MONTHYEARML20211K8411999-09-0202 September 1999 Proposed Tech Specs Deleting Inequality Signs from Trip Setpoints in SR 3.3.5.3 & Reflecting Info on Calibr Tolerance Band ML20210J1431999-07-29029 July 1999 Proposed Tech Specs Changes to ITSs ML20209D3651999-07-0808 July 1999 Proposed Tech Specs Pages Re Amend to License NPF-42, Revising Allowable Value for CTS Table 3.3-4,functional Unit 8.a.,4 Kv Undervoltage - Loss of Voltage & Functional Unit 8.b.,4 Kv Undervoltage - Grid Degraded Voltage ML20209C2081999-06-30030 June 1999 Proposed Tech Specs Re Temporary Change to CTS Without Action to Reduce Power ML20195G0331999-06-11011 June 1999 Proposed Tech Specs Pages,Revising TS 3.7.1.6 & Bases by Modifying LCO to Require Four ARVs to Be Operable, Eliminating Use of Required in Action Statements & Adding New Action for Three or More ARVs Inoperable ML20195F7961999-06-10010 June 1999 Proposed Tech Specs,Revising Z,S & Allowable Value Terms for Current TS Table 3.3-4,functional Unit 7.b,automatic Switchover to Containment Sump (RWST Level - Low-Low) ML20206Q9041999-05-11011 May 1999 Proposed Tech Specs 3/4.7.5, Ultimate Heat Sink, Proposing Addl Required Zcaion for Restoring Ultimate Heat Sink to Operable Status within Completion Time of 8 H ML20196K7321999-03-26026 March 1999 Proposed Tech Specs Converting to Improved Tech Specs ML20205A2111999-03-25025 March 1999 Markups of Current & Improved TS Re TS Conversion Application ML20207J2021999-03-0505 March 1999 Proposed Tech Specs Re Conversion to ITS Section 1,0,3.1, 3.2,3.3,3.4,3.6,3.7,3.8,3.9,4.0 & 5.0 ML20199G7281999-01-15015 January 1999 Proposed Tech Specs SR 4.7.3b Deleting During SD Requirement & Reflect Appropriate Plant Conditions in Associated 3/4.7.3 Bases ML20199F4511999-01-12012 January 1999 Proposed Tech Specs Pages Re Amend to License NPF-42, Revising TS 3/4.7.5 by Adding New Action Statement Requiring Verification of Operability of Two RHR Trains,Or Initiation of Power Reduction with Only One RHR Train Operable ML20198P1211998-12-29029 December 1998 Proposed Tech Specs to Incorporate Revised Heatup & Cooldown Limit Curves & Revised Cold Overpressure Mitigation Sys (COMS) PORV ML20197H6701998-12-0808 December 1998 Proposed Corrected Tech Spec Page 4.0-2 Increasing Spent Fuel Storage Capacity ML20196G6161998-12-0202 December 1998 Proposed Tech Specs Section 3.3, Instrumentation ML20196B4901998-11-24024 November 1998 Proposed Tech Specs Pages & follow-up Items Re Proposed Conversion to TS Section 1.0,3.4,3.5 & 3.6,per 980828 RAI ML20155H6841998-11-0606 November 1998 Proposed Tech Specs Pages,Revising TS Bases Section 3/4.4.4, Relief Valves ML20155H6121998-11-0606 November 1998 Proposed Tech Specs Bases 3/4.7.1.2 Re Afws ML20154S5721998-10-23023 October 1998 Proposed Tech Specs Section 3.5.1,increasing AOT in Action B. to 24 Hours in Lieu of Current AOT of One Hour ML20154S5911998-10-23023 October 1998 Proposed Tech Specs Sections 3.1, Reactivity Control Sys, 3.2, Power Distribution Sys, 3.4, RCS, 3.5, ECCS & 5.0, Administrative Controls ML20154R9321998-10-20020 October 1998 Proposed Tech Specs 3/4.3,changing ESFAS Functional Units 6.f,8.a & 8.b ML20153H0431998-09-24024 September 1998 Proposed Tech Specs Pages Re RAI on Application for Amend to License NPF-42,incorporating Changes to TS Sections 3.4 & 5.0 ML20236Y2771998-08-0505 August 1998 Proposed Tech Specs Sections 3.1,3.2,3.5,3.9 & 4.0 Converting to Improved Std Tech Specs ML20236R4781998-07-17017 July 1998 Proposed Tech Specs 3/4.7.5 Revising UHS by Adding Temporary New Action