27-B1Z B1 GE 12HFA151 A2H C

27-B2X2 B6 GE 12HFA151A2H C

Total Number of OL3 Relays = 7 Leaend OL3 = Relay an outlier. Relay seismic capacity less than seismic demand

)

GE = General Electric 1

LIST OF OUTLIERS -OL4 Relav ID Panel Number Manufacturer Model Number Potential Resolution Method DCFT1 C101 A

241PD C

l DCFT2 C103B A

241PD C

1 DCFT2 C104B A

241PD C

Total Number of OLS Relavs = 3 Leoend OL4 = Relay an outlier. Time delay pickup outside the normal timing range A = Agastat i

POTENTIAL RESOLUTION METHOD S=

Outlier relays to be verified by REVIEW AND COMPARISON with similar rugged components.

C=

Outlier relays to be verified by CIRCUlf ANALYSIS.

~

~

  • m-

.*da e

e

.p,e-_

4m am.,,

ATTACHMENT 3 SAFETY IMPLICATION OF OUTLIER RELAYS e

9

ATTACHMENT 3 SAFETY IMPLICATION OF OUTLIER RELAYS This section contains an assessment of the safety implications of the cuant population of oulier relays.

Part il,' Section 5, of the GIP (Rev. 2A) defines an ' outlier" as 'an item of equipment which does not comply with all the screening guidelines provided in this Generic implementation Procedure (GIP)."

Outliers, of course, can be resolved under the guidance of the GIP. When an outlier cannot be resolved using this guidance, it is considered an " unresolved outlier".

At the time of this report, there are no " unresolved' outlier relays. There are outliers for which the GlP resolution process has yet to be completed.

The relays are grouped by equipment category. The table lists associated equipment, the function of the equipment, the outtler concem, a basis for why an operability concem does not exist, and the expected resolution.

1 i

Compensatory Measures / Conditions Recommended: In synopsis, the following systems are credited in the safe shutdown paths. A summary of system status is noted while individual 1

components and concerns are addressed in the following pages:

Reactivity Control RPS/CRDM Pressure Control S/RVs No OL's HPCI No OL's RCIC Credit Operator Action (OA), Reset system, swap suction path RHR No OL's inventory Control HPCI RCIC Credit OA, Reset system, swap sudion path CSA/B Decay Heat Removal RHR RBCCW SSW EDGs Support Systems H&V Elect. Dist.

  • = No required actions, resolve outliers (OL) in accordance with GlP.

4 W

Cateaory Eautoment ID Function Concern Transfer Switches D32/33, Y10,11,12 Power seeking transfer

. Transfer switches are switches that M220 rugged, but intemal LOOP, with failure of relays (ASCO) have preferred source, would been identified as automatically connect a outliers due to secondary source to the documentation lacking.

l vital / instrument AC or

. Operator action would l

attemating DC controls.

be required to diagnose l

and provide switching.

Operability Concem: 0 YES @ NO Basis: Further review IAW GIP is expected to demonstrate qualification under " Rule Of the Box" and l

GERs for Automatic Transfer Switches.

1 Cateoory g_quipment ID Function Concern EDG H&V Dampers SVL22,23 Open dampers allowing

.Present relay review air inlet to EDGs while identified outlier relay running for combustion due to demaad and cooling.

exceeding capacity.

. LOOP results in loss of air, dampers fall open.

.Even if relay fails, the only affect would be the damper opening from loss of air, the resulting time delay would have an inconsequential effect on ambient air temperature.

Combustion would not j

be affected.

.E422, M6-2214 Operability Concem: 0YES @ NO Basis: Review of circuit identified qualifiable relay in circuit that would open dampers upon initiation.

l l

l 2-

1 l

Catenory Eauloment ID Function Concern EDGs X107A/B Upon loss of offsite

.EDG protedive power, recognize sensors / relays are condition and provide outliers due to GERs power to Safety Busses data not being A5/A6.

available and circuit under review would require operator adion to reset prior to EDG providing power to bus.

. Time delay and operator distraction would have to be addressed.

Operability Concem: O YES S NO Basis: Review identified attemate circuit (LOOP) with qualifiable switch that would provide EDG power to bus without operator adion.

l Catenorv Eauloment ID Function Concern Exciter Regulator For X107A/B-ER The EDG exciter

.Present relay review EDG regulator provides and identified outliers controls valtage at whose qualification is generator terminals to unknown.

allow load changes

.Should relay fail, within limitation / design operator adion would j

of equipment being be required.

supplied.

aPresent procedures i

recognize and provide i

diredion for failure.

i Operability Concem: O YES S NO Basis: Review is expected that O.L. relays are defacto contadors (Ref. GERs CON.3) whose capacity j

exceeds demand.

Catenory Eauloment ID Function Concern RMCS Solenoids FCV302120, Provide pressure

. Seismic capacity data

121, boundary at HCU during is not available for
122, scram such that AP is relay Model 123 available at CRD piston CR120K24002AB, and SDV headeris not while system prematurely filled.

descriptions from vendor credit system boundary integrity and Inability by design for RMCS to degrade RPS function.

Operability Concem: 0 YES S NO Basis: CR120K Relays are seismically rugged; documentation to that effect is being pursued.

4

1 Catenory Eautoment ID Function Concern 4160V Breaker A504, A604 4160V Breaker which

. Circuit Breakeris connects the Startup seismically rugged.

Transformer to the

.The seismic AS/A6 Bus.

qualification of the differential overcurrent relay is unknown.

.The seismic qualification of the differential ground current relay is unknown.

.The seismic qualification of the i

overcurrent relayis unknown.

{

.Fallure of these relays could cause a lockout i

of the Startup i

Transformer, i

. Operator action would be required to manually reset the lockout relay.

l

.The undervoltage relay is classified as an l

outlier, i

Operability Concem: 0 YES S NO I

^

Basis: Should relays fail, the S/U Transformer would not supply power to A5/A6, the EDG would.

Operator action would be needed to restore the S/U as the source; this would not affect any of the credited shutdown paths. Furthermore, it is expected review will qualify relays under GERS for medium j

voltage switchgear (LVS/MVS.7).

Catenorv Eauipment ID Function Concern 4160V Breaker A505,A605 4160V Breaker which

. Circuit breakeris connects Unit Auxiliary seismically rugged.

