ML20127N190
| ML20127N190 | |
| Person / Time | |
|---|---|
| Site: | Summer |
| Issue date: | 06/28/1985 |
| From: | Dixon O SOUTH CAROLINA ELECTRIC & GAS CO. |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| References | |
| GL-85-07, GL-85-7, NUDOCS 8507010466 | |
| Download: ML20127N190 (2) | |
Text
.
e
~
-i l
f.
.e 3 1 Q;g South CAROLINA ELECTRIC & GAS COMPANY
+
'O #
post oprict 764 ColutselA South CAmoLINA 29218 Jtine 28,1985
- o. w. os.oN. ;..
VICE PetStOENT L
NUCLtan C,anAfloNS Mr. Harold R. Denton, Director i,0ffice of Nuclear Reactor Regulations
' U. S. Nuclear Regulatory Commission
- Washington, DC 20555
.?
.~
Subject:
Virgil C. Summer Nuclear Station
"~
Docket No. 50/395 Operating License No. NPF-12
^x
^
Ceneric Letter 85 Implementation of Integrated
(
Schedules for Plant Modification 5
. Dest Mr. Denton
__ On May 10,1985, - South Carolina Electric and Gas Company (SCE&G) received Generic Letter 85-07, " Implementation of Integrated Schedules for Plant
' Modifications". This letter requested SCE&G's views on the Intergrated Living
- F:
Schedule concept. This' information is' submitted _via the form provided with the
~
Generic Letter as Enclosure 1 to this letter.
6 If you should have any questions, please advise at your convenience.
t:
Very truly yours,
/
i t
O. W. D' r.
g.
HID/0WD /csw
-Enclosure s
cc:
V. C. Summer C. A. Price T.' C.L Nichols, Jr./0. W. Dixon, Jr.
C. L. Ligon (NSRC) l l
E. H. Crews, Jr.
K. E. Nodland
. E. C. Roberts R. A. Stough t
W. A., Williams, Jr.
G. O. Percival D. A. Nauman C. W. Hehl J. Nelson Grace J. B. Knotts, Jr.
Group Managers NPCF O. S. Bradham File r
I h
l 8507010466 850628 PDR ADOCK 05000395
(
P PDR I
L e
p ENCLOSURE RESPONSE FORMAT - GENERIC LETTER 85-07 PLANT NAME:
Virgil C. Summer Nuclear Station UTILITY:
South Carolina Electric and Gas Company (SCE&G)
-I.
INTENTIONS
.A.
Intend to work with the staff to develop an ILS B.
Have reservations that must be resolved before developing ILS C.
Do not presently intend to negotiate an ILS with the staff x
D.
Plan to implement an informal ILS only x
II.
STATUS A.
If you answered I.A above:
1.
Have you settled on a method for prioritizing the work at your plant (s)?
Circle One:
Yes No If yes, select best description:
Engineering judgement Analytic Hiearchy process Risk based analysis Cost-benefit analysis Other (please describe)
If no, provide estimated date for selecting a methodology:
Date i
or l
If not presently available, provide estimated l
date for scheduling the selection of a methodology:
2.
What is your estimated date for making a submittal to the NRC-or If not presently available, planned date for l:
scheduling a submittal to the NRC (Continued on Back)
~ --
.sw3 ww
,y-B.
If you answered I.B above:
1.
Please explain your reservations on separate sheet (s) or provide your schedule for supplying an explanation See separate sheet (s) or Separate submittal scheduled for (Date) 2.
If available to meet with the staff to-discuss your concerns, propose a time frame for such a meeting and provide a contact that can make arrangements Contact / Time Frame Phone Number C.
If you answered I.C 1.
Would you be willing to meet with the staff to discuss the development of an ILS for your facilityfs)?
Circle One:
Yes
- 2n If yes, propose a time frame for such a meeting and provide a contact that can make arrangements.
Contact A.
M.
- Paglia, Jr.,
Manager, Nuclear Licensing Time Frame To be determined Phone Number (803)748-39 61 If no, any constructive comments you have would be appreciated.
III.
ADDITIONAL ITEMS Please make any supgestions you may have as to how a utility sponsored availability / reliability pro.iect might be credited for plant safety enhancement.
Provide additional constructive comments as appropriate.
- SCE6G is developing 18 month and 5 year plans for station activities.
A meeting with the Staff may be beneficial to discuss the utilization of these plans in Licensing activities; however, no benefit to either the NRC or SCE6G is seen in incorporating an ILS in the Operating License.
t
.