Statement ML20236G8321998-06-30030 June 1998 Proposed Tech Specs Re Section 3.6, Containment Sys ML20247F8611998-05-0808 May 1998 Proposed Tech Specs 3/4.3.2,Table 3.3-3,revising Functional Unit 7.b.,RWST Level low-low Coincident W/Safety Injection, by Adding New Action Statement ML20216J8291998-03-20020 March 1998 Proposed Tech Specs,Increasing Spent Fuel Storage Capacity & Increasing Max Nominal Fuel Enrichment to 5.0 W/O (Nominal Weight Percent) U-235 ML20202C4561998-02-0404 February 1998 Proposed Tech Specs 3/4.3 Re Changes to ESFAS Functional Units 6.f,8.a & 8.b ML20202D1251998-02-0404 February 1998 Proposed Tech Specs 3/4.2.4 Re Quadrant Power Tilt Ratio ML20199H3551998-01-28028 January 1998 Proposed Tech Specs 6.3 & 6.12,reflecting Position Change within Organization ML20198P5001998-01-15015 January 1998 Proposed Tech Specs Replacement Pages Clarifying Bases in 970-902 LAR Re Auxiliary Feedwater Sys ML20198Q9411997-11-0606 November 1997 Proposed Tech Specs Bases Section 3/4.8.1,3/4.8.2 & 3/4.8.3 for Installation of Spare Battery Chargers ML20217K2181997-10-17017 October 1997 Proposed Tech Specs 4.5.2b,revising Surveillance Requirement to Vent ECCS Pump Casings ML20217B6161997-09-19019 September 1997 Proposed Tech Specs Bases Section B3/4.9.2,adding Info Re Role of Source of Power Supplied to One Source Range Neutron Flux Monitor in Determining Operability of Monitor in Mode 6 ML20216F7311997-09-0606 September 1997 Proposed Tech Specs,Alleviating Need for Enforcement Discretion Granted by NRC on 970905 ML20216F6911997-09-0505 September 1997 Proposed Tech Specs,Requesting NRC Exercise Discretion Re Compliance W/Srs 4.8.1.1.2.g.2)c)2,4.8.1.1.2.g.3)d) & 4.8.1.1.2.g.4)d) ML20216D1551997-09-0202 September 1997 Proposed Tech Specs,Adding Requirements for Essential Svc Water Flowpaths to turbine-driven AFW Pump ML20196J4071997-07-29029 July 1997 Proposed Tech Specs Revising Wording of Action Statement 5a to TS Table 3.3-1, Reactor Trip Sys Instrumentation ML20141G7721997-07-0303 July 1997 Proposed Tech Specs Section 5.3.1 Incorporating Addl Info Into TS 6.9.1.9, Colr ML20154Q2441997-05-15015 May 1997 Proposed Improved TS Section 3.7, Plant Sys ML20151T0151997-05-15015 May 1997 Proposed Tech Specs Re Response to Request for Addl Info on Conversion to Improved Tech Specs ML20195J8241997-05-15015 May 1997 Proposed Tech Specs Re Rev to Increase Spent Fuel Pool Storage Capacity ML20198J6551997-05-15015 May 1997 Proposed Tech Specs Re Response to RAI on Proposed Conversion to Ists,Section 3.8, Electrical Power Sys ML20138B9121997-04-23023 April 1997 Proposed Tech Specs,Revising TS 3/4.9.4 Containment Bldg Penetrations & Associated Bases Section to Allow Selected Containment Isolation Valves to Be Opened Under Administrative Controls During Periods of Core Alterations ML20137X3371997-04-15015 April 1997 Proposed Tech Specs 6.8.5.d Re Reactor Coolant Pump Flywheel Insp Program ML20147F8241997-03-21021 March 1997 Proposed Tech Specs Re Reactor Coolant Pump Flywheel Insp Program ML20137C2031997-03-19019 March 1997 Proposed Tech Specs Bases Pp Reflecting Corrections to Ref Made on Those Pp ML20137B9371997-03-18018 March 1997 Proposed Tech Specs,Revising TS Section 5.3.1,fuel Assemblies to Allow Use of Alternate Zr-based Fuel Cladding Matl ZIRLO ML20137B9141997-03-18018 March 1997 Proposed Tech Specs,Revising TS SR 4.5.2.c to Clarify When Containment Entry Visual Insp Is Required ML20134Q0811997-02-17017 February 1997 Proposed Tech Specs,Revising TS 1.7, Containment Integrity, TS 3/4.6.1, Containment Integrity & TS 3/4.6.3, Containment Isolation Valves 1999-09-02
