Text
-
Ent:srgy Op:retiana,Inc.
ENTERGY
~-
e a a 7se 3
Purt Gbson MS 391E0 Tel 601437 6470 M. J. Meisner l
Du w mv :..sa wm m.,s September 26, 1996 l
l l
U.S. Nuclear Regulatory Commission l
Mail Station P1-37 Washington, D.C.
20555 Attention:
Document Control Desk l
Subject:
Grand Gulf Nuclear Station l
Docket No. 50-416 l
License No. NPF-29 l
Additional Information for Relief Request I-00014, Revision 1 l
GNRO-96/00111 Gentlemen:
Entergy Operations, Inc. submitted Relief Request I-00014, Revision 1 on August 12, 1996.
The relief request requested relief from the l
requirements of American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Section XI Cole in accordance with 10 CFR
- 50. 55a (g) (5) (iv) and 10 CFR 50.55a (g) (6) (i) and incorporated changes to the Grand Gulf Nuclear Station (GGNS) pressure testing program j
resulting from the approval of Code Case N-498-1.
On September 25, 1996, the NRC discussed the requested relief with GGNS personnel and requested a change to the relief request.
Section VII of the relief request, Alternative testing, indicated "None" in l
the August 12, 1996 submittal. The NRC requested that the limited l
examinations contained in the body of the relief request along with the pressure testing to be performed by Code Case N-498-1 be included as the alternative testing. By this letter, GGNS is revising the relief request as requested by the NRC.
Additionally, Item 2 of l
Section VI of the relief request, Reasons why the relief should be l
granted, is clarified by stating that the reactor pressure vessel will be subjected to pressure testing in accordance with the requirements of ASME Section XI, or Code Case N-498-1.
[t
,.o N.
- th EEI$$$h6 i
3 O
September 26, 1996 GNRO-96/00111 Page 2 of 3 is the relief request revised to incorporate the two changes discussed above. No other changes to the relief request have been made; however, the entire revised relief request is attached for convenience.
If you have any questions, please contact Sheri Mahoney at 601-437-6552.
Yours truly, 1
. //
'_ f MJM/SBM/ams I
attachment:
Revised Relief Request I-00014 cc:
Mr. J. Tedrow (w/a)
Mr. R. B. McGehee (w/a)
Mr. N.
S.
Reynolds (w/a)
Mr. H.
L. Thomas (w/o)
Mr. J. W. Yelverton (w/a)
Mr. L. J. Callan Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011 Mr. J. N. Donohew (w/2)
Project Manager, Region IV/GGNS Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Comunission Mail Stop 13H3 Washington, D.C.
20555
4
- to Gl'RO-96/00111 Revised Relief Request I-00014
-, - - -_~ -. - - - -. -. - -. -. -. _ - -
GRAND GULF NUCLEAR STATION INSERVICE INSPECTION REQUIREMENTS INSERVICE INSPECTION SECTION 4 l
TEN YEAR PROGRAM RELIEF REQUESTS PAGE 1 OF 25 GRAND GULF NUCLEAR STATION UNIT 1 RELIEF REQUESTI-00014, REVISION 1 l
INSERVICE INSPECTION OF REACTOR PRESSURE VESSEL NOZZLE TO SHELL WELDS I.
Component:
Reactor pressure vessel (RPV) to nozzle welds and associated base material. (See Table 1 and l
Table 2 for nozzle identification.)
]
II.
Code:
l The Unit 1 RPV was designed and fabricated to ASME Section III, Class I requirements.
Applicable inservice inspections are to be performed in accordance with Regulatory Guide 1.150, Revision 1, and ASME Section XI,1977 Edition with Addenda through and including Summer-1979. Also, Relief Request I-00013 permits the use of ASME Section XI,1983 Edition with the Summer 1983 Addenda, Figure IWB-2500-7(b), for identifying the code required examination volume of Examination Cr.tegory B-D welds III.
Code requirements:
Table IWB-2500-1, Examination Category B-D, Full Penetration Welds of Nozzles in Vessels, items B3.90 and B3.100 requires a volumetric examination of the adjoining weld, base material for 1/2 thickness on each side of the weld, and inner radius (see Figure 1).
IV.
Information to suDport the determination that the Code requirements are imDractical:
Of the 35 nozzles requiring a volumetric examination of the weld and adjoining base material,9 ~
have been examined using automated remote techniques, and the remaining 26 nozzle-to-vessel welds have been examined using manual techniques.
Table 1 provides the limitations for the nozzles that were examined using the automated techniques and Table 2 provides the limitations for the nozzles that were examined using manual techniques.
. Both Tables compare the Code required examination volume against the examined volume. In this evaluation, the Code required volume has been subdivided into the areas recognized by Regulatory Guide 1.150 as being the more critical area and, additionally, the weld and heat affected zone coverage has been reported separately.
t
l GRAND GULF NUCLEAR STATION INSERVICE INSPECTION REQUIREMENTS i
j.
INSERVICE INSPECTION SECTION 4
(
TEN YEAR PROGRAM RELIEF REQUESTS l
PAGE 2 OF 25 j
GRAND GULF NUCLEAR STATION UNIT 1 i
RELIEF REQUESTI-00014, REVISION 1 l
INSERVICE INSPECTION OF RE ACTOR PRESSURE VESSEL NOZZLE TO SHELL WELDS 4
!~
In addition to the limitations that are specific to each technique, the Near Field effect which is Common to most contact ultrasonic examinations provides a limitation that is generally accepted as being the first 1/4 inch of thickness from the surface that is in contact with the transducer.
]
Although this limitation is typically not subject to relief, it has been conservatively included in this l
request for reliefin the calculations used to determine the examined volume.
i The calculations used to determine examination coverage are based only on the sound beam centerline and the volumes examined by beam spread is not considered in the coverage information provided in Tables 1 and 2.
i Figures 2 through 8 depict the typical coverage pattern for each type nozzle with each beam angle.
1 4
l A.
Automated Examinations The automated scanning mechanism utilizes two types of scanning packages:
i
)
1.
The "T-scan" (shear wave sound beam transverse to the weld axis) transducer package consists of a 0 straight beam,45 and 60 angle beams.
The 45 and 60 angle beam wedges are angulated to produce a sound beam that is perpendicular to the weld centerline at the vessel inner surface. One complete revolution of the nozzle scanner, with the "T-scan" package will scan for parallel oriented reflectors using a 45 and 60 angle beam, and for planar and laminar reflectors using a 0 straight beam.
2.
The "P-scan" (sound beam parallel to the weld axis) transducer package consists of 45 and 60 angle beam wedges. One wedge is pointed in the clockwise direction, and the other is pointed counterclockwise. The 45 and 60 angle beam wedges are angulated to produce a sound beam that is tangent to the weld centerline at the vessel inner surface. Two complete revolutions of the nozzle scanner with the "P-scan" package are performed to scan (from two directions) for transverse oriented reflectors.
GRAND GULF NUCLEAR STATION INSERVICE INSPECTION REQUIREMENTS INSERVICE INSPECTION SECTION 4 TEN YEAR PROGRAM RELIEF REQUESTS PAGE 3 OF 25 GRAND GULF NUCLEAR STATION UNIT 1 RELIEF REQUEST l-00014, REVISION 1 INSERVICE INSPECTION OF REACTOR PRESSURE VESSEL NOZZLE TO SHELL WELDJ l
L The nozzle design of the BWR 6 does not allow for a full volume examination of the weld and associated 1/2 T of base material on each side of the weld when performing the examination with the automated remote technique for the following reasons:
1.
