Text

. Attach cnt 2 to TXX-93078 4

february 3. 1993 Page 1 of 1 CPSES TECHNICAL REQUIREMENTS MANUAL (TRM)

AMENDHENT /-REVISION 11 DETAILED DESCRIPTION Prefix Page (11 AttRdtd) farDMD llticription 19 2

See Sheet No(s) tend 1 14 Revises Containment Spray Pump response time (to less than or equal to 32 seconds), and Notes 4 & 7-to Table 1.2.1. Engineered Safety Features Response Times.

Revision Resoluiion.of ONE 93 0071 identified that CT: pump start signal _17 seconds after Hi 1 is not required because the analysis uses 27 seconds plus a 5 second start time (i.e.

32 seconds).

The pumps start mest be included.

The related Notes to Table 1.2.1 have also been revised to address the issue addressed.by the ONE Form.

Change Request Number

TR 92 17.-

Commitment Register Number i Related SER : 7.3.1.3 SSER 322 7.3.1.3 SER/SSER 1mpact i No ald page i of TofC 3 10 3

See Sheet No(s) : 11.

12 6. 13 Deletes content of Technical Requirements 3.2 and 3.3.

Update As a result of the issuance of the Combined Unit Technical Specifications upon Unit 2' low power license issuance.-Technical Requirements 3.2 and 3.3 are to be deleted.

This-fulfills the commitment made in TRM Revision 10 to delete these requirements as part of the first TRM revision following low power license issuance for CPSES Unit 2.

Change Request Number'.

t TR 93 6.

Commitment Register Number Related SER SSER :

SER/SSER Impact

No 9302100186 930203 PDR ADOCK 0500 5

P

CPSES/TRM COMANCHE PEAK STEAM ELECTRIC STATION TECHNICAL REQUIREMENTS MANUAL INSTRUCTION SHEET The following instructional information and checklist is being furnished to holp insert Revision 11 into the Comancho Peak Steam Electric Station TRM.

A description of this revision is provided in TXX-93078, dated february 3, 1993.

Discard the old sheets and insert the new sheets, as listed below.

Keep all instruction sheets in the front of the Effective Page Listing to serve as a record of changes.

Remore Insert Table of._ Contents i

i Section 1 1-9 1-9 1-14 1-14 itction 3 3-10 thru 3-13 3-10 & 3-11 List of Effective Paati EPL-1 thru EPL-4 EPL-1 thru EPL-4 4

TECHNICAL REQUIREMENTS MANUAL TABLE OF CONTENTS JIfHNICAL RE00lREMENT NUMBER SYSTEM / TITLE (Related Tech Spec if required) 0 Administrative Controls 0.1(1.0)

Definitions 0.2(3/4.0)

Applicability 1.1(3/4.3.1)

Reactor Trip Response Time 1.2(3/4.3.2)

ESF Actuation Response Time 1.3 Moveable incore Detection System 1.4 Seismic Instruments 1.5 Loose Parts Detection System

)

2.1(3/4.6.3)

Containment Isolation Valves 3.1(3/4.7.9)

Snubbers 11 3.2 Deleted 3.3 Deleted 4.1(3/4.8.4)

Containment Penetration Conductor Overcurrent Protection Devices C0HANCHE PEAK - UNITS 1 AND 2 1

Revision 11 s

. February 3.-1993 a

TECHNICAL RE011REMENT 1,2 (continued)

TABLE 1.2.1 ENGINEERED SAFETY FEATURES RESPONSE TIMES INITIATION SIGNAL AND FUNCTION RESPONSE TIME IN SECONDS 2.

Containment Pressure--High-1 a.

Safety injection (ECCS) 127(1,5a)/27(4,5b) g b.

Reactor Trip 52 et Feedwater Isolation 16.5 d.

Phase "A" Isolation

$17(2)/27(1) e.

Containment Ventilation Isolation N.A.

f.

Auxiliary Teedwater 160 9

g.

Station Service Water N.A.

h.

Component Cooling Water-N.A.

i.

Essential Ventilation Systems N.A.

j. Emergency Diesel Generator 1 12 Operation i

k.

Turbine Trip H.A.

1.

Control Room Emergency Recirculation N.A.

m.

Containment Spray Pump 532(1.7) 11 COMANCHE PEAX - UNITS.1 AND 2 1-9.

Revision 11.

February 3, 1993

)

I

e TECHNICAL REQUIREMENT 1.2 (continued)

TABLE 1.2.1 TABLE NOTATIONS (1)

Diesel generator starting and sequence loading delays included.

(2)

Diesel generator starting delay ont included. Offsite power available.

(3)

Diesel generator starting delay included.

Only centrifugal charging pumps are included.

(4)

Diesel generator starting delay nol included. Only 11 centrifugal charging pumps are included.

(Sa)

Sequential transfer-of charging pump suction from the VCT to the RWST (RWST valves open, then VCT valves close) is not included.

(5b)

Sequential transfer of charging pumo suction from the VCT to the RWST (RWST valves open, then VCT valves close).is included.

(6)

Includes containment pressure relief line isolation only.

(7)

This is a bounding response time for all scenarios.

11 (8)

Response time measured to output of undervoltage channel only.

(9)

Two additional seconds allowable for alternate offsite source breaker trip functions.

1.2 ENGINEERED SAFETY FEATURES ACTUATION SYSTEM RESPONSE TIMES The bases for the Engineered Safety features Actuation System are contained in the CPSES Technical Specifications. The measurement of response time at the specified frequencies provides assurance that the Engineered Safety Features actuation associated with each channel is completed within the time limit assumed in-the safety analyses._ No credit was taken in the analyses for those channels with response times indicated as not applicable.