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20211K8411999-09-0202 September 1999 Proposed Tech Specs Deleting Inequality Signs from Trip Setpoints in SR 3.3.5.3 & Reflecting Info on Calibr Tolerance Band ML20210J1431999-07-29029 July 1999 Proposed Tech Specs Changes to ITSs ML20209D3651999-07-0808 July 1999 Proposed Tech Specs Pages Re Amend to License NPF-42, Revising Allowable Value for CTS Table 3.3-4,functional Unit 8.a.,4 Kv Undervoltage - Loss of Voltage & Functional Unit 8.b.,4 Kv Undervoltage - Grid Degraded Voltage ML20209C2081999-06-30030 June 1999 Proposed Tech Specs Re Temporary Change to CTS Without Action to Reduce Power ML20195G0331999-06-11011 June 1999 Proposed Tech Specs Pages,Revising TS 3.7.1.6 & Bases by Modifying LCO to Require Four ARVs to Be Operable, Eliminating Use of Required in Action Statements & Adding New Action for Three or More ARVs Inoperable ML20195F7961999-06-10010 June 1999 Proposed Tech Specs,Revising Z,S & Allowable Value Terms for Current TS Table 3.3-4,functional Unit 7.b,automatic Switchover to Containment Sump (RWST Level - Low-Low) ML20206Q9041999-05-11011 May 1999 Proposed Tech Specs 3/4.7.5, Ultimate Heat Sink, Proposing Addl Required Zcaion for Restoring Ultimate Heat Sink to Operable Status within Completion Time of 8 H ML20196K7321999-03-26026 March 1999 Proposed Tech Specs Converting to Improved Tech Specs ML20205A2111999-03-25025 March 1999 Markups of Current & Improved TS Re TS Conversion Application ML20207J2021999-03-0505 March 1999 Proposed Tech Specs Re Conversion to ITS Section 1,0,3.1, 3.2,3.3,3.4,3.6,3.7,3.8,3.9,4.0 & 5.0 ML20199G7281999-01-15015 January 1999 Proposed Tech Specs SR 4.7.3b Deleting During SD Requirement & Reflect Appropriate Plant Conditions in Associated 3/4.7.3 Bases ML20199F4511999-01-12012 January 1999 Proposed Tech Specs Pages Re Amend to License NPF-42, Revising TS 3/4.7.5 by Adding New Action Statement Requiring Verification of Operability of Two RHR Trains,Or Initiation of Power Reduction with Only One RHR Train Operable ML20198P1211998-12-29029 December 1998 Proposed Tech Specs to Incorporate Revised Heatup & Cooldown Limit Curves & Revised Cold Overpressure Mitigation Sys (COMS) PORV ML20207J9621998-12-18018 December 1998 Rev 1 to TRM for Wolf Creek Generating Station,Unit 1 ML20197H6701998-12-0808 December 1998 Proposed Corrected Tech Spec Page 4.0-2 Increasing Spent Fuel Storage Capacity ML20196G6161998-12-0202 December 1998 Proposed Tech Specs Section 3.3, Instrumentation ML20196B4901998-11-24024 November 1998 Proposed Tech Specs Pages & follow-up Items Re Proposed Conversion to TS Section 1.0,3.4,3.5 & 3.6,per 980828 RAI ML20195E7671998-11-10010 November 1998 Rev 0 to EPP 01-2.4, Core Damage Assessment Guidance ML20155H6121998-11-0606 November 1998 Proposed Tech Specs Bases 3/4.7.1.2 Re Afws ML20155H6841998-11-0606 November 1998 Proposed Tech Specs Pages,Revising TS Bases Section 3/4.4.4, Relief Valves ML20154S5911998-10-23023 October 1998 Proposed Tech Specs Sections 3.1, Reactivity Control Sys, 3.2, Power Distribution Sys, 3.4, RCS, 3.5, ECCS & 5.0, Administrative Controls ML20154S5721998-10-23023 October 1998 Proposed Tech Specs Section 3.5.1,increasing AOT in Action B. to 24 Hours in Lieu of Current AOT of One Hour ML20154R9321998-10-20020 October 1998 Proposed Tech Specs 3/4.3,changing ESFAS Functional Units 6.f,8.a & 8.b ML20153H0431998-09-24024 September 1998 Proposed Tech Specs Pages Re RAI on Application for Amend to License