Transformerto the

.There are outlier relays AS/A6 Bus.

In 'he control circuit.

Operability Concem: 0YES S NO j

Basis: Review of circuit; outlier contacts are expected to be seismically qualified by Switchgear GERS MVS/LVS.7.

j l

d Cateaory Eauipment ID Function Concern 4160V Breaker A501, A601 4160V Breaker which

. Circuit breaker is connects Shutdown seismically rugged.

Transformer to the

.There are outlier relays AS/A6 Bus.

In the control circuit.

Operability Concem: 0 YES @ NO Basis: Review of circuit; outiler couacts required to prevent unacceptable action are expected to be seL9nically qualifiable by Switchgear GERS MVS/LVS 7.

4 i

=

Cateaory Eauloment ID Function Concern 4160V Breaker A502,A602 4160V Breaker which eCircuit breaker is provides power to the seismically rugged.

Control Rod Drive

.There are outlier relays Pump.

In the control circuit.

4 Operability Concem: 0 YES @ NO Basis: Review of control circult; outlier contacts required to prevent unacceptable action are expected to be seismically qualifiable by Switchgear GERS MVS/LVS.7.

Cateaory Eauloment ID Function Concern 4160V Breaker A509,A609 4160V Breaker which

. Circuit Breaker is connects the Diesel seismically rugged.

Generator to the AS/A6

.The protective relays Bus.

are classified as outliers.

. Operator action to restart the Diesel Generatoris available l

should relays fall.

Operability Concem: 0 YES @ NO Basis: Initial review has identified OL's due to qualification documentation lacking for specific relays.

Further review IAW GIP is expected to demonstrate qualification by similarity, use of contactor GERS i

CON.3, application of " Rule Of the Box" with GERS MVS/LVS.7, and analysis considering chatter acceptable.

-S-

\\

Catenom Eauloment ID Function Concern 480V Breaker B601,B602,102,202, 480V Breaker which

. Circuit breeker is 310,410 connects and/or isolates seismically rugged.

safety busses.

. Outlier relays in the l

breaker control circuit.

l Operability Concem: O YES S NO l

Basis: Review of control circult; all contacts required to prevent unacceptable adion are expected to be telsmically qualifiable by Switchgear GERS MVS/LVS,7, l

l

)

J CatenoN Eauloment ID Function Concern Drywell Cooler Fans VAC205A-1 Provide drywell

. Outlier relay in control VAC205B 1 environmental cooling.

circuit.

VAC205C-1

. Operator adion to VAC2050-1 restart the drywell VAC205E-1 cooler fans may be VAC205F 1 required should these VAC206A-1 relays fail.

VAC2068-1 VAC205A-2 VAC205B 2 VAC205C-2 VAC205D-2 VAC205E-2 VAC205F-2 VAC206A-2 VAC2068-1 Operability Concem: 0 YES S NO Basis: HFAS4J Relays are seismically rugged; documentation to this effed is being pursued.

i i

i d

3 i

j 1

i j

i t

i i

4 2

ATTACHMENT 4 I

RECORD OF ESSENTIAL RELAY WALKDOWN FOR USI A-46 PROJECT 1

l i

e

l RECORD OF ESSENTIAL RELAY WALKDOWN FOR USI A46 PROJECT A walkdown of ninety (90) relays on Essendal Relay List was performed on March 15,1996, in support o USI A 46 Project Ninety different relays housed in five different panels located in Control Room (

Spreading Room (2) and 'A' Diesel Generator Room (1), were looked at with regards to:

(1)

Confirmation of make and model number of the relays; and, (2)

Adequacy of relay mounting within the panel.

A summary of the walkdown is attached. No anomalies were found.

Walkdown Team:

I 3 NIN Subhash C. Chugh l

D 3

>7 fj Paul D. Smith

-~

v

%'N%\\a%

Denise T. Thomas 22 SCCh*/9661

SUMMARY

OF RELAY WALKDOWN FOR USl A46 PROJECT Panel Number: C1038 Panet Name: DG 'A' Diesel Engine Control MAKE/MODEL RELAY NUMBER MOUNTING MAKE/MODEL VERIFIED &

VERIFIED &

RELAYID NUMBER OK.(Y/N)

O K. (Y/N)

COMMENTS CKVR WlBFD 30S Y

Y CR1 WlBFD 20S Y

Y CR2 WlBFD 20S Y

Y DCFT2 Al2412 PD Y

Y EMSR WlBFD 66S Y

Y ESR1 WlBFD 84S Y

Y ESR 2 WlBFD 84S Y

Y ESR 3 N7022 PB i

Y JWPR1 WlBFD 71S Y

Y JWPR2 W/BFD 71S Y

Y JWTRH WIBFD 40S Y

Y KWR WIBFD 30S Y

Y KWT N2412 PD Y

Y LOLR WlBF 20F Y

Y LOTHR WlBFD 30S Y

Y OCR WlBFD 30S Y

Y OCT1 N2412 PD Y

Y OCT 2 N2412 PD Y

Y OPR1 W/BFD 30S Y

Y OPT 1 N2412 PD Y

Y OPT 2 N2412 PD Y

Y OSR WlBFD 30S Y

Y SDR WlBFD 33S Y

Y SPR WIBFD 33S Y

Y TP T/FSS 653 Y

Y TVT1 N2412 PD Y

Y TVT2 N2412 PD Y

Y

~

Legend W = Westinghouse A= Agastat T = TachPak SCC /hk/9661

SUMMARY

OF RELAY WALKDOWN FOR USI A 46 PROJECT PanelNumber: C6 1

Panel Name: Load Shedding Panel MAKE/MODEL RELAY NUMBER MOUNTING MAKE/MODEL VERIFIED &

VERIFIED &

RELAY 10 NUMBER O.K.(Y/N) 0.K.(Y/N)

