J A N '2 9 E
h
'
(/
\\
Docket Hos. 50-254; 50-265
'
Commonwealth Edison Company
ATTN: Mr. L. O. DelGeorge
Vice President, Nuclear Oversight
and Regulatory Services
Executive Towers West III
1400 Opus Place, Suite 300
,
Downers Grove, IL 60515
Dear Mr. DelCeorge:
This refers to the inspection conducted by Messrs. T. Taylor, J. Shine,
2
Prescott, G. Hausman, and Ms. P. Lougheed of this office from November 23,
,f
3 2, through January 11, 1993. This inspection included a review of
authorized activities for your Quad Cities Nuclear Power Station facility. At
'
the conclusion of the inspection, the findings were discussed with those
members of your staff identified in the enclosed report.
2
Areas examined during the inspection are identified in the report. Within
these areas, the inspection consisted of a selective examination of procedures
and representative records, interviews with personnel, and observation of
activities in progress.
During this inspection, certair of your activities appeared to be in violation
of NRC requirements, as specified in the enclosed Notice of Violation
(Notice). The first violation is of concern because it involved your failure
to provide prompt resolution of a previous violation, which in itself,
concerned the failure to adequately identify and promptly resolve a % diesel
generator logic issue.
Also during this inspection, certain other of your activities appeared to be
in violation of NRC requirements. However, as described in the enclosed
inspection report, you identified-the violation, therefore, it is not being
cited because the criteria specified in Section VII.B.2 of_10 CFR Part 2,
1
Appendix C (Enforcement Policy) were met.
Additionally, two events occurred involving the temporary cooling water to the-
instrument air system. We are concerned about your administrative controls
over balance-of-plant activities which could impact plant operations.
In
addition to addressing the above violations, we request that your response
also address your planned actions to ensure adequate control over balance-of-
plant activities which could affect plant operations.
050023
9302100094 930129
/
/
t
j
pa
Ow g
-
_
i
^
.
JAN 2 9 1993
Commonwealth Edison Company
2
You are required to respond to this letter and should follow the instructions
specified in the enclosed Notice when preparing your response,
in your
response, you should document the specific actions taken and any additional
actions you plan to prevent recurrence.
In the case of the first violation,
your response should address not only how the initial concern will be
resolved, but also how you will ensure that corrective actions are promptly
taken on future issues. After reviewing your response to this Notice,
including your proposed correc.tive actions and the results of future
inspections, the NRC will determine whether further NRC enforcement action is
necessary to ensure compliance with NRC regulatory requirements,
in accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter, the enclosures, and your response to this letter will be placed
in the NRC Public Document Room.
The responses directed by this letter and the accompanying inspection report
are not subject to the clearance procedures of the Office of Management and
Budget as required by the Paperwork Reduction Act of 1980. PL 96-511.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
ORIGINAL SIGNED ET! W. L f0RNEY
dward G. Greenman, Director
yivisionofReactorProjects
Enclosures:
1.
2.
Inspection Report
No. 50-254/92028(DRP);
No. 50-265/92028(DRP)
See Attached Distribution
0
af
RIIIA
RII1g
RIIJf
RIII
RIII
RIII.
Ta{yNrC
f sA
? M ,Icf
- <
uh
'M
'
Hi'l sk)
Jablo ski
Clayton
Fo ney
E'tireenmar.
d>Th;
WLW1
'9l,3
.-. .
,
_
_
___ _ _ .-_ _ _ __._____ _ _ ___ _ _ _ _
.
Commonweaith Edison Company
3
JAN 2 9 1903
cc w/ enclosures:
R. Pleniewicz, Site Vice President,
R. Bax, Station Manager
A. Misak, Regulatory Assurance Supervisor
D. Farrar, Nuclear Regulatory Services
'
Manager
DCD/DCB-(RIDS)
OC/LFDCB
Resident inspectors, Quad Cities,
-Dresden, LaSalle, Clinton
R. Hubbard
J. W. McCaffrey, Chief, Public.
Utilities Division
Licensing Project Manager, NRR-
R. Newmann,. 0ffice of Public Coun el,
State of Illinois Center
State Liaison Officer
H. J. Miller, RIII'
,