NPF-42,incorporating Changes to TS Sections 3.4 & 5.0 ML20236Y2771998-08-0505 August 1998 Proposed Tech Specs Sections 3.1,3.2,3.5,3.9 & 4.0 Converting to Improved Std Tech Specs ML20236R4781998-07-17017 July 1998 Proposed Tech Specs 3/4.7.5 Revising UHS by Adding Temporary New Action Statement ML20236G8321998-06-30030 June 1998 Proposed Tech Specs Re Section 3.6, Containment Sys ML20247F8611998-05-0808 May 1998 Proposed Tech Specs 3/4.3.2,Table 3.3-3,revising Functional Unit 7.b.,RWST Level low-low Coincident W/Safety Injection, by Adding New Action Statement ML20216J8291998-03-20020 March 1998 Proposed Tech Specs,Increasing Spent Fuel Storage Capacity & Increasing Max Nominal Fuel Enrichment to 5.0 W/O (Nominal Weight Percent) U-235 ML20202D1251998-02-0404 February 1998 Proposed Tech Specs 3/4.2.4 Re Quadrant Power Tilt Ratio ML20202C4561998-02-0404 February 1998 Proposed Tech Specs 3/4.3 Re Changes to ESFAS Functional Units 6.f,8.a & 8.b ML20199H3551998-01-28028 January 1998 Proposed Tech Specs 6.3 & 6.12,reflecting Position Change within Organization ML20198P5001998-01-15015 January 1998 Proposed Tech Specs Replacement Pages Clarifying Bases in 970-902 LAR Re Auxiliary Feedwater Sys ML20198Q9411997-11-0606 November 1997 Proposed Tech Specs Bases Section 3/4.8.1,3/4.8.2 & 3/4.8.3 for Installation of Spare Battery Chargers ML20217K2181997-10-17017 October 1997 Proposed Tech Specs 4.5.2b,revising Surveillance Requirement to Vent ECCS Pump Casings ML20217B6161997-09-19019 September 1997 Proposed Tech Specs Bases Section B3/4.9.2,adding Info Re Role of Source of Power Supplied to One Source Range Neutron Flux Monitor in Determining Operability of Monitor in Mode 6 ML20216F7311997-09-0606 September 1997 Proposed Tech Specs,Alleviating Need for Enforcement Discretion Granted by NRC on 970905 ML20216F6911997-09-0505 September 1997 Proposed Tech Specs,Requesting NRC Exercise Discretion Re Compliance W/Srs 4.8.1.1.2.g.2)c)2,4.8.1.1.2.g.3)d) & 4.8.1.1.2.g.4)d) ML20216D1551997-09-0202 September 1997 Proposed Tech Specs,Adding Requirements for Essential Svc Water Flowpaths to turbine-driven AFW Pump ML20196J4071997-07-29029 July 1997 Proposed Tech Specs Revising Wording of Action Statement 5a to TS Table 3.3-1, Reactor Trip Sys Instrumentation ML20141G7721997-07-0303 July 1997 Proposed Tech Specs Section 5.3.1 Incorporating Addl Info Into TS 6.9.1.9, Colr ML20151T0151997-05-15015 May 1997 Proposed Tech Specs Re Response to Request for Addl Info on Conversion to Improved Tech Specs ML20198J6551997-05-15015 May 1997 Proposed Tech Specs Re Response to RAI on Proposed Conversion to Ists,Section 3.8, Electrical Power Sys ML20154Q2441997-05-15015 May 1997 Proposed Improved TS Section 3.7, Plant Sys ML20195J8241997-05-15015 May 1997 Proposed Tech Specs Re Rev to Increase Spent Fuel Pool Storage Capacity ML20138F3371997-04-30030 April 1997 Rev 0 to Offsite Dose Calculation Manual ML20138B9121997-04-23023 April 1997 Proposed Tech Specs,Revising TS 3/4.9.4 Containment Bldg Penetrations & Associated Bases Section to Allow Selected Containment Isolation Valves to Be Opened Under Administrative Controls During Periods of Core Alterations ML20137X3371997-04-15015 April 1997 Proposed Tech Specs 6.8.5.d Re Reactor Coolant Pump Flywheel Insp Program ML20147F8241997-03-21021 March 1997 Proposed Tech Specs Re Reactor Coolant Pump Flywheel Insp Program ML20137C2031997-03-19019 March 1997 Proposed Tech Specs Bases Pp Reflecting Corrections to Ref Made on Those Pp 1999-09-02
[Table view] |
Text
_- - _ _ _ _ _ _ _ _ _ _ _ - _ _ .
