Commonwealth Edison On3 First NTtional PLtza, Chicago, Illinois Address Reply to: Post Office Box 767 Chicago. lilinois 60690 June 28, 1985 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555
Subject:
Quad Cities Station Units 1 and 2 Proposed Technical Specification Amendment Change Deletion of Diesel Generator Testing When ECCS Systems are Inoperable NRC Docket Nos. 50-254 and 50-265 Reference (a):
D. G. Eisenhut letter to All Licensees dated July 2, 1985 - Generic Letter 84-15
Dear Mr. Denton:
Pursuant to 10 CFR 50.90, Commonwealth Edison (CECO) proposes an amendment to Appendix A, the Technical Specifications, for Operating Licenses DPR-29 and DPR-30 deleting some unnecessary diesel generator testing. The NRC Staff, in Reference (a), indicated that requirements for testing diesel generators (D/Gs) while ECCS equipment is inoperable results in excessive testing and increased degradation of diesel engines. The Staff, therefore, encouraged licensees to request deletion of such testing requirements from the Technical Specifications. Accordingly, CECO has reviewed the Technical Specifications for Units 1 and 2 and submits these amendments deleting both the initial and subsequent daily testing of the D/Gs whenever the Core Spray subsystem or the LPCI or Containment Cooling modes of RHR are found to be inoperable. Furthermore, considering the guidance provided for in the Generic Letter and the NRC's general concern on excessive testing of D/Gs, Commonwealth Edison also deleted the initial and subsequent testing of an operable D/G when one is found to be inoperable.
The propose-amendments can be found in Attachments 1 and 2 and have been both On-Sit 3 and Off-Site reviewed. We have reviewed these amendment requests and find that no significant hazards consideration exists. Our review is documented in Attachment 3.
Commonwealth Edison will notify the State of Illinois of our request for this amendment and our appraisal on the question of no significant hazards by transmittal of a copy of this letter and its attachments to the designated State Official.
b 8507050005 850628 O
./
PDR ADOCK 05000254
\\
g 0t v) 4 0
o M q(p P
\\ 0 j
L
i H. R. Denton June 28, 1985 Approval is requested by January 1, 1986.
In.accordance with 10 CFR 170, a fee remittance in the amount of
$150.00 is enclosed.
Please direct any questions you may have concerning this matter to this office.
Three (3) signed originals and thirty-seven (37) copies of this transmittal and its attachments are provided for your use.
Very truly yours, B. Ry r
Nuclear Licensing Administrator 1m Attachments (1): Technical Specification Change to DPR-29 (2): Technical Specification Change to DPR-30 (3): Evaluation of Significant Hazards Consideration cc: Region III Inspector - QC R. Bevan - NRR M. C. Parker - IL SUB BED AND to befo me.this day o f __ _ RfD
, 1985
/2tM Notar9 Public y 0284K