Submits TMI Program Ofc Weekly Status Rept for Wk of 850506-12
ML20127P846
Person / Time
Site: Crane Constellation icon.png
Issue date: 05/13/1985
From: Travers W
Office of Nuclear Reactor Regulation
To: Harold Denton, Snyder B
Office of Nuclear Reactor Regulation
References
CON-NRC-TMI-85-036, CON-NRC-TMI-85-36 NUDOCS 8505240096
Download: ML20127P846 (4)


Text

, _

g - - - - - - - - ;

g 2%f So - 3 V)b Nay.13, 1985 HRC/THI-85-036

-MEH0RANDUM FOR:

Harold R. Denton, Director Office.of Nuclear Reactor Regulation Bernard J. Snyder, Program Director TMI Program Office f

FROM:

William D. Travers. Deputy Program Director TMI Program Office

SUBJECT:

NRC.TMI PROGRAM 0FFICE WEEKLY STATUS REPORT FOR MAY 6, 1985 - MAY 12, 1985 y.

1.

PLANT-STATUS ~

The facility remains in long term cold shutdown with the Reactor Coolant System (RCS) vented to the reactor building atmosphere and the1 reactor vessel head removed.

RCS cooling is by natural heat loss to the reactor building ambient atmosphere.

Incore thennocouple readings range from 73*F to 94 F with an average of-83*F. Average cold leg temperature is 61*F.

Calculated reactor decay heat is less than 14 kilowatts..

The modified internals indexing fixture is installed on the reactor vessel flange and is flooded to elevation 327 feet 6 inches (15} feet above the top of the core region).

~

The average reactor building temperature is 59 F.

The reactor building airborne activity is 1.3 E-7 uCi/cc tritium, and 1.4 E-10 uCi/cc particulates, predominantly cesium 137.

The reactor vessel plenum has'been raised 71 inches by hydraulic

-jacks and cleared of fuel assembly end fittings in preparation for-

-final removal.

'2.

WASTE MANAGEMENT The Submerged Demineralizer System (SDS) completed processing batch S-117, which was 58,630 gallons from the.RCS.

EPICOR II completed processing batch 253, which was 6,845 gallons S.

from the 'B'. reactor coolant bleed tank ~ (RCBT), and batch 254, which was 7,029 gallons from the 'B' RCBT.

Total volume processed through SDS to date is 2,863,782 gallons, and

.the total volume processed through EPICOR II is 2,447,788 gallons.

I 8505240096 8505'13 IM6T$

. DR ADOCK 0 0

1 4

q-

. [.

g.

ve rom m oomemcu e24c OFFICI AL RECORD COPY

e-

. llarold R, Denton 2

flay 13, 1985 Bernard J. Snyder 3.

DOSE REDUCTION /0ECONTAMINATIO!i ACTIVITIES General cleanup continued in the control and service building.

Scabbling and painting was completed in the 'B' and 'C' RCBT t

cubicles.

Decontamination of the auxiliary building elevator shaft continued.

Cleanup is in progress in the ' A' RCBT cubicle.

Decontamination is in progress in che tendon access gallery.

Average general area radiation dose rate on the 347' level of the reactor building is 36 mrem per hour. Average dose rate on the 305' level is 160 mren per hour.

^

4.-

ENVIRONMENTAL 110NITORING The Lancaster water sample taken at the water works intake and analyzed by the US Environmental Protection Agency consisted of a seven day composite sample taken from April 21, to April 27, 1985. A ganna scan detected no reactor related radioactivity.

TMI water samples taken by the US Environmental Protection Agency at the plant discharge to the river consisted of seven daily composite samples taken from April 20, to April 27, 1985. Gamma scans detected no reactor related radioactivity.

The NRC outdoor air sampler at the THI Site collected a sample between May 3, 1985 and May 8, 1985. Analysis showed I-131 and Cs-137 concentrations less than the icwer limits of detectability.

No reactor related radioactivity was detected.

