Forwards Radiological Safety Insp Rept 50-333/85-12 on 850422-26 & Notice of Violation
ML20128C669
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 06/21/1985
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Glovier H
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
Shared Package
ML20128C672 List:
References
NUDOCS 8507030652
Download: ML20128C669 (2)


See also: IR 05000333/1985012

Text

O

.-

JUN 211985

Docket No. 50-333

Power Authority of the State of New York

James A. FitzPatrick Nuclear Power Plant

ATTN: Mr. Harold A. Glovier

.

Resident Manager

P. O. Box 41

Lycoming, New York 13093

Gentlemen:

Subject:

Inspection Report No. 50-333/85-12

A routine radiological safety inspection was conducted by Mr. R. L. Nimitz of

this office on April 22-26, 1985 of your James A. Fitzpatrick Nuclear Power

Plant. The_ findings of this inspection were discussed with you at the con-

clusion of the inspection.

Areas examined during this inspection are described in the enclosed inspection

report. The inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, measurements made by the

inspector, and observations by the inspector.

Two violations of NRC requirements were identified in the radiological controls

area.

First, personnel were not found to be adhering to radiological controls

program procedures and second, the program for high radiation area access

control was not being fully implemented.

We acknowledge that timely correction action was taken to address the immediate

concerns associated with these problems. We also acknowledge that some of the

instances of failure to adhere to procedures were minor in nature. However, we

are concerned about the adequacy of radiological controls for reactor cavity

work. The number of instances of failure to adhere to radiological procedures

for the cavity work indicate an apparent lack of supervisory oversight of this

work. We are particularly concerned that material was removed from the cavity

and appropriate radiation surveys were not made of the material prior to its

handling by personnel.

Please reply to these matters in accordance with the

enclosed Appendix A, addressing the action taken or planned to improve per-

sonnel adherence to procedures, and supervisory oversight of work. The reply

is not subject to clearance by the Office of Management and Budget under the

Paperwork Reduction Act of 1980, PL 96-511.

8507030652 850621

PDR

ADOCK 05000333

G

PDR

OFFICIAL RECORD COPY

IR FITZ 85-12 - 0001.0.0

06/19/85

1 i

t

,

.

Power Authority of the

State of New York

2

Your cooperation with us is appreciated.

Sincerely,

Original Signed Byi

N

M

p

Thomas T. Martin, Di e

Division of Radiation Safety

and Safeguards

Enclosure:

1.

Appendix A, Notice of Violation

2.

NRC Region I Inspection Report No. 50-333/85-12

cc w/encls:

L. W. Sinclair, President

J. P. Bayne, First Executive Vice President and Chief Operations Officer

A. Klausmann, Vice President - Quality Assurance and Reliability

.

R. L. Patch, Quality Assurance Superintendent

George M. Wilverding, Chairman, Safety Review Committee

Gerald C. Goldstein, Assistant General Counsel

NRC Licensing Project Man,ager

Dept. of Public Service, State of New York

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of New York

bec w/encls:

Region I Docket Room (with concurrences)

Senior Operations Officer (w/o encis)

M. Miller, Region 1

Section Chief, DRP

i

DRSS:RI

DRSS:RI

RI

DRS R

RNimitz/fi

KHolsopple

WPtsciak

RBellamy

06/f{/85

06/f/85

06/l4/85

06/%/85

i2 M

OFFICIAL RECORD COPY