Response time may be demonstrated by any series of sequential, everlapping, or total channel test measurements provided.that such tests demonstrate the total channel response time as defined.

Sensor respons9 time. verification may be demonstrated by either:

(1) in place, onsite, or offsite test measurements,or(2)utilizingreplacementsensorswithcertified response time.

COMANCHE PEAK - UNITS 1 ANO 2.

1-14

~ Revision 11 february 3, 1993

.-_._.J

TECHNICAL REOUIREMENT 3.2 Deleted.

11 5

COMANCHE. PEAK - UNITS 1 AND 2 3-10 Revision 11 February 3, 1993

TECHNICAL REOUIREMENT 3.3 Deleted.

11 CDMANCHE PEAK - UNITS 1 AND 2 3-11

.Revition 11-February 3, 1993;

3 TECHNICAL REQUIREMENTS MANUAL EFFECTIVE PAGE-LISTING BELOW IS A LEGEND FOR THE EFFECTIVE PAGE LISTING:

Original Submitted July 21 -1989 Revision 1 September 15, 1989 Revision 2 January 15, 1990 Revision 3 July 20, 1990 Revision 4 April 24, 1991 Revision 5 September 6,19911

. Revision 6 November 22, 1991 Revision 7 March 18, 1992 Revision 8 June 30, 1992 Revision 9 December 18, 1992 Revision 10 January 22, 1993 Revision 11.

February 3, 1993 F

i l

i i

EPL 1

February 3, 1993 o

~

TECHNICAL REQUIREMENTS RANUAL EFFECTIVE PAGE LISTlhG 1RM-Tab Original TRM-Title Page June 30,1992 Table of Contents-Tab Original i

' Revision 11 Administrative Controis-Tab Original Administrative Controis-Title Page June 30,1992 0-1 June 30,1992 0-2 January-22, 1993-0-3 December 18, 1992 0+4 June 30, 1992-0-5 January 22, 1993 0-6 January 22, 1993 0-7 January 22, 1993 0-8 January 22, 1993 0-9 January 22, 1993-0-10 January 22, 1993 0-11 January 22, 1993 0-12 June 30, 1992 0-13 June 30, 1992 0-14 June 30, 1992 0-15 June 30, 1992 0-16 January 22, 1993-0-17 January 22, 1993 0-18 June 30, 1992-0-19 Revision 8 0-20 Revision 8 0-21 Revision 8-0-22 Revision 8 0-23 Revision 8 0-24 Revision 8-G-25 Re/ision 8 0-26 January 22, 1993 -

Technical Requirements-Tab Original Section 1-Tab Original 1-1 June 30, 1992 1-2

~ Revision 8 1 ' June 30, 1992 1-4 January 22, 1993 1-5 June 30,-1992 1-6 Revision 8 1-7 June 30,.1992-1-8 June 30,1992.

1-9 Revision 11 1-10' Revision 9 1-11

-Revision 9 1-12 Revision 9 EPL 2

February 3, 1993 h

~

TECHNICAL REQUIREMENTS MANUAL EFFECTIVE PAGE LISTING 1-13 Revision 9 1-14 Revision 11 1-15 Revision 8 1-16 June 30, 1992 1-17 Revisior 8~

1-18 January 22, 1993.

1-19 January 22.-1973 1-20 January 22, 1993 1-21 June 30, 1992 1-22 Revision 8 Sec. 2-Tab Original 2-1 June _30, 1992-2-2 Revision 8 2-3 June 30, 1992

-i 2-4 January 22, 1993 2-5 Revision 8 2-6 Revision.8 2-7 Revision G 2-8 Jenuary 22, 1993 2-9 Revision 8 2-10 January 22, 1993-2-11 Revision 8 i

2-12 Revision 9=

2-13

-Revision 8 2-14

' January 22, 1993 2-15 Revision 8 2-16 Revision _8 2-17 Revision 8 1

2-18 Revision 8 2-19 January 22, 1993' 2-20 January 22, 1993' 2-21 Revision 8 2-22 Revision 8 2-23

. Revision 8 2-24 Revision 8-2-25 Revision 9 2-26 Jan'uary 22.-1993 2-27 December 18, 1992-2-28

' December 18, 1992

'Sec. 3-Tab Original-3-1

. June 30,~1992-3-2 Revision 8 3-3

-Revision 10 3-4 January 22, 1993' 3-5 January 22, 1993 3-6

-June 30,-1992 EPL 3

February 3, 1993

t TECHNICAL REQll!REMENTS MANUAL EFFECTIVE PAGE LISTING 3-7 June 30, 1992 3-8 June 30,1992 3-9 June 30,-1992 3-10 Revision 11 3-11 Revision 11 Sec. 4-Tab Original 4-1 June 30, 1992 4-2 Revision 8-4-3 January 22,-1993 4-4 January 22, 1993 4-5 Revision 9 -

4-6 Revision 9 4-7 Revision 8 4-8 Revision 8 4-9 Revision 8 4-10 Revision 8 4-11 Revision 8 4-12 Revision 8 4-13 Revision 8 4-14 Revision 8 4-15 Revision 8 4-16 Revision-8 4-17 Revision'10 4-18 Revision 9 4-19 Revision 9 4-20 Revision 8 4-21 Revision 8 4-22 Revision 10 4-23 Revision 10 4-24 Revision 10s 4-25 Revision 8 4-26 Revision 8 4-27 Revision 8-4-28 Revision 10 4-29 Revision 8 4-30 Revision.10

.4-31 June 30, 1992 EPL-Tab

. Original EPL 'Revisionill

'EPL-2

-Revision'11 EPL-3 Revisien 11

-EPL-4 Revision 11 EPL 4.

February 3,'1993 l

- -- D