' Attachment to NA 93'-0013 C
'Pagef1of4' REACTIVITY CONTROL SYSTEMS FLOW PATHS -'0PERATING LIMITING CONDITION FOR OPERATION-3.1.2.2 At least two of the following three boron injection flow paths shall be OPERABLE:
a, The flow path from the Boric Acid Storage System via a boric acid transfer-pump and a centrifugal cnarging pump to the Reactor Coolant System, and *
. b. Two flow paths from the refueling water storage tank via centrifugal charging pumps to the Reactor Coolant System.
APPLICABILITY: MODES 1, 2. and 3.*
ACTION:
With only one of the above required boron injection flow paths to the Reactor Coolant System OPERABLE, restore at least two boron injection flow patns to the Reactor Coolant System to OPERABLE status within-72 hours or be in at least-HOT STANOBY and borated to a SHUT 00WN MARGIN equivalent to at least
-4:*cak/k at 200*F within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, . restore at' least two flow oaths to OPERABLE status within the next 7 days or be in COLD SHUTOOWN within'the 4,.--next 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br /> . .
((.3?o RVEILLANCE REOUIREMENTS 4.1.2.2 At least two of the above required. flow paths shall be demonstrated OPERABLE:
- a. At_least-once per 31 days by verifying that each valve'(manual, power-operated, or automatic) in the flow path that is not locked, sealed, or otherwise secured in position, is in its correct position;
- b. At least once per 18 months during ' shutdown by verifying that each automatic valve in the flow path actuates to its correct position on a Safety Injection test signal; and
- c. At least once per 18 months by verifying-that the flow cath recuired by Specification 3.1.2.2a. delivers at least 30 gpm to the Reactor Coolant System.
"The provisions of Specifications 3.0.4 and 4.0.4 are not aoolicable for entry into MODE 3 for the centrifugal charging pump declared -inocerable cursuant to Specification 4.1.2.3.2 provided that the centrifugal charging pumo is restored to OPERABLE status within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> or prior to the temcerature of one or more of the RCS cold legs exceecing 375*F, whichever comes first.
WOLF CREEK - UNIT 1 3/4 1-3 9302030124 930128 PDR ADOCK 05000482 p PM ,
Attachm:nt to NA 93-0013 Page 2 of 4
REACTIVITY CONTROL SYSTEMS '
BO, RATED WATER SOURCES - OPERATING LlHITING CONDITION FOR OPERATION 3.1.2.6 As a minimum the following borated water sources shall be OPERLE as required by Specification 3.1.2.2 for MODES 1, 2 and 3 and one of the following borated water sources shall be OPERABLE as required by Specifica-tion 3.1.2.1 for H00E 4:
- a. A Boric Acid Storage System with:
- 1) A minimum contained borated water volume of 17,658 gallors,
- 2) Between 7000 and 7700 ppm of boron, and
- 3) A minimum solution temperature of 65'F.
- b. The refueling water storage tank (RWST) with:
- 1) A minimum contained borated water volume of 394,000 gallons
- 2) Between 2400 and 2500 ppm of boron. l'
- 3) A minimum solution temperature of 37'F, and
- 4) A maximum solution temperature of 100'F.
APPLICABILITY: HODES 1, 2, 3, and 4.
ACTION: 1.
- a. With the Boric Acid Storage System inoperable and being used as one of the above required borated wate sources in H00E 1. 2 or 3, restore the storage system to OPERABLE atus within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STAN0BY within t' a next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and borated to a SHUTOOWN MARGIN equivalent to at least B-Ak/k at 200*F; restore the Boric Acid Storage System to OPERABLE status within the next 7 days or be in COLD SHUT 00WN within the next 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />,
- b. With the RWST inoperable in H00E 1, 2, or 3, restore the tank to OPERABLE status within I hour or be in at least HOT STANOBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUT 00WN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
- c. With no borated water source OPERABLE in NODE 4, restore one borated water source to OPERABLE status within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> or be in COLD SHUT 00VN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
l-WOLF CREEK - UNIT 1 3/4 1-12 Amendment No. 23 l
~ . . -
Attachment to NA 93 0013 Page 3 of 4 3/4.1 REArTIVITY CONTROL SYSTEMS BASES 3/d.1.1 BORATION CONTROL 3/4.1.1.1 and 3/4.1.1.2 5 UTDOWN MARGIN A sufficient SHUTDOWN MARGIN ensures thatt (1) the reactor can be made .
suberitical fr ciated with po,om all accident stulated operating conditions, conditions (2) the rsactivity are controllable within transients acceptable asso-limits, and (3) the reactor will be maintained sufficiently suberitical to preclude inadvertent criticality in the shutdovn condition.