COMMENTS 103A GE/12HFA151A2F Y

Y 1038 GE/12HFA151A2F Y

Y 103C GE/12HFA151A2F Y

Y 103D GE/12HFA151A2F Y

Y j

104E GE/12HFA151A2F Y

Y 104F GE/12HFA151A2F Y

Y 104G GE/12HFA151A2F Y

Y 62-104A N2412 PBL Y

Y 62-104B Al2412 PBL Y

Y l

Legend GE = General Eiectric A = Agastat a

l SCC /hk/9661

SUMMARY

OF RELAYWALKDOWN FOR USI A 46 PROJECT Panel Number: C917 Panel Name: Channel B Primary isolation and Rx Protection MAKEMODEL RELAY NUMBER MOUNTING MAKEM00EL VERIFIED &

VERIFIED &

j RELAYID NUMBER OK.(Y/N)

OK.(YlN)

COMMENTS

)

i 5A-K148 GE/CR10501 Y

Y SA-K140 GE/CR105D1 Y

Y

]

SA K14F GE/CR105 Y

Y 5A-K14H GE/CR105 Y

Y 5A-K158 GE/CR10501 Y

Y l

5A K150 GE/CR105 Y

Y l

5A-K19B GE/12HFA151A2F Y

Y 5A-K190 GE/12HFAiS1A2F Y

Y Legend GE = General Electric j

A l

l i

SCC /hW9661

SUMMARY

OF RELAY WALKDOWN FOR USl A 46 PROJECT Panel Number: C932 Panel Name: Channel'A' Vertical Board j

MAKE/MODEL RELAY NUMBEP MOUNTING MAKE/MODEL VERIFIED &

VERIFIED &

RELAYID NUMBER O.K.(Y/N)

OK.(Y/N)

COMMENTS 10A K10A GE/HFA Y

Y j

10A-K18A GE/12HGA11A52F Y

Y 10A-K21A GE/12HGA11A52F Y

Y 10A-K44A GE/12HFA151A2F Y

Y j

10A K63A GE/12HFA151A2F Y

Y 10A-K65A GE/12HGA11A52F Y

Y 10A K66A GE/12HFA151A2F Y

Y 10A-K67A GE/12HGA11A52F Y

Y 10A-K6A GE/12HFA151A2F Y

Y 10A-K70A A/ETR Y

Y 10A-K75A NETR Y

Y 10A-K8A GE/12HFA151A2F Y

Y 10A K90A GE/12HFA151A2F Y

Y 10A-K9A GE/12HFA151A2F Y

Y 14A-K10A GE/12HFA151A2F Y

Y 14A-K12A GE/12HFA151A2F Y

Y 14A K13A GE/12HFA151A2F Y

Y 14A-K14A NETR14D3A003 Y

Y 14A K6A GE/12HFA151A2F Y

Y 14A-K7A GE/12HFA151A2F Y

Y 14A-K8A GE/12HFA151A2F Y

Y 14A-K9A GE/12HFA151A2F Y

Y 2E K13A GE/12HFA151A2F Y

Y 2E K138 GE/12HFA151A2F Y

Y 2E-K13C GE/12HFA151A2F Y

Y 2E-K13D GE/12HFA151A2F Y

Y 2E-K15A GE/12HFA151A2F Y

Y 2E-K158 GE/12HFA151A2F Y

Y 2E-K22A NGP Y

Y 2E K228 NGP Y

Y 2E-K23A NGP Y

Y 2E-K23B A/GP Y

Y 2E-K6A GE/12HFA151A2F Y

Y 2E-K68 GE/12HFA151A2F Y

Y 2E-K7A GE/12HFA151A2F Y

Y 2E-K78 GE/12HFA151A2F Y

Y Legend GE = Generaf Electric A = Agastat SCC &9661

..=

SUMMARY

OF RELAY WALKDOWN FOR USl A 46 PROJECT 4

PanelNumber: C941 Panet Name: Primary ContainmentIsclation Relay Cabinetinboard MAKE/MODEL RELAY NUMBER MOUNTING MAKE/MODEL VERIFIED &

VERIFIED &

RELAYID NUMBER O.K.(Y/N)

OK.(YlN)

COMMENTS 16A-K13A GE/12HFA151A2H Y

Y i

16A-K14A GE/12HFA151A2H Y

Y 16A K51 GE/12HFA151A2H Y

Y 16A-K9 GE/CR120A Y

Y 23A K37 GE/CR120 Y

Y 23A-K37X GE/CR120 Y

Y 23A K38 GE/CR120 Y

Y i

23A-K53A A/EGP0002 Y

Y 23A-K54A NEGPD002 Y

Y Legend j

GE = General Bectric A = Agastat I

i O

SCCM/9661

4 i

e 1

i i

J i

1 4

1 I

i ATTACHMENT 5 t

i i

RESUMES OF LEAD RELAY / RELAY REVIEWERS i

)

t 4

W d,

O i

e

l PAUL D. SMITH 127 ELLISVILLE ROAD PLYMOUTH, MA 02360 (508) 833-1429(H)

(508) 747-8404(w)

OBJECTIVE:

A position of influence, utilizing my technical skills and experience to forward the efforts of an environmentally conscious and socially 2

responsible company.

EDUCATION:

1974 Northeastern University, Boston, MA Bachelor of Science Degree in Engineering Technology Major in Electrical Engineering l

Additional courses in Control Systems and Nuclear Technology 1966 Wentworth Institute, Boston, MA Associate Degree in Electrical Engineering LICENSES:

l NRC Senior Reactor Operator License #10260 (BWR)- 1985 State of Massachusetts License, Nuclear Power Plant Operating Engineer #00287 - 1984 Federal Communications Commission, Second Class 1970 TRAINING:

MPR Associates, GlP/SQUG Relay Evaluation Course G.E. Nuclear Instrumentation Course, San Jose, CA - 13 4

weeks. Theory and maintenance of Instrumentation and Controls Foxboro Electronic Consotrol Course - 2 9veeks. Introduction to Foxboro Instrumentation i

Motorola Communications Course - 2 weeks. Maintenance of Solid State Devices

PAUL D. SMITH Page 2 Attended the following schools for approximately 1 week each:

Hydro-Products Undenvater TV Seminar Hammel-Dahl Valve School Radiation Protection Course e

Emergency Medical Technician Course EXPERIENCE:

1967 TO PRESENT Boston Edison Company. Boston. MA Pilarim Nuclear Power Station. Plymouth. MA (1/95 TO PRESENT) Senior System's and Safety Analysis Enaineer Providing/ supporting root cause analysis, design / procedure reviews on Analog Trip System failures, AOG premature recombination, N2 system seismic capability, Bistable vortexing accommodation, SFP Boron depletion, Ultimate Heat Sink and USI-A46 safe shutdown issues.