Due to the short distance from the weld centerline to the nozzle to shell' radius, the examination volume can only be scanned from the shell side of the weld.
2.
Also, this short distance prevents extending the scanning arm far enough past the weld towards the nozzle to obtain full coverage of the required volume while scanning from the shell side.
Performing supplemental manual examinations of the accessible volumes would provide very limited increases of total volumes examined. The additional volume coverage obtained by supplementing the automated examinations with manual examinations is not justified when compared to the manrem expenditure. The estimated average time required to supplement the automated examination with manual examinations is approximately 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> per nozzle, for two technicians. Using
]
an average dose rate of 197 mr/hr for each of the nine nozzles based on measured i
doses taking during our fifth refuel outage after flushing, and assuming a stay time of 2 manhours per nozzle, the total manrem expenditure to perform the supplemental examinations would equal approximately 3.5 manrem. The averaged additional coverage would only equal approximately 10% for the N2 nozzles,11%
for the N3 nozzles, 8% for the N4 nozzles and 7% for the N6 nozzle.
B.
Manual Examinations Although manual techniques generally provide enhanced coverage compared to the automated technique, there are still limitations because of the interface problems l
with the ultrasonic transducer and the nozzle to vessel geometry. The examination l
volume required by the Code exceeds what is physically accessible with available manual or automated techniques and equipment. The coverage obtained with the i
GRAND GULF NUCLEAR STATION INSERVICE INSPECTION REQUIREMENTS INSERVICE INSPECTION SECTION 4 TEN YEAR PROGRAM RELIEF REQUESTS PAGE 4 OF 25 GRAND GULF NUCLEAR STATION UNIT 1 RELIEF REQUEST l-00014, REVISION 1 INSERVICE INSPECTION OF RE ACTOR PRESSURE VESSEL NOZZLE TO SHELL WELDS manual technique represents the best obtainable coverage with any known NDE method for a volumetric examination from either surface.
To date, there has been no reported occurrence of cracking at nozzle / vessel weld locations and adjacent areas. It has been generally accepted that the nozzle / vessel welds are not the limiting location with respect to structuralintegrity. Cracking has been found at the feedwater nozzle blend radii and bore region at various domestic and foreign plants. The first cracking reported was discovered at the nozzle blend radii as well as the feedwater spargers and brackets and nozzle bore area. Cladding was present on the cracked nozzle, whereas there is no cladding on the Grand Gulf nozzles. The presence of the cracking was attributed primarily to rapid cycling of hot and cold j
water, and the presence of cladding. During the inspection which discovered the cracking, which was a liquid penetrant examination, no cracking of the nozzle / weld was observed. This indicated that the feedwater nozzle blend radii was limiting. Since Grand Gulf does not have cladding on the feedwater nozzles, has feedwater flow controller in operation, and triple thermal sleeve, cracking is not expected to occur at the feedwater nozzle blend radii. Therefore, since the nozzle blend radii is more limiting than the nozzle vessel weld, cracking at the weld is also less likely.
Since the feedwater nozzle is limiting, the discussions and conclusions to follow are also applicable to all nozzle / vessel welds on the Grand Gulf RPV.
Applied Stress Levels The only significant loadings that could affect the feedwater nozzle and nozzle / vessel weld area are due to internal pressure and thermal cycling caused by the mixing of hot and cold fluids in the nozzle bore and blend radii regions. However, the rapid thermal cycling effects have significantly decreased near the nozzle / vessel weld and does not produce any significant thermal cycling. This same thermal cycling was the predominant contributor to the observed cracking at the feedwater nozzle blend radii and bore regions of other plants. In addition, the inner cladding which aided the occurrence of cracking is not present on the Grand Gulf nozzle.
Note that the nozzle / vessel weld location is 'tr enough away from the blend such that stress magnification from the geometric discontinuity has reduced significantly.
GRAND GULF NUCLEAR STATION INSERVICE INSPECTION REQUIREMENTS l
INSERVICE INSPECTION SECTION 4 TEN YEAR PROGRAM RELIEF REQUESTS PAGE 5 OF 25 GRAND GULF NUCLEAR STATION UNIT 1 RELIEF REQUEST 100014, REVISION 1 INSERVICE INSPECTION OF REACTOR PRESSURE VESSEL NOZZLE TO SHELL WELDS l
Fatigue Crack Initiation / Propagation i
i The occurrence of fatigue crack initiation and subsequent propagation requires the presence of cyclic loading. As stated above in Applied Stress Levels, the significant loadings come from internal pressure. As stated earlier, the rapid thermal mixing experienced at the feedwater nozzle i
bore and blend radii has diminished significantly at the nozzle / vessel weld. Therefore, fatigue crack initiation is not likely to occur since the only contributors are pressure stresses and startup/ shutdown thermal gradient stresses and these events are limited in number.
This is consistent with the results of the feedwater nozzle blend radii UT results at Grand Gulf.
Since initiation of flaws is not expected, propagation is not an issue. However, even if a crack is postulated, the predicted crack growth from cycling is small.
l l
Stress Corrosion Cracking Potential l
~
To date, both experimental and field experience has shown no evidence of SCC initiation in A508 material. SCC is only possible when an initial significant starter crack is present. Without this condition, SCC is not a concern in A508 material. Therefore, for the Grand Gulf nozzle / vessel welds, SCC is not a plausible failure mechanism.
Radiation Embrittlement The presence of high radiation fluency levels could affect the Nil Ductility Transition Temperature (RTNDT),- and therefore cause radiation embrittlement.
However, all nozzles are located sufficiently away from the core such that the fluency levels are not high enough to cause material embrittlement, Therefore, radiation embrittlement is not a concern for the Grand Gulf nozzle / vessel welds. This is consistent with assumptions made in prior fracture mechanics evaluations performed
' for the nozzle blend radii cracking.
Conscauences ofPostulated Cracking I
l In the previous sections, a discussion of various aspects concerning the structural integrity of the 5
nozzle / vessel weld have been presented. In this section, additional discussion demonstrating
^
. _ =. -
~
GRAND GULF NUCLEAR STATION INSERVICE INSPECTION REQUIREMENTS INSERVICE INSPECTION SECTION 4 TEN YEAR PROGRAM RELIEF REQUESTS PAGE 6 OF 25 GRAND GULF NUCLEAR STATION UNIT 1 RELIEF REQUEST I-00014, REVISION 1 INSERVICE INSPECTION OF RE ACTOR PRESSURE VESSEL NOZZLE TO SHELL WELDS significant safety margin for this location even if an unlikely through-wall crack were to occur will 1
be presented.
j As discussed before, the limiting condition with respect to potential to failure is the nozzle bore radii and bore areas. The nozzle / vessel weld area is bounded by any analysis for the bore or blend radii areas.
Significant analysis has been performed for the bore and blend radii locations.
Therefore, the discussions provided in this section are a summary of the results determined for the limiting cases. It should be emphasized that a basic assumption in the design and licensing oflight water systems in the USA is that failure of the RPV need not be postulated as a design basis event.
