ML20127P218
| ML20127P218 | |
| Person / Time | |
|---|---|
| Site: | Oyster Creek |
| Issue date: | 11/23/1992 |
| From: | Dromerick A Office of Nuclear Reactor Regulation |
| To: | J. J. Barton GENERAL PUBLIC UTILITIES CORP. |
| Shared Package | |
| ML20127P222 | List: |
| References | |
| TAC-M68577, NUDOCS 9212020135 | |
| Download: ML20127P218 (2) | |
Text
- -- -
.g November 23, 1992 Docket Nm 50-219 Distribution:
Docket file ACRS (10)
Mr. John 1. Barton NRC & Local PDRs JfRogge, R1 Vice President and Director PD l-4 Plant GPU Nuclear Corporation SVarga Oyster Creek Nuclear Generating Station JCalvo Post Office Box 388 SNorris Forked River, New Jersey 08731 ADrom6 rick OGC
Dear Mr. Barton:
DShum
SUBJECT:
SUPPLEMENTAL SAFETY EVALUATION (SSE) OYSTEN CREEK NUCLEAR GENERATING STATION - STATION BLACK 0UT ROLE (TAC NO. M68577)
In the Supplemental Safety Evaluation (dated February 12. 1992) regarding GPU Nuclear Corporation's (GPUN) compliance with the Station Blackout (SB0) Rule, 10 CfR 50.63, the staff stated its positions that the GPUN should establish an administrative procedure to ensure that during normal operation, the control room temperature does not exceed the initial control room temperature used in the heat-up calculation and should include a provision in their station blackout procedures, in accordance with NUMARr, 87-00, to open the control room cabinet doors within 30 minutes following the onset of an SB0 event. By letter dated October 22, 1992, GPUN provided responses to the above staff's positions.
The staff has reviewed GPUN's responses and finds them acceptable, i
Enclosed is the staff's eva;uation.
In your letter of October 7,1991, you advised that modifications, associated procedure changes, and su3 porting documentation for Station Blackout are er;ected to be completed )y the end of refueling outage 14R, which is currently scheduled for November 28, 1992.
Please advise the staff when all modifications related to Station Blackout have been implemented.
Based on.the above, we consider issues related to Station Blackout (TAC No. M68577) to be closed.
Sincerely, f
O' '
Alexander W. Dromerick, Senior Project Manager Project Directorate 1-4 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
Enclosure:
As stated f4 t=
cc w/ enclosure:
See next page om LA:PDI-4 PM:l91-4 4 D:f01-4 t
SM-Ad:bbn JStol b '-
hAME D^tt l l /,2492
///h/92
// /b/92
/ /
/ /
OfflCIAL RECORD COPY n
Document-Name:gGg0E1C\\68577.580 9212020135 921123 PDR ADOCK OM00219
-t P
pon
~
Mr. John J. Barton Oyster Creek Huclear GPU Nuclear Corporatiori Cenerating Station CC:
Ernest L. Blake, Jr., Esqcire Resident inspector Shaw, Pittman, Potts & Trowbridge c/o 'U.S. Nuclear Regulatory Commission 2300 N Street. NW.
Post Office Box 445 Washington, DC 20037 Forked River, New Jerst
'31 Regional Administrator, Region 1 Kent Tosch, Chief U.S. Nuclear Regulatory Commission New Jersey Department ef 475 Allendale Road Environmental-Protection King of Prussia, Pennsylvania 19406 Bureau of Nuclear Engineering CN 415 BWR Licensing Mancoci-Trenton, New Jersey 08625 GPU Nuclear Corporation 1 Upper Pond Road Parsippany, New Jersey 07034 Mayor Lacey Township 818 West Lacey Road Forked River, New Jersey 08731 Licensing Manager Oyster Creek Nuclear Generating Station Mail Stop:
Site Em9rgency 0109 Post Office Box 38S Forked River, New Jersey 08731 l
l L
.. ~. - - -
,