Nuclear Watch Enaineer/Actina Operations Support Division Manaaer (1992 -1994 Provide Operations input to planning / scheduling of Refueling Outage; Direct Critical Path Outage activities; Augment Fuel l

Pool Cooling, Core offload / reload, CRD System Window, RPV Reference Leg Modification and Test Director for Power Ascension Program. Ops Support includes management of STAS, ALARA, and Computer Interfaces; Administration of Operating Procedures. PDC, Technical Specification Technical Review and impact assessment.

Nuclear Operations Supervisor (1990 - 1992)

Supervised / directed on-shift activities in the operation and maintenance of Pilgrim Nuclear Power Station Chief Technical Enaineer (1980 - 1989)

Managed group of Senior Level Engineers including Mechanical, Electrical, I&C and Health Physics disciplines; Reviewed, revised Design Changes and Technical Specification Changes for operability, testability and maintenance; Provided investigations for root causes of operational problems and authored temporary procedures or modifications to rectify; Managed Onsite Reactor Engineering effort; Managed Radwaste improvement Program.

1 d

i i

l PAUL D. SMITH Page 3 Actina Chief Maintenance Enaineer (1979 - 1981)

Acted on behalf of and assumed all respons"^ities of the Chief Maintenance Engineer in his absence. Managed the efforts of a 40-man Maintenance Crew including Mechanical and Electrical disciplines providing repairs and i

implementation of modifications to Pilgrim Nuclear Power i

Station during operating cycle and included 200-man Contractor crew during refueling.

i

)

Maintenance Staff Enaineer/l&C (1975 - 1978)

Responsible for the overall direction and supervision of the maintenance of station Instrumentation Controls and associated equipment and the performance of surveillance i

tests in accordance with regulatory agencies and Company i

general orders. Analyzed Control, instrumentation and Computer Systems and determined adjustments and modifications to ensure that equipment functioned in a proper manner and full Safeguard Protection was maintained.

I Instrument & Control Supervisor (1974 - 1975)

As a front-line supervisor, directed the efforts of nine Nuclear Control Technicians in coordinating System calibration with i

the Operations Section. Devised and implemented Field Design Changes related to instrumentation measurement and i

control, specifically Neutron Monitoring and Nuclear Steam j

Supply Systems.

OTHER EXPERIENCE:

1980 TO 1995 Operations Review Committee Member i

1986 TO PRESENT Technical Support Center Supervisor in Emergency Plan 1986 TO PRESENT Manage Multidisciplined Analysis Teams determining root cause/ corrective actions for events such as: RPV Level Anomalies, Dropped Fuel Bundle, Feedwates Control Valve Failure, HPCl/RCIC/RHR System Failures, MSIV Pilot Poppet Disassociation, Halon Discharge,345KV Switchyard Misoperation, S/RV Overpressure Event, Lead Relay Reviewer for A46 Project.

1989 Power Ascension Program: As Test Coordinator, provided interface with Operations Section by scheduling and directing tests following extended CAL mandated outage.

REFERENCES:

Available upon request.

t i.

I DENISE E. THOMAS 90 Myrtle Avenue, Apt. 211 1

Whitman, MA 02382 l

Tel. 617 447 7840 l

Career Objectives:

A position in electrical engineering which will allow me to develop my professional skills and provide personal growth.

a i

j Employment:

BOSTON EDISON COMPANY, Pilgrim Nuclear Power Station-l 4/93-Present Plymouth, MA Provide technical support on electrical systems and equipment at j

Pilgrim Nuclear Power Station. Responsibilities include preparing and issving design modification packages, procuring equipment, preparing calculations; Specific projects include installation of Variable Frequency Drive on Turt>ine Building Crane Bridge motor, installation of Turtine Performance Monitoring equipment; Relay screening for the USl A-46 Program.

i GENERAL. DYNAMICS / Electric Boat Division-Groton, CT G/88-4/g3 i.

Submarine Reactor Plant Planning Yard Electrical Engineer Provided technical support for the design and development of i

instrumentation and control systems on commissioned submarines j

through ship alteration work packages. Also provided resolution of various~ problems associated with the installation of systems through j

liaison correspondence. Responsible for the issuance of system j

modification instructions which provided installation, test, dravAng, and procurement information. Provided resolution to problems associated i

with radiation monitoring and temperature monitoring equipment GEORGIA POWER COMPANY Atlanta, GA i

6/86-8/86 Transmission Line Group - Electrical Engineering Dept.

l and 8/85-12/85 Cooperative Education Student Cooperative Education assignmeat in the Transmir e Section to and

.;nes.

support installation of 500,230, and 115KV transt 1/85-5/85 l

Compiled sag and tension data, modified drawing., maintained l

specification manuals.

4 RENSSELAER POLYTECHNIC INSTITUTE Troy, NY Education:

Pursuing Master Of Science in Electrical Engineering 4

4 TUSKEGEE UNIVERSIP(, Tuskegee, AL Bachelor of Science in Electrical Engineering Graduation Date: May 1988 Special Submarine Reactor Plant School Training:

Radiation Control Safe Shutdown Equipment Selection Course 1

Relay Screening and Evaluation Course Engineering in Training Certificate Available Upon Request

References:

RESUME Name-Subhash C. Chugh Position Senior Engineer Department Mechanical / Civil / Structural EDUCATION MBA, Kellogg Graduate School of Management, Northwestern University, Evanston, IL i

BS, Civil Engineering, Osmania University, Hyderabad, India SPECIALTIES / EXPERTISE

(

Structural Engineering Project Management l

Field Construction Management SQUG Walkdown Screening and Seismic Evaluation Certification l

Relay Seismic Qualification EXPERIENCE PROFILE Total Engineering Experience 26 Years Nuclear industry Experience 20 Years l

Fossilindustry Experience 1 Year Petroleum / Refining Industry Experience 3 Years Commercial Eng./ Architectural Industry Experience 2 Years l

Dated 8/13/96 I

RESUME 1

Name:

John G. Dyckman Position:

Principal Engineer l

Department: CivillStructural/ Mechanical Group:

Nuclear Engineering

\\

EDUCATION M.S., Civil Engineering, Northeastern University, Boston, MA B.S., Civil Engineering, Worcester Polytechnic Institute PROFESSIONAL REGISTRATION Registered Professional Engineer #27157 - Massachusetts i

PROFESSIONAL MEMBERSHIPS American Society Of Civil Engineers, Member SPECIALTIES / EXPERTISE SQUG Certification: SQUG Walkdown Screening and Seismic Evaluation Training Course EXPERIENCE PROFILE Total Years Engineering Experience:

30 Emplover Position Function BECo Principal Engineer Civil / Structural engineering and staff assignments Cygna Engineering Manager Engineering consulting Stone &

Webster Sr. Structural Engineer Power plant engineering and design 4

4 Dated 5/28/96

V VECTRA BORIS LOKSHIN SUPERVISING ENGINEER PROFESSIONAL EXPERIENCE Dr. Lokshin is a Supervising Engineer in the Systems Engineeririg Section in VECTRA's Boston office with over 18 years of experience in the engineering, and design of instrumentation and electrical control systems with strong theoretical background in modeling and systems testing with technical management experience at project level.

Dr. Lokshin is presently Project Manager and Project Engineer for Boston Edison Company's Setpoint Control Program project. Major tasks of this project include:1) development of conceptual design for Setpoint Control Program (SCP); 2) preparation of setpoint calculations, and 3) preparation of Technical Specification Change Packages. The calculations are being performed using the instrument as-found/as left statistically analyzed calibration data. This approach is consistent with recommendations of NRC Generic Letter 91-04 " Changes in Technical Specification Surveillance Intervals to Accommodate a 24-Month Fuel Cycle". Dr. Lokshin is personally involved in specific loop analysis, development of SCP, and Technical Specification change Packages, in addition, he is responsible for the day to-day operation of the project by maintaining control of technical work, tracking project production, commitments and the completion of project deliverables.

Prior to this assignment, Dr. Lokshin served as Project Manager for BECo's Reg. Guide 1.97 project. In this capacity, he provided technical direction in circuit analysis and instrument loop accuracy / uncertainty calculations.

Recently, Dr. Lokshin was assigned as a Project Engineer on the Hydrogen Water Chemistry Project at Pilgrim Nuclear Power Station for Boston Edison Company where he is responsible for developing l&C documents related to the project, evaiuating technical data provided by General Electric and preparing Design Change Packages.

While assigned to Boston Edison Company's engineering office, Dr. Lokshin supported the VECTRA project team which assisted BECo with the initial

  • pilot" I&C Safety Functional Inspection by the NRC.

V I

VECTRA BORIS LOKSHIN Page Two EHQFESSIONAL EXPERIENCE (Cont')

j in a recent assignment, Dr. Lokshin was involved in the PSE&G - Salem Unit 2 Station DCRDR modification project, where he was responsible for reviewing Alarm Response Procedures, Operating, Maintenance, l&C and other procedures affected by DCRDR modification, and identifying design discrepancies in Annunciator Window Arrangement drawings.

Previously, he was assigned to the Peach Bottom Atomic Power Station Configuration Management Assessment Project for Philadelphia Electric Company (PECO), where he participated in functional area assessments for design basis and training.

Dr. Lokshin was also involved in analyzing PECo setpoint calculation methodology, including algorithm review.

Earlier, he worked on the Watts Bar Nuclear Plant Design Review Project for TVA where he was responsible for developing a design criteria for Loose PartsNibration Monitoring System and involved in developing a design criteria for instrumentation and controls for the Watts Bar Plant.

Prior to this assignment, Dr. Lokshin worked on the Millstone 1 Appendix "R" circuit failure analysis project for Northeast Utilities, where he was responsible for performing a circuit failure analysis of the control and power circuits for instrumentation and other equipment required for safe shutdown. On this project, he reviewed elementary and loop diagrams to determine the effects on equipment due to fire induced cable failures, i

and documented the analysis on the drawings.

While assigned to the Miramichi Pulp & Paper Recovery Boiler Project for C E Canada, Dr. Lokshin was responsible for the engineering and specification of Process Instrumeri.ation and developing instrument Loop Diagrams.

In previous assignments, Dr. Lokshin has been responsible for developing and approval of Test Loop Diagrams, reviewing engineering and design documents, including elementary and wiring diagrams, and resolving discrepancies of various electrical control systems for nuclear power plant design projects, including Beaver Valley Unit 2 ict Duquesne Light Company and Millstone Unit 3 for Northeast Utilities while workir.g for 11arge architect-engineering firm in the Boston area.

i v

VECTRA BORIS LOKSHIN Page Three 4

PROFESSION AL EXPERIEN_CE (Cont'd)

Dr. Lokshin has supervised a staff of 12 test engineers and directed engineering field support activities in the calibration and maintenance of a broad range of devices (digital and analog), including various types of sensors, converters, programmable controllers and other instruments. He was also responsible for developing and approvat of Loop 7

Calibration reports, and gathering and analyzing data for various automatic control systems.

Previously, as a project leader, Dr. Lokshin was responsible for development of methods for measuring open loop response of various control system elements, processing of experimental data using methods of random function theory, deriving mathematical models, optimization of parameters, formulating recommendations for implementation of control systems, analyzing process stability, accuracy and deviation.

These efforts culminated in the publication of his dissertation,"Research and Development of Control System for Mobile Object".

He has also participated in developing and operating automatic control system prototypes and debugging and testing in the field.

EDUCATION Ph.D., Control System Engineering, Department of Engineering, Leningrad institute of Technology and Agriculture,1978 M.S.E.E., Leningrad Polytechnic Institute, Leningrad, USSR,1973 PROFESSIONAL LICENSES AND REGISTRATIONS Certified as a Level 111 Test Engineer per ANSI N45.2.2

j

)

STEPHEN P. REICHLE PROFESSIONAL EXPERIENCE Mr. Reichte has over 20 years of power plant engineering, design, maintenance, and operations experience. As Technical Services Consultant for Mechanical Systems in VECTRA's Boston office he is currently assigned as the Project Manager for the Fire Hazards Analysis (FHA) project for the New York Power Authority. This project consists of updating the FHAs for both the James A. FitzPatrick and Indian Point 3 nuclear plants. The project also includes the preparation of an analysis that assesses the effects of pipe rupture, inadvertent actuation and manual use of fire protection systems on safety related equipment at JAF and IP3.

