CPGL CO PLANT PERFORMANCE DATA SYSTEM PAGE
.1
' RUN DATE ~ 02/01/93.
APPENDIX B - AVERAGE DAILY POWER LEVEL.
RPD39-000;
~ RUN., TIME 12:38 40 BRUNSWICK UNIT 1 DOCKET NO. 050-0325 COMPLETED BY RONALD RUMPLE TELEPHONE (919)457-2752 JANUARY-1993 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET)
(MWE-NET) 1
-5 17
-10 2
-7 18
-11 3
-10 19
-11 4
-10 20
-7 5
-10 21
-10 6
-11 22
-11 7
-10 23
-11 8
-10 24
-11 9
-10 25
-11 10
-9 26
-11
-11
-9 27
-10 12
-10 28
-11 13
-10 29
-11 14
-10 30
-11 15
-11 31
-11.
16
-11 1.16 9302110452 930202 PDR ADOCK 05000324 R
PDR i.
+
CP&L CO PLANT PERFORMANCE DATA SYSTEM
'PAGE-1L
_RUN DATE 02/01/93' OPERATING DATA REPORT RPD36-000 RUN,TIMB. 12:38:41
-BRUNSWICK UNIT 1 DOCKET-NO. 050-0325
-COMPLETED BY RONALD RUMPLE OPERATING STATUS TELEPHONE (919)457-2752
- 1. UNIT NAME: BRUNSWICK UNIT 1 NOTES -There are 560t fuel bundles
- 2. REPORTING PERIOD: JANUARY 93 in the Reactor Core, 1090 BWR and-
- 3. LICENSED THERMAL POWER (MWT) : 2436 160 PWR spent fuel bundles in the
- 4. NAMEPLATE RATING (GROSS MWE): 867.0 Fuel Pool, and 108 fuel bundles in 5.-DESIGN ELECTRICAL RATING (NET MWE): 821.0 the new fuel storage vault.
- 6. MAX DEPENDABLE CAPACITY (GROSS MWE) : 791.0
- 7. MAX DEPENDABLE CAPACITY (NET MWE): 767.0 8.'IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, j
GIVE REASONS:
9.
POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE):
j
- 10. REASONS FOR RESTRICTION IF ANY.
THIS YR TO CUMUL MONTH DATE ATIVE l
- 11. HOURS IN REPORTING PERIOD 744.00 744.00 139176.00
- 12. NUMBER OF HOURS REACTOR CRITICAL
.00
.00 87881.32
- 13. REACTOR RESERVE SHUTDOWN HRS
.00
.00 1647.10
- 14. HOURS GENERATOR ON LINE
.00
.00 84201.37
- 15. UNIT RESERVE SHUTDOWN HOURS
.00
.00
_.00'
- 16. GROSS _ THERMAL ENERGY GEN. (MWH)
.00
.00 183021943.70:
-l
- 17. GROSS ELEC. ENERGY GEN. (MWH)
.00
.00 60019285.00
- 18. NET ELEC. ENERGY' GENERATED (MWH)
-7484.00
-7484.00 57709722.00:
- 19. UNIT SERVICE FACTOR
.00
.00 60.50 J
- 20. UNIT AVAILABILITY FACTOR
.00
.00 60.50'
-1.31
-1.31 152.69-
- 22. UNIT' CAP. FACTOR (USING DER NET)
-1.23
-1.23 50.51
- 23. ENIT FORCED OUTAGE RATE
.00
.00 16.07'
- 24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND_ DURATION OF EACH):
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP: 6/7/93
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): -FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIEL OPERATION 1.16 - 9
.S'.
DOCKET NO.
050-0325 UMIT NAME Bnnswick 1 DATE Febnsary 1993 C0"PLETED BY Ronald R rpip_
TELEPHONE 919-457-2752 UNIT SHUTDOW4S AND POVER REDUCTICNS REPORT MONTH January. 1993 METHOD OF LICENSEE -
DURATION SHUTTING DOWN EVENT SYSTEM CODE COMPONENT CAUSE & CORRECTI E ACTICM TO '
NO.
DATE TYPE (1)
(HOURS)
REASON (2)
REACTOR (3)
REFORT NO.
(4)
CODE (5)
PREVENT RECURRENCE
- 93-001 920530 ~
S 744.0 B
4 1-92-12 N/A N/A To complete the scheduled Continued maintenance outage for from previous backlog reduction. Also, inonth structural inspections continued.
- This event was previously 92-024.
I:
-Type 2:
Reason 3:
Method 4: System Code:
5.
Ccroomnt Code-F - Forced A-Equipment Failure -
1-Manual Instruction for Instructions for 2-Manual Scram preparation of data entry preparation of data' S'- Scheduled (explain) 3-Automatic scram sheets for Licensee Event entry sheets for LER' F-Maintenance or test C-Refueling 4-Continuations Report (LER) file from
-file from IEEE D-
. Regulatory 5-Load reductions IEEE Standard 805-1983, Standard 803A-1983.
restriction 6-Other per NUREG-1022.
per MUREG-1022 E-Operator Training &
Section VI, Item 13.b Section VI, Item 13.c License Examination F-Administrative G:-
Operational error
-(erplain)
H-Other (explain) y g
y
cg iPLANTLPERFORMANCE DATAiSYSTEM:
PAGE-)
':2:
ECP&L Co.
APPENDIX B'-/ AVERAGE DAILY: POWER' LEVEL-
--RPD39-000:..
e.
