ML20128B615
| ML20128B615 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 05/17/1985 |
| From: | Youngblood B Office of Nuclear Reactor Regulation |
| To: | Edelman M CLEVELAND ELECTRIC ILLUMINATING CO. |
| References | |
| NUDOCS 8505240605 | |
| Download: ML20128B615 (3) | |
Text
n MAY 171985 4
Docket Nos.: 50-440 and 50-441 i
Mr. Murry R. Edelman, Vice President Nuclear Operations Group The Cleveland Electric Illuminating Company P. O. Box 5000 Cleveland, Ohio 44101
Dear Mr. Edelman:
Subject:
NRC Staff Fidnings Relative to SER License Condition (2) and Implementation of the General Electric Fuel Post-Irradiation Surveillance Program Pertaining to the Perry Nuclear Power Plant (Units 1 and 2)
The staff has completed its review of information transmitted by your letter dated March 19, 1985 (requesting deletion of SER License Condition (2) regarding measurement of fuel channel box deflections) and your letter dated March 26, 1985 (requesting staff acceptability on implementation of the General Electric Fuel Post-Irradiation Surveillance Program).
It has been concluded in the enclosed evaluation report, which we propose to incorporate in the next Perry SER supplement, that your requests have been found acceptable.
Sincerely, B. J. Youngblood, Chief Licensing Branch No. 1 Division of Licensing
Enclosure:
As stated cc: See next page JStefano CBerlinger NRCPOR OELD RLobel LPDR ACRS (16)
SLWu NSIC EJordan PRC System JPartlow LBil R/F BGrimes MRushbrook LRubenstein
- SEE PREVIOUS PAGE FOR CONCURRENCES LBil:0L LB#1:DL
- JStefano:kab
- BJYoungblood 05/16/85 05/16/85 8505240605 850517 PDR ADOCK 05000440 E
_ _g
r ENCLOSURE PERRY, UNITS 1, 2 SSER NO. 7 Fuel System Design 4.2 m
4.2.3.1(e) Dimension Changes.
f Channel Box Deflection ition letter on channel box In SSER Number 2, we concluded that the LRG-II posCompany E
deflection (D.L. Holtzscher, Illinois PowerBy a letter dated March
[
19, 1985 from 17,1982) was acceptable.
the applicant confirmed that f
M. R. Edelman, CEI, to B. J. Youngblood, NRC,flection will be adop i
dated May We, therefore, the LRG-II position on channel box de l Instruction.
incorporated into the Perry Fuel and Technicais satisfactorily addre conclude that the channel box deflection solved.
Perry and the license condition is therefore re g
E Post-irradiation Surveillance 5
4.2.4.3 i radiation surveillance program In our SER, we approved the applicant's post-rNRC, dated April 2 (D. R. Davidson, CEI, letter to A. Schwencer,R. Edelman, CEI, to 26, 1985 from M.
l surveillance program be subtituted a letter dated March d by the NRC NRC, the applicant requested that a GE fue The GE fuel surveillance program was appr h
for the previous one.
in a letter from L. S. Rubenstein (NRC) toWe quest is acceptable 1984.
and the post-irradiation surveillance pro
['
revised to incorporate the GE program.
m e
MAY 1 7 1985 4
~
. PERRY Mr. Murray R. Edelman, Vice President
[
Nuclear Operations Group The Cleveland Electric
-Illuminating Company P. O. Box 5000 Cleveland, Ohio 44101 cc:
Jay-Silberg, Esq.
Mr. Larry 0. Beck Shaw, Pittman, & Trowbridge The Cleveland Electric 1800 M Street, N. W.
Illuminating Company Washington, D. C.
20005 P. O. Box 97 E-210 Perry, Ohio 44081 Donald H. Hauser, Esq.
The Cleveland Electric Illuminating Company P. O. Box 5000 Cleveland, Ohio 44101 Resident Inspector's Office U. S. Nuclear Regulatory Consnission Parmly at Center Road Perry, Ohio 44081 Regional Administrator U. S. NRC, Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 Donald T. Ezzone, Esq.
Assistant Prosecuting Attorney 105 Main Street Lake County Administration Center Painesville, Ohio 44077 Ms. Sue Hiatt 0CRE Interim Representative 8275 Munson Mentor, Ohio 44060 Terry J. Lodge, Esq.
618 N. Michigan Street Suite 105 Toledo, Ohio 43624 John G. Cardinal, Esq.
Prosecuting Attorney Ashtabula County Courthouse Jefferson, Ohio 44047