Allowable Crack Size The basic requirement of Section XI of the ASME Code is that flaws greater than 10% of the critical flaw size is not permitted. Evaluations of a worst case thermal event in combination with pressure stress have shown that the lower bound fracture toughness of the A508 material is not exceeded eien for crack depths approaching the vessel thickness. Since flaw sizes in excess of the wall thickness have no physical significance, it was conservatively assumed that a crack depth equal to the thickness was critical and thus a Section XI allowable crack depth of 10% of wall thickness was established.
Regardless of the examination and repair programs in place to ensure that nozzle flaws do not I
exceed Section XI allowables, it is useful to postulate one or more nozzle flaws becoming very large without being detected in order to determine whether a critical condition could exist and cause rapid crack propagation. As mentioned eclier, the stress intensity factor for a crack at the blend radii never exceeded the lower bound fractare toughness even for a crack equal to the thickness of the vessel.
l l
Evaluations have been performed for an analogous case of cracking from a hole in a plate. The stress intensity factors as a function of through-wall crack length have been calculated. For large cracks (crack tip far away from the nozzle), the only contributing stress is due to pressure. The
(
intersection of the fracture toughness and stress intensity factor prescribes the critical flaw size.
The results of these calculations have shown that the critical crack size for each of the two cracks is
GRAND GULF NUCLEAR STATION INSERVICE INSPECTION REQUIREMENTS INSERVICE INSPECTION SECTION 4 TEN YEAR PROGRAM RELIEF REQUESTS PAGE 7 0F 25 GRAND GULF NUCLEAR STATION UNIT 1 RELIEF REQUESTI-00014, REVISION 1 INSERVICE INSPECTION OF REACTOR PRESSURE VESSEL NOZZLE TO SHELL WELDS i
i 29 inchen (total length of 58 inches). It is virtually inconceivable that the leakage associated with cracking of this magnitude could escape detection in an operating BWR. Thus a leak before break condition is assured for the vessel, even in the unlikely event that nozzle flaws grow to depths greater th m the Section XI allowables, as long as the vessel is at upper shelf temperature. Similar I
conclusions apply to the upset and emergency conditions with postulated crack lengths of 15 inches (30 inches total) and 11 inches (22 inches total), respectively, is required before rapid fracture could occt, r under these conditions.
Although the entire ASME Code-prescribed area was not ultrasonically examined, the ultrasonic data obtained can still be used to evaluate the potential for cracking. Figures 2 through 8 show typical areas of examination coverage for the various scanning techniques (Tables 1 and 2 provide specific quentities of coverage). It can be seen that at least one side of the weld and portions thereof are examined.
Results of previous examinations revealed no rejectable indications exceeding ASME Section XI criteria. In addition, nozzle blend radii are also examined, and to date no relevant ii.dications have been located. The results' of previous UT examinations are consistent with the discui sion provided in this request for relief.
Since no crackirg has been found at a nozzle blend radius or at the examined nozzle / vessel area, it is unlikely that indications would be present in the unexamined area between the examined vessel / nozzle we'd and the nozzle blend radius. There are no additional considerations at the unexamined area svhich would make cracking more likely than at the examined nozzle / vessel weld i
area. Therefore, it is concluded that examined areas of the nozzle / vessel weld area and the nozzle blend radii area are sufficient to identify any flaws that may occur.
V.
Specific relief request ed:
Permission is requested to perform ultrasonic examination of only those areas accessible with automated techniques for those 9 nozzle to vessel welds that are examined utilizing automated methods. Also, permission is requested to examine only those areas that are accessible with manual techniques for the 26 norzles that are examined manually.
~
GRAND GULF NUCLEAR STATION INSERVICE INSPECTION REQUIREMENTS i
INSERVICE INSPECTION SECTION 4 TEN YEAR PROGRAM RELIEF REQUESTS PAGE 8 OF 25
+
GRAND GULF NUCLEAR STATION UNIT 1 RELIEF REQUEST I-00014, REVISION 1 INSERVICE INSPECTION OF REACTOR PRESSURE VESSEL NOZZLE TO SHELL WELDS I
r l
VI.
Reasons why relief should be granted:
Relief as described within should be granted for the following reasons:
i 1.
The entire RPV was subjected to an ASME Section III hydrostatic test after fabrication.
2.
The entire RPV will be subjected to pressure testing in accordance with the requirements of ASME Section XI or Code Case N-498-1.
3.
The subject welds were volumetrically examined in accordance with ASME Section III during fabrication.
4.
There is no history of service induced flaws in these areas of the RPV other than those of the feedwater nozzles discussed within this request for relief.
l 5.
The areas being examined are the limiting areas of the nozzle to vessel configuration.
6.
The performance of supplemental manual examinations to supplement the nine nozzles that i
l received automated examinations would require significant expenditures of personnel exposure for a small increase of examined volume.
7.
The potential for initiation and propagation of s _cking has been discussed assuming both fatigue and stress corrosion cracking mechanisms. It was concluded by the use oflimiting l
analyses results performed for the feedwater nozzle blend radii, that cracking is unlikely at Grand Gulf nozzle / vessel weld locations. In fact, even ifit was hypothesized that these postulated cracks went undetected, a crack length of 58 inches was required before rapid crack growth was to occur during normal operation. It is unlikely that cracks of this size would go undetected. Therefore, a significant leak before break margin exists.
8.
Known techniques that examine the RPV welds from either the inside or outside surfaces i
will not provide any additional coverage beyond what is described in this relief request for the manual techniques.
o
= -. _ -... -..-_
. -. - - ~ - - - -. - -.
- - _ - - - - - -. - -. ~. -
GRAND GULF NUCLEAR STATION INSERVICE INSPECTION REQUIREMENTS i
INSERVICE INSPECTION SECTION 4 l
TEN YEAR PROGRAM
' RELIEF REQUESTS PAGE 9 OF 25 l
GRAND GULF NUCLEAR STATION l
UNIT 1 l
RELIEF REQUESTI-On014, REVISION 1 INSERVICE INSPECTION OF REACTOR PRESSURE VESSEL NOZZLE TO SHELL WELDS Vil.
Alternative testing:
As an alternative to examining the volumes required by ASME Section XI, the 35 nozzles subject to this relief request are examined within the limitations described in Tables 1 and 2. Nine nozzles are examined using automated techniques and 26 nozzles examined with manual techniques. In addidon to the ultrasonic examinations described for each of the nozzles, the reactor pressure vessel is pressure tested each refuel outage to the requirements of ASME Section XI and inspected with VT-2 qualified personnel for leakage. During RF08, pressure testing of the reactor coolant pressure boundary, which will include the subject nozzles, will be coaducted in accordance with Code Case N-498-1, i
i s
1 w
e
1 GRAND GULF NUCLEAR STATION INSERVICE INSPECTION REQUIREMENTS INSERVICE INSPECTION SECTION 4 TEN YEAR PROGRAM RELIEF REQUESTS PAGE 10 0F 25 GRAND GULF NUCLEAR STATION UNIT 1 RELIEF REQUEST I-00014, REVISION 1 INSERVICE INSPECTION OF REACTOR PRESSURE VESSEL NOZZLE TO SHELL WELDS Table 1 Code Coverage Based on Automated Examination of Nozzles to Vessel Welds N2 (B, C, D, E) Nozzles, Recire. Inlet
- u. TOTAL -
, 1 TOTAL?..
