JUN 0 41976 Darrell G. Eisenhut, Assistant Director #for Operational Technology, DDR I
CONTIN 11AT10N OF TEQtNICAL ASSISTANCE REQUEST NO. ORB-2-213 i
Plant Name: Monticello (Northern Statea Power)
Docket Number: Q Branch Code: ORB-2 Project Manager:
R. P. Snaider (27403)
Operational Technology Branch: Plant Systems Branch.
Requested Completion Date: Open pending generic resolution Description of Request: B) letter dated Septenber 19, 1975 (copy
'{
attached), Northern States Power (NSP) identified areas of'11onticello's non-compliance with 10 CFR 50. Appendix J.
A January 30,1976, letter (copy attached) submitted a proposed License Amendment Request to incorporate new Limiting Conditions for Operation and Surve111mee j
Requirements for primary containment leakage testing. TAR ORB-2-213 (copy attached) dated February 13, 1976, 4
requested review of the License Amand-ment Request.
'Ihis TAR indicated that additional information would be forth -
coming from NSP to complete their Appendix J sthmittal. This information has been received'in the following-letters, copies of which are attached:
a.
May 4,-1976 - Revisions to Report of Conformance to 10 CFR 50,. Appendix J,
-and-License. Amendment Request dated-January 30, 1976. This letter completely revises the earlier Licenso /mendment.
Request.
- b. -May-5, 1976 - Planned llodifications-to Permit Testing to be Conducted
~
in accordance with 10 CFR 50, Appendix J i
I-0"'C**
..i 8W"N A M E *
..m r.,....,...
o ATt >
. Form AEC.3ts (Rev. 9 53) AECM 0240 W u. a. novsanuant eninvine orrecas nov4.ese tee 9212040360-760604 PDR ADOCK 05000263 p_
,PDR
i j
..g J n 0 ' 1976 i
Darrell C. Eisenhut i i
i i
M 5,1976 - Request for Exemption from c.
Certain Requirements of 10 CFR 50, a
j
{
Appendiz J...
t I
j j
Requested Action: Review the May 4, 1976 and two May 5, 1976 letters and provide a safety evaluation concerning the acceptability of the deviations from Appendix J 3
and reconmendations with basis regarding the requested exemptions.
Should the proposal be deemed unacceptable.
submit cotasaents and/or questions as soon as possible.
l Because conformance with Appendix J is a generic concern. this request is but one of a series of similar requests to be submitted.
l 4
' 5 gnr1 by:
r.-i
.e':' ann a
Dennis L. Ziemann, Chief Operating Reactors Branch 12 Division of Operating Heactors Enclosures :
1.
NSP letter dtd. 9/19/75 l
2.
USP letter dtd. 1/30/76 3.
TAR ORB-2-213 dtd. 2/13/76 4.
NSP letter dtd. 5/4/76 5.
NSP letters (2) dtd. 5/5/76 j
i cc w/ enclosures:
A. Schwencer -
cc w/o enclosures:
R. F. Snaider M. Fairtile
(
R. Diggs-8 K. Goller j-l T. Carter
~V.
Stello l
DISTRIBUTION Docket i
ORB #2 Reading
_ Subj ect File -
- /
h..ib n#2 DOR:0RB f4 DOR:0RB #2~
I DOR:0RB o,,,,,,'
RPSnaider:ah MFairtile DLZiemann
.un-,,
6/'//76 6 / 4.... /. 76_
6/ /76
,,o.,
3 Forni AEC-318 (Rev. 9 53) AECM 0240 W u. s. sovanmu sst enininne orricsi tata.saa.tae 4
..