Mr. Reichte is also currently serving as the Systems Project Engineer on the NRC's Unresolved Safety Issue (USI) A-46 projects for: Northeast Utilities (Millstone 1,2 and Connecticut Yankee), Philadelphia Electric (Peach Bottom and Umerick) and Public Service Electric & Gas (Salem). In this role, he is responsible for the identification of safe shutdown paths and the development of a Success Path Component List for each unit.

These NRC programs deal with the seismic adequacy, or margin of equipment in operating plants.

Previously, Mr. Reichte served as the Project Manager for the Appendix R Compliance Program and Fire Barrier Upgrade Projects at the Pilgrim Station. Mr. Reichte managed these programs for over two years, with tasks including the development of Appendix R shutdown analyses, the development of associated operating procedures, the review and upgrade of all Appendix R fire barriers, and the design of various electrical and mechanical system modifications. This project was staffed with approximately 25 engineers and technicians, Mr. Reichte served as the Project Engineer, and managed the engineering resources, o

during the update of the J. A. FitzPatrick Fire Protection Reference Manual, and supported the update of the Fire Protection Program Manual for Indian Point Unit 3. Both of these projects involved the update of fire protection and Appendix R programs to include the changes made by modifications, and the preparation of a new manual that included both programs.

Mr. Reichte also served as the Project Engineer for an Appendix R project for Northeast Utilities Millstone 3 Nuclear Power Plant. This project consisted of four major tasks:1) review the plant's safe shutdown methodology and equipment list to ensure completeness

2) identify which components might be affected for each fire area,3) identify the worst case fire scenario (in terms of equipment loss) for each fire area, and 4) identify and prioritize the operator actions that need to be taken in each fire area.

V i

[

VECTRA STEPHEN P. REICHLE Page Two i

J EXPERIENCE (Cont'd)

Prior to this assignment, Mr. Reichte performed a design baseline verification of the j

Emergency Operating Procedures (EOP) for Nine Mile Point 1, and determined the impact of operating safety related systems with normally open manual valves at the system's interface with non-safety related portions of the system. His responsibilities on these projects included the preparation of verification packages to document design basis of input parameters to EOP flowcharts, preparation of various design calculations, and preparation of a report on the boundary valves. Also included within this project was a review of the plant's Service Water System and the effect of increased take water temperature.

Mr. Reichte has also served as a technical specialist in support of triennial fire protection audits at the H.B. Robinson, Brunswick and Shearon Harris nuclear power plants. During these audits, he served as the Systems Engineer reviewing station oporating practices, programs and procedures used to ensure safe shutdown of the plants in the event of a fire.

Mr. Reichte has prepared Design Baseline Documents (DBDs) for the feedwater and fire protection systems at the PECO Peach Bottom and Limerick nuclear plants. This project consisted of conducting the necessary research to identify the boundaries, interfaces and requirements of the individual systems. The documents also describe how each of the systems satisfies their design input and output requirements, and what modifications have impacted the system's origir.al design basis. Mr. Reichle also participated in the Appendix 1

R update project for the Limerick Nuclear Station by reviewing the new and updated shutdown methods identified for each fire area, and assisting in the resolution of shutdown concems identified during the review process.

Mr. Reichle has also served as the Project Manager for the single failure analysis of the ECCS sub-systems, and their support systems, for the Connecticut Yankee plant. This project included the identification and review of potential equipment failures for each of the systems, including mechanical, electrical and instrumentation, during injection and recirculation modes in response to a LOCA.

In conjunction with the above single failure analyses, a review of the CY surveillance procedures was performed. This review was conducted to ensure that all ECCS redundant or required components were included in the appropriate procedure, and that proper surveillances were being performed to assure operability of the systems.

-- - -. + -,

e.-

k l

l V

l VECTRA STEPHEN P. REICHLE Page Three EXPERIENCE (Cont'd Prior to joining VECTRA, Mr. Reichte was a Senior Engineer at Cygna Energy Services and i

assisted in the preparation of the Appendix *R' review for NUSCo's Millstone 1,2 and t

Connecticut Yankee generating stations. As a member of this project, he was assigned tasks such as developing safe shutdown scenarios and identifying equipment which needed to be protected, establishing safe shutdown fire areas, performing walkdowns of i

fire areas to verify the adequacy of existing barriers (including doors, dampers, and i

penetration seats), identifying barrier deficiencies, preparing justifications for exemption requests, and making recommendations for upgrading fire barriers or their penetrations to the required fire resistance rating.

Mr. Reichte also participated in preparing a conceptual design of a seismic hot shutdown system for the Yankee Rowe Nuclear Plant. This project reviewed the feasibility of providing a standby, portable pumping system made up of standard commercial grade components, that would deliver water to the steam generators and/or main coolant system in the event no other method was available. Included in this project was the identification system demands, sizing of components, identification of water sources, and providing an estimated cost to insts!! the system.

In a previous assignment, Mr. Reichle served as Lead Engineer for the development of surveillance and maintenance procedures for the Shoreham Power Station. His respont,ibilities included the identification of maintenance and inspection requirements for all mechanical balance of plant equipment. He established the parts requirements, special tools, riggin'g and handling instructions for those procedures. Mr. Reichte aisc supervised additional tasks for the Shoreham Station including:

Development of Fire Protection Program Description and Associated Procedures Development of Maintenance Program Description e

NUREG-0612 Heavy Loads Analysis, and Procedure Preparation e

Preparation of Refueling Procedures e

Design, Analysis, and Fabrication of Fuel Handling and Reactor Head e

Strongback Before joining Cygna, Mr. Reichle held the position of Lead Applications Engineer for the Jamesbury Corp., a manutacturer of fluid control equipment. His responsibilities included supervising technical analysis, sizing equipment, selecting material and accessories, and resolving field installation and operational problems of motor-operated valves.