. % of TOTAL ;
AREA OF
% OFINNER n m -.........
3 AREA OF...
.. % OF,
SCAN
, T CODE E; CODE AREA CODE AREA ;
AREA OF INNER 1/4 T 1/4 T
' AREA OF '.
2 WEID /HAZ '
L WELD /HAZ ;
TYPE M AREA *
'J EXAMINED "
EXAMINED a INNERlidT EXAMINED EXAMINED
' WEIDIHAE" hEXAMINED i YEXAMINEDi i
0*
s.78.75 i V 26.80 in*
L34%i 18.37 in 6.89 in 38 %
- - 15.40 in* -
10,40 in
- 3 %t 2
2 3
, finO
- fe d
U I
e
+
45* T-SCAN 378.75J
!50.36 in*!
J64 %i 18.37 in 17.78 in 97 %
" 15.40 in* >
E 13.10 in' =
- 85%'!
2 2
2
' fin 4 60* T-SCAN
- 78.75;
- 59.29.in R75%
18 3" h 18.37 in 100 %
15.40 in':e t 14.00.in 91 W 2
1 8
. Fin 4
3 2
a i
45* P-SCAN 3 78,75..
L35 01 in J, T44%(
18.37 in 9.60 in 52 %
,1,5.40ll.n,' : h7i10 in' E46%1
- e. 3,
~
,~ao n tn o 2
2 2
3 60* P-SCAN 1,78.75; i35.01 in )
"1447e3 18.37 in 11.02 in 60 %
15.40 in /.
112.20 in.
L79%L
' tin i.
t
'q n,
N3 (A, B) Nozzles, Steam Outlet JTOTAL
. TOTAL.,
%ofTOTAL AREA OF
% OFINNER AREA OF s
... - % OF...
SCAN ECODE.<
CODE AREA:
' CODE AREA AREA OF LNNER 1/4 T 1/4 T
.rAREA OF C
- WElR /HAz;
.: WELD /lLG E TYPE
'MAREA
'EXAhHNED:
' EXAMINED INNER ild T EXAMINED EXAMINED
' WEID IIIAZ'
'EXAMNED EXAMINED 3
2 2
2 0*
482.99-31.20 in 4 h38 % c 19.52 in 7.32 in 38 %
'16.17 in x1,00 in4 6%1 Fina
..s on 45* T-SCAN s 82.99 'i E 54.94 in' -
t 66% L 19.52 in 19.12 in 98%
- 16,1714 i
- 14,10in 87 % 4 2
2 2
a 2
- tin ;
a 2
2 60* T-SCAN i82.99 6
,.63.70 in i 77L 19.52 in 19.52 in 100 %
i16;17 int a14.69 inh b 91% 4 s
o.in <
3 2
2 a
z 45* P-SCAN 182.99 s
- t. 3138 in."
r38%r 19.52 in 8.57 in 44 %
16.17 in /
2.20 in :
14 % -
- in'?
l l
60* P-SCAN J 82.99 )
E 31.38 int
- 38 %-
19.52 in 11.11in 57 %
16.17 in.
9.90 in -
61% :
2 2
2 a
,g h
I i
l l
-__ - - - -. - -.. ~.. _. - -
GRAND GULF NUCLEAR STATION INSERVICE INSPECTION REQUIREMENTS I
INSERVICE INSPECrlON SECTION 4
)
TEN YEAR PROGRAM RELIEF REQUESTS l
PAGE 11 OF 25 GRAND GULF NUCLEAR STATION UNIT 1 RELIEF REQUEST I.00014, REVISION 1 INSERVICE INSPECTION OF REACTOR PRESSURE VESSEL NOZZLE TO SHELL WELDS N4 (A, B) Nozzles, Feedwater Inlet aTOTAL.
.1 TOTAL-
- % of TOTAL -.
AREA OF
% OFINNER
. ARF.A OF,
z % OF.
SCAN R. CODE-
- CODE AREA.
CODEAREA' AREA OF INNER l/4 T 114 7 iAREADF,J
- WElb /HAZ 2 WELD /HAZ TYPE
" AREA
i EXAMINED
/ EXAMINED J INNER 1/4 T FXAMINED EXAMINED
. WElb IHAZ ~
i EXAMINEDi EXAMINED -
Dih2f,,, ' ' ',, 'a 2
[21.49 in 4 36 W 14.08 in 5.28 in 38 %
1l12.70 in'?
? 0.53 in*J
_ :4%
0*
n60.16 i
< 71
? ' '*
e s60.16 138.21 in'y g 64y.3^,
14.08 in 13.49 n 96 %
i 12.70 in' ~
$10.59 in'"-
L83E 2
2 45' T-SCAN
- M n')j
[]'
~'
2"'
o 60* T-SCAN 260.16 i n 44.87. in
75 E 14.08 in 14.08 in 100 %
.12.70 in -
n11,40 in'
- 90 % >
z 2
2 3
7;g,
2 a
2 2
2 45' P-SCAN u.60.16 L
- 26.87 in s 145 % ;
14.08 in 6.98 in 50 %
12.70 in,
g 6.20 in 4 549 % S 2
lin.1 i
a 2
60* P SCAN O 60.16 y 726.87. in* (
W 45 %1.
7 14.08 in 8.49 in 60 %
12.70, i,nk ? 10.52 in,'
o83 % "
l N6 (A) Nozzles, RHR/LPCIInlet T
E OTALi
,..t. TOTAL y,
.%ofTOTAL AREA OF
% OF INNER
' AREA OF..
, ? % OF z SCAN
,pCODEjj
- CODE AREA-CODE AREA _
AREA OF INNER 114 T 1/4 T LAREAOF..
3 WELD /HAZ '
. ' WELD /IIAZ "
TYPE
'AREAN L EXAMINED!
I EXAMINED INNER I/4 7 EXAMINED EXAMINED WRID /IIAZ.
TEXAMINEDl
' EX AMINED 3
2 a
2 2
0 L 60.167 422.30 in "
(37%.
14.08 in 5.28 in 38 %
- 12.70 in 0.80 in
.:6W,
1 2
.1 M in :
2 a
2 45* T-SCAN J 60.16 L 39.05 in
.65 %..
14.08 in 14.08 in 100 %
c 12.70 in*f 10.80 in a 85 %
nin.
60* T-SCAN v60.16 ?
c 45.37 in "
,75%
14.08 in; 14.08 in 100 %
- 12.70 in 1161 in 91 %
3 2
2 3
isin4 4
2 3
2 2
45' P-SCAN t60.16)
- 27.46in J r n 46 %L 14.08 in 7.09 in 50 %
12.70 in" -
- 6.90 in* '
i54 % -
pgh2?
,4 3
2 2
,160.16? i27.46 in ~
l46 0 14.08 in 8.61in 61%
- 12.70 in's 11.42 in* ~
i 90 %.