_ RUN _DATE~. ;02/01/931
_RUN. TIME;v12:38:40
- BRUNSWICK UNIT 2' DOCKET-NO. 050-0324
~
COMPLETEDLBY; RONALD RUMPLE-
-TELEPHONEf(919)457-2752:
.~ JANUARY-1993
--DAY-AVG. DAILY 1 POWER LEVEL DAY
-AVG.--DAILY POWER' LEVEL
. (MWE-NET)f
- (MWE-NET).
i 1-17
-7.
2-
-8 18
-8 l
- 3 19
-7 I
1
- 4'
-7 20
-7
~3 5.
-7'
. 21 -
- 6-
-8 22
-4 17 i
-8 23
-6
- 8
.-8 2.4-9-
-9 25 -
-6 10
-9
'26-
-2
-11'
-9 27-
-3'-
' i2.'-
-7 28.
-7 a
<i3-
-7 29
-8 514--
- -7.
- 30 ; -
-7 31 - 16 '
-7 2
1.161 - 8 5
- ?
4
.E.
- j
CP&L CO PLANT PERFORMANCE DATA SYSTEM
-PAGE-2 RUN--DATE 02/01/93' OPERATING DATA REPORT-lRPD36-000; RUR. TIME 12:38:41 BRUNSWICK UNIT 2 DOCKET No. 050-0324-COMPLETED BY RONALD RUMPLE
-OPERATING STATUS TELEPHONE (919)457-2752
- 1. UNIT NAME:-BRUNSWICK UNIT 2 NOTES -There are 560 fuel bundles
- 2. REPORTING PERIOD: JANUARY 93 in the Reactor Core. 1113 BWR and
- 3. LICENSED THERMAL POWER (MWT): 2436 144 PWR spent fuel bundles in the
- 4. NAMEPLATE RATING (GROSS MWE): 867.0 fuel pool, and 0 fuel bundles in
- 5. DESIGN ELECTRICAL RATING (NET MWE): 821.0 the new fuel storage vault.
- 6. MAX DEPENDABLE CAPACITY (GROSS MWE): 782.0 l7. MAX DEPENDABLE CAPACITY (NET MWE) 754.0 8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:-
9.
POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE) :-
- 10. REASONS FOR RESTRICTION IF ANY:
l THIS YR TO-CUMUL j
MONTH DATE ATIVE l
.11.
HOURS IN REPORTING PERIOD 744.00 744.00 151200.00-
- 12. NUMBER OF HOURS REACTOR CRITICAL
.00
.00-92091.38-
- 13. REACTOR RESERVE SHUTDOWN HRS
.00
.00
.00?
- 14. HOURS GENERATOR ON LINE
.00
.00 87154.67 l
- 15. UNIT RESERVE SHUTDOWN HOURS
.00
.00
.00
- 16. GROSS THERMAL ENERGY GEN. (MWH)
.00
.00 184126854.86
- 17. GROSS ELEC.. ENERGY GEN. (MWH)
.00
.00 59550469.00
-18.-NET ELEC. ENERGY GENERATED (MWH)
-5056.00-
-5056.00.
57042504.00
- 19. UNIT SERVICE FACTOR
.00
.00 57.64'
- 20. UNIT AVAILABILITY FACTOR
.00
. 00 '
-57.64
-21.
UNIT CAP. FACTOR (USING MDC NET)
.90
.90 48.02-
- 22. UNIT CAP. FACTOR (USING DER. NET)
.83
.83
-45.95
- 23. UNIT FORCED OUTAGE RATE
.00
.00
-13.51 i
.24.
SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION.0F EACH):
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP: 3/28/93 26._ UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) : FORECAST ' ACHIEVED.
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION l
1.16 - 9 l
,e' f.,
s.*.
DOCKET NO.
050-0324
^
ifMIT NAME Betraswick 2 DATE February 1993 COMPLETED BY-Rerald R: role TELEPCME 919-457-2752 LMIT SHUTDOWNS AN3 POVER REDUCTIDMS REPORT MONTH January 1993 METHOD OF LICENSEE
'DURAi!ON SHUTTING DOWM EVENT SYSTEM CODE COMPONENT CAUSE & CORRECTIVE ACTION TO NO.
DATE-
' TYPE (1)
~(HOURS)
REASON (2)
REACTOR (3)
REPORT NO.
(4)
CODE (S)
PREVENT RECURRENCE
- 93-001 920430 5
144.0 B
4 1-92-12 TG XC To compl'_te the scheduled Continued.
ca.*tenance outage for-.
from previous backl W reduction. Also, rionth structura 'nspections continued.
- This event was previously 92-025.
I:
Tyre 2:
Reason-3:
Method 4: System Code:
S.
Comocicat Code F - Forced-A-
Equipment failure 1-Manual Instruction for Instructions for-
' S - Scheduled (crplain) 2-Manual Scram preparation of data entry preparation of data B-Maintenance or test 3-Automatic scram sheets for Licensee Event entry sheets for LER
'C-Refueling 4-Continuations Report (LEO) file from file from IEEE D-
' Regulatory 5-Load reductions IEEE Standard 805-1983 Standard 803A-1983, restriction' 6-Other per NUREG-1022.
per NUREG-1022.
E-Operator Training &
Section VI. Item 13.b Section VI. Item 13.c License Examination F-Achinistrative G-'
. Operational error :
- (explain)
H-Other(explain) f..w p
a 9-g v-g
-y
, -r
-2 S y-,
i-,
w
'.N