V VECTRA STEPHEN P. REICHLE Page Four i

I l

EXPERIENCE (Cont'd)

Mr. Reichte was responsible for sizing valve actustors (both pneumatic and electric) given the system operating conditions. For motor operated valves this task included determining l

the necessary torque output, then selecting the appropriate gear train configuration and motor size. For nuclear projects, motor sizing included considerations of both normal and degraded voltage conditions.

Earlier in his career, Mr. Reichte worked with Stone & Webster Engineering Corporation where he was the responsible engineer for liquid and solid radioactive waste systems.

Responsibilities associated with this position included: development of system design and flow diagrams, engineering, selection of equipment and layout, preparation of equipment specifications and purchase requisitions. Other duties included review of system piping diagrams, and resolution of field installation problems. Mr. Reichte also assisted in the development of a spare parts program and database for Millstone Unit 3.

In his initial assignment at Stone and Webster, Mr. Reichle assisted in the preparation of a system operations manual for Connecticut Yankee. This work included the writing of system descriptions and operating procedures for the waste evaporator degasifier, aerated drains, and steam generator blowoff.

Before Mr. Reichte's employment with Stone & Webster, he spent six years in the U. S.

Navy Nuclear Submarine Program whe,0 he qualified as an Engineering Watch Supervisor.

EDUCATION B.S., Mechanical Engineering, Central New England College A.S., Mechanical Engineering, Worcester Junior College U.S. Navy Nuclear Power School and Prototype Training Graduate Work, Fire Protection Engineering, Worcester Polytechnic Institute PROFESSIONAL ACTIVITIES Member, American Society of Mechanical Engineers Member, Society of Fire Protection Engineers l

~~

T VECTRA STEPHEN P. REICHLE TECHNICAL SERVICES CONSULTANT EXPERIENCE HIGHLIGHTS Twenty (20) years of experience in nuclear systems design, analysis, fire protection, 10CFR50 Appendix R safe shutdown analysis and related areas of the nuclear power industry.

VECTRA 1985 to present Technical Services Consultant CYGNA Energy Services 1981 to 1985 Lead Engineer Jamesbury Valve 1979 to 1981 Lead Applications Engineer Stone and Webster Eng.

1974 to 1979 Operations Services Engineer U.S. Navy 1968 to 1973 Nuclear Power Program EXPERIENCE SUMM ARY Project Manager for NYPA (JAF and IP3) Fire Hazards Analysis update and Suppression Effects Analysis (1993 - present)

Project Manager for NUSCO (Conn. Yankee) Single Failure Analysis of ECCS Sub-systems (1988 - 1989).

Project Manager or Project Engineer for several 10CFR50 Appendix R Analysis and fire protection projects:

BECo (Pilgrim Station) Appendix R Analysis and Fire Barrier Upgrade (1985 -

1988)

NYPA (JAF and IP3) Fire Protection Reference Manual and FHA (1990 1992)

NUSCO (MP3) Appendix R Shutdown Methodology Review (1989)

Project Engineer (System) for several OSI A 46 and seismic IPEEE projects:

NUSCO (Conn. Yankee, Millstone 1 and 2) 1992 - present PECo (Peach Bottom 1 and 2, Limerick 1 and 2) (1992 - present)

PSE&G (Salem 1 and 2)(1993 present)

Project Engineer for NMPC (NMP2) Design Basis Document project (1992 - 1993).

Lead Engineer for radwaste systems design for new construction BWR.

Preparation of conceptual designs and design change packages for various nuclear systems and components.

Applications Engineer for the section of valves and actuators to meet client specifications.

V VECTRA JAMES J. BUCKLEY SPEClALTIES ELECTRICAL ENGINEERING AND DESIGN PROFESSIONAL EXPERIENCE Mr. Buckley is the Supervisor of Design and Drafting for VECTRA's Boston office Design / Engineering Section of tha Electrical Systems Division. He has over 24 years of experience in the engineering, design and installation of electrical systems for power generation and various industrial facilities including pulp and paper projects and water /

sewerage treatment plants.

Mr. Buckley has attended the SOUG training course for Safe Shutdown Equipment Selection and Relay Screening and Evaluation which qualifies him as a Lead Relay Reviewer. Presently, Mr. Buckley is the Lead Relay Reviewer fr the identification of

i USI A-46 and IPEEE Safe Shutdown Equipment and Relays for Philadelphia Electric Company (PECo) Peach Bottom Atomic Power Station Units 2 and 3. The overall project scope is to retrieve each electrical component from the Safe Shutdown List for Relay Evaluation and review schematics, wiring diagrams and loop diagrams associated with each component to identify relays required to be verified as seismically adequate per the requirements of the SQUG Generic Implementation Procedure (GIP).

He has also been the Lead Relay Reviewer for the Public Service Electric and Gas Company (PSE&G) Salem Generating Station Units 1 and2, Northeast Utilities Service Company (NUSCO) for Connecticut Yankee and Millstone Units 1 and 2 and the Boston Edison Company Pilgrim Nuclear Power Station.

Prior to this assignment, he was the Project Engineer for the Boston Edison Pilgrim Station Annunciator Project, which performed a complete redesign of the existing system including the preparation of three Plant Design Change (PDC) packages. The project scope was to rearrange the Control Room annunciator windows and revisa the associated electrical schematics, wiring diagrams, cable block diagram, cable and raceway schedules, process and instrumentation diagrams and functional control diagrams.

Previously, Mr. Buckley served as Lead Engineer for the Electric Load Management System project, a data collection effort for NUSCO's Millstone Unit 1 Station. He also held the same position for an identical project at NUSCO's Connecticut Yankee Station.

v VECTRA JAMES J. BUCKLEY Page Two EXPERIENCE (Cont.)

Prior to this assignment, Mr. Buckley was assigned to the Carolina Power and Light, Brunswick Plant, Appendix R separation analysis documentation review. He also supported the Niagara Mohawk, Nine Mile Unit 1, project which consisted of 125VDC system modifications, fuse and molded-case switch additions to the 125VDC j

distribution boards and addition of battery monitoring systems for 125VDC batteries.

in a previous assignment, he was a Project Engineer on the Commonwealth Edison, Dresden Unit 2 Annunciator Modifications Project. This modification addressed the i

human engineering deficiencies associated with the plant annunciator system.

i Changes to the system included auditory coding, ringback and flashrate adjustment and reflash. These changes resulted in extensive revisions to the plant's wiring and schem'. tic drawings.

