ML20127M756
| ML20127M756 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 05/31/1985 |
| From: | Brownlee V NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Tucker H DUKE POWER CO. |
| Shared Package | |
| ML20127M760 | List: |
| References | |
| NUDOCS 8507010347 | |
| Download: ML20127M756 (1) | |
See also: IR 05000414/1985017
Text
-
lha
t
MAY 311985
Duke. Power Company
ATTN: Mr. H. B. Tucker, Vice President
Nuclear Production Department
422 South Church Street
Charlotte, NC 28242
Gentlemen:
SUBJECT:
REPORT N0. 50-414/85-17
On May 13 - 17, 1985, NRC inspected activities authorized by NRC Construction
Permit No. CPPR-117 for your Catawba facility.
At the conclusion of the
inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection censisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
Within the scope of the inspection, no violations or deviations were identified.
Should you have any questions concerning this letter, please contact us.
Sincerely,
4
/
Virgil L. Brownlee, Chief
Reactor Projects Branch 2
Division of Reactor Projects
.
Enclosure:
Inspection Report No. 50-414/85-17
.cc w/ encl:
R. L. Dick, Vice President - Construction
J. W. Hampton, Station Manager
bec w/ encl:
G. Johnson, ELD
K. N. Jabbour, NRR
0507010347B505j434
Document Control Desk
ADOCK 050
State of South Carolina
G
RjI
Rif
RII
RII
'fw h
Sv
+fp
JMathis:sa
KVanDyne
FJa e
AHerdt
05/2i/85
05/29/85
05g /85
05/n/85
3
s\\
.LE~o I