60* P-SCAN l
ine r
l
{
i
)
)
4 4
i i
k
GRAND GULF NUCLEAR STATION INSERVICE INSPECTION REQUIREMENTS INSERVICEINSPECTION SECTION 4 TEN YEAR PROGRAM RELIEF REQUESTS PAGE 12 OF 25 GRAND GULF NUCLEAR STATION UNIT 1 RELIEF REQUEST I-00014, REVISION 1 INSERVICE INSPECTION OF RE, ACTOR PRESSURE VESSEL NOZZLE TO SHELL WELDS Table 2 Code Coverage Based on Manual Examination of Nozzles to Vessel Welds N1 (A & B) Nozzles, Recire. Outlet SCAN qCODEI
. "TOTALn
.%er10TAL.
AREA OF
% OFINNER
,.;u.
J AREAOF x
. % OF: f rTOTAla CODE AREA:
CODE AREA -
AREA OF INNER 1/4 T 1/4 T
- AREAOF :..
- WEIR /IIAZ WE'R/HAZ
TYPE
'd AREA '
EXAMINED
- EXAMINED "
INNER 1/4 T EXAMINED EXAMINED WEIS /IIAZ -
- EXAMINED '
EX AMINED -
a 2
2 2
0*
77930?
L 37.76 in t 447W l8.37 in 9.93 n 54 %
'15.40 in ?
10.05 int
- 65% r j
- g,24
,w 2
2 a
2 i
z 45' T-SCAN 87930 W 159.65 in /
z75 W 18.37 in 18.37 n 100 %
- 15.40 in
- 15.24 in y 99 y lnhg 'gg,
' ~
, < wp 2
i j
60* T-SCAN E79;70 b
" 63J4 in'$
180% -:
18.37 in 18.37 in 100 %
- 15.40 in.
.15.24 in 99.% ?
2 2
2 z
PQn' O' N '
'N
' i i
45* P-SCAN LJ9,70.L,
_k 3.7.,76_ i. n.' "
- 47. W.
18.37 in 9.93 in 54 %
B 15.40 in'f i10.05.in J J. 65%, r 2
2 2
60 P-SCAN 43930m 1.37.76 in,';
E47%
18.37 in 9.93 n 54 %
415,40 in's
- 3. 0~.05. in.'. -., J. 5W-2 2
n e p N2 (A, F, G, H J, K, M, N) Nozzles, Recire. Inlet
. TOTAL;r
.eTOTAL.
% of10TAL-AREA OF
% OFINNER AREA OF
% OF -
'i CODE l SCAN
- CODE AREA CODEAREA AREA OF LNNER 1/4 T 1/47 AREA O F -
. WEIR /HAZ.
t WELD /IIAZ -
TYPE
- AREA'-
FX AMINED.
EXAMINED INNER ll4 T F.XAMINED EXAMINED WEID /itAZ EX AMINED :
EX AMINED -
a 2
2 3
2 0*
+7835
- 38.48 in
-49 % =
18.37 in 9.93 in 54 %
15.40 in 10 05 in 65 %
' ' " l'n'4 i
3 2
2 a
45" T-SCAN 17835 e L 62.84 in.-
80 %
18.37 in 18.37 in 100 %
15.40 in -
15.24 inh 99W Tin's 2
2 3
60* T-SCAN
+78.75 :
t 66.88 in' i L85 W 18.37 in 18.37 in 100 %
15.46 in -
"15.24 in' -
. 99 % L
- Lin'3 N
2 2
2 45" P-SCAN B7835?
e38.48 ink
-.49 %
18.37 in 9.93 in:
54 %
15.40 in.
-110.05 in 65 %
,gn E 2
60* P-SCAN e7835 4
, 38.48 in' 49 W 18.37 in:
9.93 n 54 %
115.40 in
- 10.05 in
.65 W 2
z 2
2 Jin ;
b i
GRAND GULF NUCLEAR STATION INSERVICE INSPECTION REQUIREMENTS INSERVICE INSPECTION SECTION 4 2
i TEN YEAR PROGRAM RELIEF REQUESTS PAGE 13 OF 25 l
GRAND GULF NUCLEAR STATION i
UNIT 1 4
i RELIEF REQUEST 100014, REVISION 1 1
i INSERVICE INSPECTION 1
OF REACTOR PRESSURE VESSEL NOZZLE TO SHELL WELDS 1
I i
l N3 (C, D) Nozzles, Steam Outlet
{
qTOTAL:
TOTAL.
, % orTOTAl, AREA OF
% OF INNER AREA OF :
. % OF SCAN tCODEe CODE ARTA CODE AREA:
AREA OF INNER 1/4 T 1/4 T
' AREA OF F e WEID/HAZ'
- WEIAHAZ ?
3 d
TYPE X" AREA'd
- EXAMINED ~
t EXAMINED' INNER 1/4 T EXAMINED EXAMINED
' WE1D / HAE
' EXAMINED.
' EXAMINED
{
O' q 82.990 L40.50 in c a
2 2
3 2
}
a ;3 ; ~
~'
L49 %i 19.52 in 10.24 in 52 %
.o 16.17 in ;
(8.32 in
- 51% ;
2 l
45' T-SCAN 182 99; 65.38 in -
q79 %f 19.52 in#
19.52 in 100 %
Ll6.17in J
.16.01 in' 199W 2
2 2
fg,7y
>qri 7
60* T-SCAN 182.99 L a 70.23 in*/
- 85 %,
19.52 in 19.52 in 100 %
.bl6.17 in*f s 16.01 in J
! 99 % 1 2
2 2
7 g,27
,g
~;
45' P-SCAN t 82.9,91 ': 40. 50 lid U49.%Y.
19.52 in 10.24 in 52 %
c 16.17 in.2 2
a 2
E8;3.2, in 1 s,51% /
m
~ 7 a
60' P-SCAN J:82.99 ?.
F. 40.50. in.,3 2
a 2
r
,C 49 % 0 19.52 in 10.24 in 52 %
- 16.17 in ;
.8.32 i,n*r
.%, 5.1%
+
c -
1 N4 (C, D, E, F) Nozzles, Feedwater Inlet yTOTAlc
...: TOTAL.
%eflOTAL-AkEA OF
% OF INNER p.; AREA OF..
r... % O F ;,..
t SCAN
!h CODE i CODE AREA" CODE AREA' AREA OF INNER 1/4 T 1/4 T F AREAOF&
L WElm /HAZ 4
+WEIAHi!.f TYPE WAREA.
- EXAMINED i EXAMINED -
INNER l/4 7 EXAMINED
' EXAMINED
' WEID / HAEl
' EXAMINED J EXAMINFD r 2
2 2
3 3
O' x 60.16?
! 29.02 in ?
148% p 14.08 in 7.55 in 54 %
s 12.70 in c s8:13 in #
? 64 % c
~
' iin*J 4
=
2 2
2 3
3 45* T-SCAN 0 60.'i6 146.92 in 378 % %
14.08 in 14.08 in 100 %
.12.70 in T
- 12.53 in C99 %
M in,_
2 60' T-SCAN
- 60.160 i 50.33 in* -
84 %
14.08 in 14.08 in 100 %
L 12.70 in".
- 12.53 in -
"99 % I 2
2 2
=
- p g
~
45' P-SCAN 1, 60.16'.