Previously, he was the Lead Electrical Design / Engineer for the No. 4 Chemical Recovery Boiler Project for Miramichi Pulp and Paper. His responsibilities incirted checking electrical specifications and calculations, development of the wiring design for connection of field cables as well as the design of raceways, grounding, lighting, etc.

His earlier assignments at VECTRA included experience in an as built verification of wiring diagrams for control panels and the development of design change packages required to resolve any deficiencies and updating all affected drawings for Boston Edison's Pilgrim Station. Other activities at Pilgrim Station included lighting design of the Computer Room, answering Engineering Service Requests (ESR), issuing and resolving Potential Conditions Adverse to Quality (PCAO), writing and implementing

)

Maintenance Work Request (MWR), evaluating plant conditions for circuit isolations and the preparing Appendix R Plant Design Change Packages. These packages included cable rerouting, and the installation of fire detection and suppression systems.

His previous assignments include a staff position on the Equipment Qualification Program team for Northeast Utilities and at the Seabrook Station which also included walkdown assignments. Earlier assignments with VECTRAinclude the electrical design of the Appendix R Emergency Lighting System for Connecticut Yankee.

In an assignment at the NYPA Fitzpatrick plant, Mr. Buckley was responsible for coordinating the installation of electrical modifications in accordance with 10 CFR 50, Appendix R. His responsibilities included the layout of equipment, conduit routing and design of conduit supports.

4 V

VECTRA i

JAMES J. BUCKLEY Page Three i

EXPERIENCE (Cont)

Mr. Buckley previously worked with the C.T. Main Corporation Pulp and Paper Division where he was responsible for the electrical design of tecovery boiler systems including precipitators, evaporators, and air compressors for the Ngodwana Mill Expansion Program in South Africa, in connection with this work, he was also responsible for raceway layout and design, and field engineering support. He prepared the secondary electrical power drawings, motor control center arrangemenis, computerized cable schedules, and related PLC drawings. He was assigned to the site for four months for 4

the checkout and start up of the recovery boiler, and the review of the electrical j

subcontractor's work. Other projects included the design of paper machines, power

)

boilers, coal and wood yards and turbine generators.

With Metcalf & Eddy, Mr. Buckley was involved in the electrical design of various water and sewerage treatment plants. His work included a three month field assignment to determine the sources of computer analog and digitalinputs associt sd with the computerization of an existing sewage treatment plant in St. Paul, Minnesota.

In an eariier assignment, he spent three months overseas providing engineering support for the construction of military air base facilities in the Kingdom of Saudi Arabia.

i 1

EDUCATION Attended Northeastern University's Lincoln College t

3 4

J l

i 1

l 4

4

i l

i Y

i 4

i VECTRA DAVID ROSSETTI i

i SPECIALTIES I

Electrical Engineering and Design / CAD i

PROFESSIONAL EXPERIENCE s

Mr. Rossetti is a Designer in VECTRA's Boston office with over six years of experience in electrical design engineering. His skills include Engineering Drawing, Computer Aided Design, Technical Writing, and various computer applications.

l He is presently assigned to the USl A-4G relay review project for Commonwealth Edison Company (CECO) Ouad Cities Station, Units 1 and 2. The overall project scope is to retrieve each electrical component from the Safe Shutdown List for Relay Evaluation and review schematics, wiring diagrams and loop diagrams associated with i

i each component to identify relays required to be verified as seismically adequate per the requirements of the SQUG Generic Implementation Procedure (GIP). He has also

]

been involved with relay reviews for Northeast Utilities Service Company (NUSCO)

Connecticut Yankee and Millstone Units 1 and 2 Stations, Philadelphia Electric

]

l Company (PECo) Peach Bottom Atomic Power Station Units 2 and 3 and the Public Service Electric & Gas Company (PSE&G) Salem Generating Station Units 1 and 2.

l For James River Corporation, Mr. Rossetti performed the electrical design for the l

continuous emissions monitoring systems installed by ABB Environmental Systems, Inc. at James River's Berlin and Cascade Paper Mill boilers.

l For the Boston Edison's Pilgrim Station annunciator replacement project, Mr. Rossetti was involved in the redesign of electrical schematics, wiring diagrams and layout

{

drawings.

Mr. Rossetti recently created new, and revised existing, electrical schematic and wiring diagrams for the Control Room annunciation modification project at PSE&G's Salem Units 1 and 2. For Carolina Power & Light, Mr. Rossetti reviewed electrical systems drawings and documentation in order to assist in developing safe shutdown functional block diagrams. He also reviewed cable separation in fire zones to insure Appendix R compliancs.

For CECO's Dresden 2 Control Room annunciation modification project, Mr. Rossetti created new, and revised existing plant electrical schematic and wiring diagrams.

v VECTRA DAVID ROSSETTI Page Two PROFESSIONAL EXPERIENCE (Cont'd) l For an eariier project to the No. 4 Chemical Recovery Boiler Project for Miramichi Pulp and Paper Company, Mr. Rossetti was responsible for developing wiring diagrams, revising cable tray drawings, scheduling and routing cables and inputting raceway and equipment information into a computerized database.

Previously, Mr. Rossetti was assigned to the BECo, E203 Phase 111 Project at the Pilgrim Nuclear Power Station. In this assignment, he assisted in performing walkdowns of selected control panels where the internal and external wiring of the control panels was verified. Mr. Rossetti utilized the information obtained in the walkdowns to prepare new drawings of the same control panels, both internal and l

external wiring diagrams. Mr. Rossetti also prepared new station drawings such as elementary diagrams, relay lists and internal and external wiring diagrams of other j

control panels from information supplied to him from other engineers and designers assigned to the prc, ject.

Prior to his employment at VECTRA, Mr. Rossetti attended North Shore Community College where he was trained in Engineering, Computer-Aided Design and Technical Writing.

EDUCATION Associates in Engineering Science Certificate in Computer Aided Design North Shore Community College, Beverly, Massachusetts Currently attending Northeastem University in B.S.E.E. Evening program l

I i

l