Based on EPA's sampling results listed above, TNI site liquid effluents are in accordance with regulatory limits, NRC requirenents, and the City of Lancaster Agreement.

5.

REACTOR BUILDING ACTIVITIES The pace of work inside the reactor building has increased to seven working days per week. flost of the in-containment work involve:.

preparations for plenum removal, scheduled for the week of Hay 12, 1985.

Work is in progress to correct mechanical problems identified during testing of the modified fuel transfer system. The fuel transfer system problems must be resolved before the deep end of the fuel transfer canal can be flooded.

6.

AUXILIARY A!!D FUEL HANDLING BUILDING ACTIVITIES Installation of the Defueling Water Cleanup System (DWCS) continued.

Testing of the fuel transfer system and upenders is in progress in the ' A' spent fuel pool.

Boration of the processed water storage tank number 1 is in progress.

The chemistry of this water is being adjusted to provide a source of RCS quality water for flooding of the 'A' spent fuel pool.

/

S" " >

{NRC FW.M 318 (10 80) NRCM 024 -

OFFICIAL. RECORD COPY j

f

.,f-

. - $aroldR.Denton 3

May 13, 1985 Bernard J. Snyder

7.. HRC EVAtUATIONS IN PROGRESS Defueling Water Cleanup System Technical Evaluation Technical Specification Change Requests numbers 46 and 48 Equipment Hatch Removal Safety Evaluation Recovery Operations Plan Change number 27 Fuel Canister Technical Evaluation Fuel Handling Senior Reactor Operator Training Program Defueling Safety Evaluation 8.

PROJECTED SCHEDULE OF FUTURE EVENTS i

Flooding of deep end of FTC: May 14, 1985 Plenum Removal: May 16, 1985 Start of Defuelir.g: September 1985 9.

PUBLIC HEETING The Advisory Panel for the Decontamination of Three Mile Island Unit 2 will meet on May 16, 1985 from 7:00 p.m. to 10:00 p.m.

The meeting, which will be at the Holiday Inn, 23 South Second Street, Harrisburg, Pennsylvania, will be open to the public. At this meeting the Panel will discuss and formulate a position on the level of the Panel's inquiry into health effect studies and data related to the radioactive release during the THI-2 accident. The Panel will also receive a presentation from representatives of General Public Utilities Nuclear Corporation on plans for reactor fuel removal and storage. The Department of Energy will brief the Panel on the current status of fuel shipping casks that will be used for offsite transport of fuel and debris removed from the reactor. The NRC staff will provide the Panel with an update on the status of NRC investi-gations and enforcement actions.

Persons desiring the opportunity to speak before the Panel are asked to contact Mr. Thomas Smithgall at 717-291-1042 or write to him at 2122 Marietta Avenue, Lancaster, Pennsylvania 17603. Persons desiring to submit topics or questiens for consideration by the Panel are asked to contact, in writing, Mayor Arthur Morris,120 North Duke Street, Lancaster, Pennsylvania 17602.

William D. Travers Deputy Program Director a

THI Program Office

........a

.. *=*..*..**

NRC FORM 318 (1080) NRCM O240 OFFICIAL RECORD COPY

m, s

g 4

el sa INTERNAL DISTRIBUTION EDO y

Office Directors Consissioner's Technical Assistants-NRR Division Directors

NRR A/D's.

Regional Administrators

.IE Division Directors TAS-

. EIS :

TMI Program Office Staff (10)

PHS EPA DOE RI Division Directors.

Public-Affairs, RI State Liaison, RI-

. Tl11P0 HQ r/f-Till SITE r/f CENTRAL FILE NRC PDR~

- LOCAL PDR.

Ti1I-2' Project Section File-T Y

OF FICE >

TM TMIP0

~

TMIPO

  • * ^ * >. 9I... as/,1g

,gCoygil DAM)

5. /. t. ). /. 85.....

. 5. /./.$. /85....

5/. p. /. 85.....

85....

unc Fonu ais oosoi nncu ono OFFICIAL RECORD COPY

,