[29.02 int' 248% ~-
2 a
a 2
2~
~ '-
~
14.08 in 7.55 in 54 %
- 12.70 in ;
8.13 in l
..64.% ;
60* P-SCAN S 60.1,6 i 129. 02 in*>
~-L48% P-14.08 in 7.55 in 54 %
! 12.70 in ;
8.13 in's z
a 64 % ~
t 4
GRAND GULF NUCLEAR STATION INSERVICE INSPECTION REQUIREMENTS INSERVICE INSPECTION SECTION 4 TEN YEAR PROGRAM RELIEF REQUESTS PAGE 14 OF 25 GRAND GULF NUCLEAR STATION UNIT 1 RELIEF REQUEST I-00014 REVISION 1 INSERVICE INSPECTION OF REACTOR PRESSURE VESSEL NOZZLE TO SIELL WELDS i
N5 (A & B) Nozzles, Core Spray Inlet (LPCS, NSA; HPCS, NSB)
'; TOTAL =
. TOTAL.
% of TOTAL AREA OF
% OF LNNER AREA OF:.
.. -- % OF t SCAN jiCODE4
' CODE AREA -
' CODE AREA AREA OF INNER 1/4 T 1/4 T
- O.REA OF 1
- . WEI.D AIAZ J i..WEIA1LAZ L EXAMINED i TYPE
'7 AREA E L
" EXAMINED !
INNER 814 T EXAMINED F.XAMINED WFID f ilAE '
~ EXAMINED
EXAMINED -
2 2
2
" Win M
' ' ' ' '29.02 in / :i E:48% L 14.08 in 7.55 in 54 %
- 1230 in* '
- 8.13 in*:
" 64.% :
0*
160.16; 2
<,J i
+
2 2
45* T-SCAN
- 60.161 L 46.92 in* "
"g~78% ;
I4.08 in 14.08 in 100 %
- .1230 in*?
L 12;53 in'.
199 % )
Win..g l
'~
2 60' T-SCAN
[60,16.1 150.33 i. n*J 84.%,,.:
14.08 in 14.08 in 100 %
L 123.0 in ~
a 12.53 in.* ~.j99. %.
2 2
z
. 27
~
m s
~
45* P-SCAN 160.16 6 129.02 in*/
248%;
14.08 in 7.55 in 54 %
91230 in*J E 8.13 in'?
.T64 WL 2
a i gigg"c j sy r
~
~,
o 60' P-SCAN E60.16f E29.02 in*f J48'V.n 14.08 in 7.55 in 54 %
- 1230 in*+
18.13. in*/
364 % M*
2 2
2
, t in ; >
g,> y;-
N6 (B, C) Nozzles, RHR/LPCI Inlet
>:: TOTAlq
.-' TOTAL r
%ofTOTAL AREA OF
% OF LNNER
- AREA OF :'.
r % OF L SCAN A CODEW CODE AREA ~
!CODEAREA AREA OF INNER lid T 1/4 T
. AREA OF i 1WElb/HAE9 WELD /HAZ.
TYPE NAREA3 L EXAMINED i EXAMINED INNER t/4 T EXAMINED EXAMINED WEID / HAZ.
E EX AMINED 1 I EXAMINED ;
0*
J 60.16 <
129.02 in.E 148 % i 14.08 in:
7.55 in' 54 %
- 12 70 in J.8.13 in 64 % '
2 z
z Lin ;,
'l
~
2 1
u a
a 2
45' T-SCAN
[60.16; E46.92 in
%' 78%
14.08 in 14.08 in 100 %
i 12.-70 in*4 E 12.53 in*?
' 99 %
i gg,2j,
e'+
a 2
2 2
2 60' T-SCAN
- 60.16" 150.33 in
, c 84%
14.08 in 14.08 in 100 %
e 1230in C12.53 in. "
9 99 % :
" fin 1 2
2 2
2 a
a 45' P-SCAN
- 60.161 729.02 in 7 (48%
14.08 in 7.55 in 54 %
1230in
~ 8.13 in 64 %-
' 2 in: t a
2 a
2 2
60* P-SCAN W 60.16 =
a 29.02 in,
,i48%
14.08 in 7.55 in 54 %
" 12.70 in 3 8.13 in '
64 %
"lin 1 rj 2
. _ - _ - ~
GRAND GULF NUCLEAR STATION INSERVICE INSPECTION REQUIREMENTS INSERVICE INSPECTION SECTION 4
{
TEN YEAR PROGRAM RELIEF REQUES TS i
PAGE 15 0F 25 i
GRAND CULF NUCLEAR STATION j
UNIT 1 4
i j
RELIEF REQUEST 100014, REVISION 1 INSERVICE INSPECTION OF REACTOR PRESSURE VESSEL NOZZLE TO SHELL WELDS j
i N7 Nozzle, RCIC To ) Head Spray Inlet
.L TOTAL :,
,.eTOTAL w
- % ofTOTAL' AREAOF
% OF LMNER 6 AREA OF -
. L % OF.
SCAN
[CODEI
- CODE AREA"
' CODE AREA AREA OF INNER 1/4 T 1/4 T
" AREAOF.C WELD /HAZ '
i WELD /HAZ F AREA' E EXAMINED '
! EXAMINED :
INNER 114 T EXAMINED EXAMINED WEID/HAZ TYPE 1
EXAMINED
- EXAMINED z
2 2
3 0*
L20.808
- 10.46 in
- 50E 4.71in 2.63 in 56 %
"5.96 in.
3.91 in'
' 66%
, gf1_ /
^
^
2 2
2 3
45* T-SCAN f20.80 J l16.34 in,
J79%;
4.71in 4.71in 100 %
- 5.96 in' -
15.74 in ;
, ! 9.6% ;
e In.
~
60* T-SCAN 1,20,80i
- 17.,46 in* ;,94%
4.71in 4.71in:
100 %
c 5 96 in' -
a 2
, 5.74 in /
? 96%
C in,
, g; y 2
, y a
2 3
45' P-SCAN i20.80 L i10,46 in'*
s 4.71in 2.63 in 56 %
45,96 in'?
13.91inJ
,166 W
/50 % 1 r,
m m-g gg2S - 9m 2
2 3
60* P-SCAN 020,80" 410.46 i.n's 150% l:
4.71in 2.63 in 56 %
J 5.% in'-
- 3.91. In. -
2 66 %,
qgg2j c
N8 Nozzle, Top Head Spare 10TAL.i
.. TOTAL 7
' % of TOTAL AREA OF
% OFINNER AREA OF s
. % OFa SCAN
!sCODE4 1 CODE AREA 4
' CODE AREA' AREA OF INNER 1/4 T 1/4 T
" AREA 0F -0 L WELD /IIAZ '
WEIAlltAZ ?
TYPE WAREAi
' EXAMINED :'
t EXAMINED '
INNER 114 T EXAMINED EXAMINED WEID #1tAZ '
EXAMINED -
EXAMINED -'
3 2
2 2
0*
a 20.80 L E10.46 in J S 50W 4.71in 2.63 in 56 %
' 5.96 in 3.91inc
- 66 %,
.lin E s
3 2
a 2
a 45* T-SCAN 120.80:
T16.34 in r
$79%
4.71 in 4.71in 100 %
i 5.96 in '
5.74 in 2 96 %
,;g,Tr 51n2 2
2 3
2 60* T-SCAN c 20.80 ?