, SHUTDOWN MARGIN requirements vary throughout core life as a function of ,
fuel depletion, RCS boron concentration, and RCS T,y . The most restrictive condition occurs at EOL, with T,yg at no load operat ng temperature, and is associated with a postulated steam line break accident and resulting uncon-trolled RCS cooldewn. In the analysis of this accident, a minimum SHUT 00WN MARGIN of 1.3% ok/k is r'equired to control the reactivity transient.
Accordingly, the SHUTOOWN MARGIN requirement is based upon this limiting condition and is consistent with FSAR safety analysis assumptions. With T,yg less than 200'F, the reactivity transients resulting from a postulated steam line break cooldown are minimal and a,1!It'Ak/k SHUTDOWN MARGIN provides adequate protection.
3/4.1.1 3 MODERATOR TEMPERATURE COEFFICIENT 3
The limitations on moderator temperature coefficient (MTC) are provided to ensure that the value of this coefficient remains within the limiting condition assumed in the FSAR accident and transient analyses.
The MTC values of this specification are applicable to a specific set of plant conditions; accordir; gly, verification of MTC values at conditions other than those explicitly stated will require extrapolation to those conditions in order to permit an accurate comparison.
WOLF CREEK - UNIT 1 B 3/4 1-1
Attachment to NA 93-0013
,Page,4 of 4 ,
REACTIVITY CONTROL SYSTEMS BASES BORAT10N SYSTEMS (Continued)
With the RCS temperature below 200'F, one Boration System is acceptable without single failure consideration on the basis of the stable reactivity condition of the reactor and the additional restrictions prohibiting CORE ALTERATIONS and positive reactivity changes in the event the single Boron Injection System becomes inoperable.
The limite.:.'ve for a maximum of one centrifugal charging pump to be OPERABLE and the Surveillance Requirement to verify all charging pumps except the required OPERABLE pump to be inoperable in H0 DES 4, 5, and 6 provides assurance that a mass addition pressure transient can be relieved by the opera- ,
m tion of a single PORV or an RHR suction relief valve.
Ilbbslhe_ boron _capabilityrequiredbelow200'Fissufficienttoprovidea
^
SHUTDOWN MARGIN of t1Fak/k af ter xenon decay and cooldown from 200*F to 140'T. This condition requirec either 2968 gallons of 7000 ppm borated i water from the boric acid storage tanks or 14,071 gallons of 2400 ppm borated I water from the RWST.
The contained water volume limits include allowance for water not available because of discharge line location and other physical characteristics. In the case of the boric acid tanks, all of the contained volume is considered usuabic. The required usable volume may be contained in either or both of the boric acid tanks.
The limits on contained water volume and boron concentration of the RWST also ensure a pH value of between 8.5 and 11.0 for the solution recirculated
, wit.hin containment after a LOCA. ,Ihis pH band minimizes the evolution _of iodine and minimizes the effect of chloride and caustic stress corrosion on mechanical systems and components.
The OPERABILITY of one Boration System during REFUELING ensures that this system is available for reactivity control while in H0DE 6. >
344.1.3 HOVABLE CONTROL ASSEMBLIES The specifications of this section ensure that: (1) acceptable power distribution limits are maintained, (2) the minimum SHUTDOWN MARGIN is main-tained, and (3) the potential effects of rod misalignment on associated acci-dent ana'yses are limited. OPERABILITY of the control rod position indicators is required to determine control rod positions and thereby ensure compliance with the control rod alignment and insertion limits. Verification that the Digital Rod Position Indicator agrees with the demanded position within i 12 steps at 24, 48, 120, and 228 steps withdrawn for the Control Banks and 18, 210 and 228 steps withdrawn for the Shuthwn Banks provides assurances that the Digital Rod Position Indicator is operating correctly over the full range of indication. Since the Digital Rod Position System does not indicate the actual shutdown rod position betwean 18 steps and 210 steps, only points in the indicated ranges are picked for verification of agreement with demanded position.
WOLF CREEK - UNIT 1 B 3/4 1-3 Amendment No. 23