>:,17.46 in..
3 g4p 4.
4.71in 100 %
15.96 in J e5.74 in,-
o96 % :
7gg1fi; 45' P-SCAN "20.801 110.46 in 4 e 50%
4.71in:
2.63 in 56 %
"5.96 in' -
3.91 in "
166 %.
2 a
a
'in t
2 2
2 2
60* P-SCAN
-20.80' 1 10,46 in 1
. SOE 4.71in 2.63 in 56 %
- 5.96 in 3.91in '
- 66 %
, rin ;;:
2 i
GRAND GULF NUCLEAR STATION INSERVICE INSPECTION REQUIREMENTS INSERVICE INSPECTION SECTION 4 TEN YEAR PROGRAM RELIEF REQUESTS l
PAGE 16 OF 25 GRAND GULF NUCLEAR ST/. TION UNIT 1 I
RELIEF REQUEST I-00014, REVISION 1 l
INSERVICE INSPECTION OF REACTOR PRESSURE VESSEL NOZZLE TO SHELL WELDS i
l N9 (A & B) Nozzles, Jet Pump Instrumentation Outlet l
. TOTAles-
.,.x TOTAL,,
- ,% ofTOTAL AREA OF
% OFINNER r AREA OF.J..
.,.: % OF =.,
I y
,s-.~
a SCAN R:CODEg*
, CODE AREA CODE AREA-AREA OF INNER 1/4 T 1/4 T
.f AREA OF A (WELD /HAZ 5
.i WE!.D41AZ j TYPE
" AREA EXAMINED '
EXAMINED '
INNER l/4 T EXAMINED EXAMINED
? WEID / HAZ'
' EXAMINED -
' EXAMINFD :
0*
B78.29 t 137.59 in't n 148W '
18.37 in 9.76 in 53 %
115.40in J
- 49,82 in v f' 64%i 2
2 2
3
[g,2;d
%;r J
- i., ( p i '
~ >
45* T-SCAN a;78.29 E d 62.00 in*c 179R 18.37 in 18.37 in 100 %
i 15.40 in ?
115.24 inh
$99 % ?
2 2
2
- Sinta, 9:,
60* T SCAN n78.29 A 3 66.22 in* :
>s85 %
18.37'in:
18.37 in 100 %
< 15.40 in s 2
2
[in g 4'
a 15.24 in..
c 99 y,
2 y
3 a
2 z
3 45' P-SCAN t78.29 ;
L37.59 in 0 148%,
18.37 in 9.76 in 53 %
15,40 in 9,82 in :-
,64 %
(ga j '
' ' ', f s
e 3
a 3
60* P-SCAN A78.29 L
/ 37.59 in E48%
18.37 in 9.76 in; 53 %
r15.40 in's a 9.82 in c.
P64 %
a 3:3 Fin,m t
NIO Nozzle, Control Rod Drive (Capped) aTOTAL-.
.1 TOTAL u
.% of TOT AL AREA OF
% OFINNER a.:m
- AREAOF...
.. c % OF m SCAN dCODE'
., CODE AREA '
CODE AREA' AREA OF INNER t/4 T 1/4 T U ARIA'o0FT
[ WELD /HAZ2 I WEID/I@
TYPE
ARE4 c J EXAMLNED '
! EXAMINED :
INNER t/4 7 EXAMINED EXAMINED
' WEID IHAZ FXAMINED L EXAMINED' l
0*
T 63.14.;
r.30.09. in c.48 *4 3 14.08 in 7.53 in:
53 %
12,70. ic. 2.
_ g,4,2 in
~ 66W 2
2 3
~ -.
3 2
2 2
3 45* T-SCAN i63.141~
149.00 in J L78 %'~
14.08 in 14.08 in 100 %
- 12.70 in.
.12.57 in 199 %
2; J
~ - ' '
3 2
2 3
.12.57 in' -
J9%-
l 60* T-SCAN 163,14; 152.92 in H 184 W:
14.08 in 14.08 in 100 %
- 12.70 in r "in y t
p 4
z a
3 45" P-SCAN
? 63.14.i
- 30.09 in'J 148.% i 14.08 in 7.53 in 53 %
L 12.70 in*c
> 8.42 in s t 66%.
?in')
60* P-SCAN 4 63.14 >
J30.09 in31, 148 W 14.08 in 7.53 in 53 %
- 12.70 in r
. 8.4. 2.in c.
.66%..
2 a
2 2
e 3
i l
d
GRAND GULF NUCLEAR STATION INSERVICE INSPECTION REQUIREMENTS INSERVICE INSPECTION SECTION 4 TEN YEAR PROGRAM RELIEF REQUESTS PAGE 17 OF 25 GRAND GULF NUCLEAR STATION UNIT 1 RELIEF REQUEST I-00014, REVISION 1 INSERVICE INSPECTION OF REACTOR PRESSURE VESSEL NOZZLE TO SHELL WELDS N16 Nozzle, Vibration Instrumentation (Flanged)
- TOTAL j,
. TOTAL +,.
..% ofTOTAL AREA OF
% OF LNNER
. c AREA OF.
..-..? % OF?.
SCAN OCODE' CODE AREA.
' CODE AREA AREA OF INNER 1/4 T 1/4 T
- 'AREAOF-1 i WEID /HAZ'.
? WEID/HAZ
TYPE IAREA'
' EXAMINED '
2
' EXAMINED :
INNER lid T EXAMINED EXAMINED
' WEID / HAE,
E EXAMINED "
- EXAMINED '
0*
g 84,46 /
iL41.25 int E49 % :
19.52 in 11.69 in 60 %
16.17in J
- 10.58 in '
- 65% -
a a
3 a
Min,i '
g
'g 2
3 l
l 45' T-SCAN 184.46 x-i; 61.83 in
,173% g 19.52 in 19.52 in 100 %
116.17jn ?
116,01 in f
,;; 99% r 2
2 2
a 3; p
(< -
- 3 60* T-SCAN j 84,46 !
- 67.83 in*
5:80 % i-19.52 in 19.52 in 100 %
316.17 in f g.16,01 in* '
s 99% ^
2 2
2
,"In 4 3 ';',,'
2
~
45' P-SCAN i 84,46 ;
i.41.25 ini v49 % (
19.52 in 11.69 in 60 %
116,17in ?
/10.58 in.H L 65%-
2 2
2 2
- g,y
+.
3 2
2 a
3 60* P-SCAN 1 84.46 :
9 41.25 in ~:
39 %'
19.52 in 11.69 in 60 %
16.17 in 10.58 in ; -
L 65% ;
.y ;,
i i
f 4
4
GRAND GULF NUCLEAR STATION INSERVICEINSPECDON REQUIREMENTS INSERVICEINSPECDON SECHON 4 TEN YEAR PROGRAM RELIEFkEQUESTS PAGE 18 0F 25 GRAND GULF NUCLEAR STATION UNIT 1 RELIEF REQUESTI 00014, REVISION 1 INSERVICE INSPECTION OF REACTOR PRESSURE VFSM. Nnm.F 1T) SHM L WM nS ij l I
i'.A 1 e
'n1 m e,,, r,,2 * "** "*" 'N'****'
r, - shou ter heads swetees rj = naaste insWe earner redhas l
l I
i
. r,ts t,13
?
N O
j BC D
~~
i
~ _,
- e. i r- ~
T a
I e
l
)
4 j?
y,N I
I
/l N
j \\
/
l
\\
j,"n.n___IQ ' ) ul lI 1
/,
i
\\
n; o
i I
g u,-
w a
e et d
Gedding I
rf 1
O
/
\\
\\
/
\\
\\
- i r
_1 am. s.o.
N
,/
A-s-c-o-a-p-o-H ca erno.,
EXAMINATION ftEGION (Nees (111 8WAammaaTION VOLUME (Nets (211 rwer i.eesi ses,.i.i cm m iswese.s,ses.
sm.
Name w as,reme
- +4.s Needs insbes senser,eglen ha se.O.P 4
i FIGURE 1 i
l l
1
GRAND GULF NUCLEAR STATION INSERVICEINSPECTION REQUIREMENTS INSERVICE INSPECTION SECTION 4 TEN YEAR PROGRAM RELIEF REQUESTS PAGE 19 OF 25 l
GRAND GULF NUCLEAR STATION UNIT 1 RELIEF REQUESTI-00014, REVISION 1 INSERVICE INSPECTION OF REACTOR PRESSURE VESSEL NOZZLE TO SHELL WELDS Typical Manual Examination Scan Plots Manual Scan Coverage,0* Straight Beam Manual Scan Coverage,45' Angle Beam (P-Scan)
Manual Sean Coverage,60* Angle Beam (P-Scan) l l
l Exam Volume Nozzle lf ';l Examined Manually l
l Near Fictd l
1P mf$&rrwyf,
~
LDU i.
H L-.K @wlff }
W Vessel Wall d!
p I Alh a, Di l +--*
+- 4l "
Inner 25%
1/2 T 1/2 T Weld Centerline FIGURE 2
GRAND GULF NUCLEAR STATION INSERVICE INSPECTION REQUIREMENTS INSERVICE INSPECTION SECTION 4 TEN YEAR PROGRAM RELIEF REQUESTS PAGE 20 OF 25 GRAND GULF NUCLEAR STATION UNIT 1 RELIEF REQUEST I-00014, REVISION 1 INSERVICE INbPECTION OF REACTOR PRESSURE VESSEL NOZZLE TO SHELL WELDS J
Typical Manual Examination Scan Plots 4
Manual Scan Coverage,45' Angle Beam (T-Scan) i Exam Volume Nozzle lf 3l Examined Manually Near Field o
I
')
., g
[!
khl Vessel Wall
}
b;u 21b &Id: pd4 l 4--+
+- -+f Inner 25%
1/2 T 1/2 T Weld Centerline FIGURE 3
l l
l GRAND GULF NUCLEAR STATION INSERVICE INSPECTION REQUIREMENTS l
INSERVICE INSPECTION SECTION 4 l
TEN YEAR PROGRAM RELIEF REQUESTS PAGE 21 OF 25 GRAND GULF NUCLEAR STATION UNIT 1 RELIEF REQUESTI-00014, REVISION 1 INSERVICE INSPECTION OF REACTOR PRESSURE VESSEL NOZZLE TO SHELL WELDS l
i Typical Manual Examination Scan Plots Manual Scan Coverage,60' Angle Beam (T-Scan) l l
l I
i l
l l
l Exam Volume Nozzle l? j Examined Manually 1
Near Field g,v# kdif$7?f$ "
g
,1L 9 3 hk1 M b hbhj p# mp l 4--*
- -.+l '
Inner 25%
i 1/2 T 1/2 T Weld Centerline FIGURE 4
W GRAND GULF NUCLEAR STATION INSERVICE INSPECTION REQUIREMENTS INSERVICE INSPECTION SECTION 4 TEN YEAR PROGRAM RELIEF REQUESTS PAGE 22 OF 25 GRAND GULF NUCLEAR STATION i
UNIT 1 RELIEF REQUEST I-00014, REVISION 1 INSERVICE INSPECTION OF REACTOR PRESSURE VESSEL NOZZLE TO SHELL WELDS i
l l
Typical Automated Examination Scan Plots j
]
Automated Scan Coverage,0* Straight Beam i
)
Exam Volume Nozzle l: fl Examined Automated Near Field 1P t+Txf Ws 't-
- p
- 1 li Vessel Wall l.;
- }
l# h-e+:
l - -+
.- -+l "
Inner 25%
1/2 T 1/2 T Weld Centerline FIGURE 5
GRAND GULF NUCL EAR STATION INSERVICE INSPECTION REQUIREMENTS INSERVICE INSPECTION SECTION 4 TEN YEAR PROGRAM RELIEF REQUESTS PAGE 23 OF 25 GRAND GULF NUCLEAR STATION UNIT 1 RELIEF REQUEST I-00014, REVISION 1 INSERVICE INSPECTION OF REACTOR PRESSURE VESSEL NOZZLE TO SHELL WELDS i
Typical Automated Examination Scan Plots Automated Scan Coverage,45* Angle Beam (P-Scan)
Automated Scan Coverage,60* Angle Beam (P-Scan) j t
i Exam Volume i
Nozzle l
lt
]
Examined Automated Near Field v
fh}kc]$]j 9
Vessel Wall
>wj 1 emm s l+-.4 4-- 4l Inner 25%
1/2 T 1/2 T Wcld Centerline FIGURE 6
GRAND GULF NUCLEAR STATION INSERVICE INSPECTION REQUIREMEMIS INSERVICE INSPECTION SECTION 4 l
TEN YEAR PROGRAM RELIEF REQUESTS PAGE 24 OF 25 GRAND GULF NUCLEAR STATION UNIT 1 i
RELIEF REQUEST l-00014, REVISION 1 l
l INSERVICE INSPECTION OF REACTOR PRESSURE VESSEL NOZZLE TO SHELL WELDS Typical Automated Examination Scan Flots i
Automated Scan Coverage,45* Angle Beam (T-Scan) l i
i l
i l
Exam Volume i
Nozzle l.
d Examined Automated l
Near Field A {:. m?]b '
e
- N
- iij Vessel Wall Mb II:t d J
- ,c 414 a
l.--+
" l+- 4l '
Inner 25%
1/2 T 1/2 T Weld Centerline FIGURE 7
GRAND GULF NUCLEAR STATION INSERVICE INSPECTION REQUIREMENTS INSERVICE INSPECTION SECTION 4 o
TEN YEAR PROGRAM RELIEF REQUESTS PAGE 25 OF 25 GRAND GULF NUCLEAR STATION UNIT 1 RELIEF REQUESTI-00014, REVISION 1 INSERVICE INSPECTION OF REACTOR PRESSURE VESSEL NOZZLE TO SHELL WELDS l
Typical Automated Examination Scan Plots Automated Scan Coverage,60' Angle Beam (T-Scan) i t
t I
l l
l l
Exam Volume Nozzle l
li 1l Examined Automated i
f Near Field i
l I L "mmp o
y-u5
,,,f,a ga;
-94 Vessel Wall i
gaa,
- sl c j
l
}!s
@Wp
- i l+-*
4-4l '
Inner 25%
1/2 T 1/2 T a
Weld Centerline FIGURE 8
-