ML20127M736
ML20127M736 | |
Person / Time | |
---|---|
Site: | Diablo Canyon |
Issue date: | 06/27/1985 |
From: | Pate R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
To: | Shiffer J PACIFIC GAS & ELECTRIC CO. |
Shared Package | |
ML20127M740 | List: |
References | |
NUDOCS 8507010340 | |
Download: ML20127M736 (1) | |
Similar Documents at Diablo Canyon | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML16341D1311999-10-15015 October 1999
[Table view]Discusses Arrangements Made During 991013 Telephone Conversation for Administration of Licensing Exams at Diablo Canyon Power Plant Facility During Wks of 990410 & 990417. Requests Submittal of Ref Matls by Jan 15,2000 ML16341D1291999-10-14014 October 1999 Forwards Insp Repts 50-275/99-15 & 50-323/99-15 on 990920- 24.Two Severity Level 4 Violations Occurred & Being Treated as NCVs ML16342B9961999-10-0606 October 1999 Refers to OI Investigation 4-1998-029 in Response to Complaints from Shift Foreman of Alleged Retaliation for Reporting Safety Concerns.Allegations Not Substantiated ML16342A9081999-09-30030 September 1999 Informs That Staff Review of Util 980327 Response to GL 96-06, Degradation of SG Internals, Did Not Identify Any New Concerns & Concludes That Util Response to GL Provides Reasonable Assurance That Conditions of SG Compliant IR 05000275/19990071999-09-29029 September 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-275/99-07 & 50-323/99-07 on 990727 ML16342A9091999-09-29029 September 1999 Forwards SER Granting Requests for Relief NDE-12.2R8, NDE-13-2R8,NDE-14.2R8,NDE-22.2R8 & NDE-25.2R8 Pursuant to 10CFR50.55a(g)(6)(i) for Second 10-year ISI Interval for Diablo Canyon,Unit 2 ML16342A8981999-09-20020 September 1999 Requests That PG&E Update ERDS Dpls Submitted in to Provide Missing Info ML20212B1681999-09-13013 September 1999 Forwards Insp Repts 50-275/99-12 & 50-323/99-12 on 990711- 08-21.Four Violations Being Treated as Noncited Violations ML16342A8881999-08-25025 August 1999 Forwards Insp Repts 50-275/99-13 & 50-323/99-13 on 990802- 06.No Violations Noted.Purpose of Insp,To Review Solid Radioactive Waste Mgt & Radioactive Matls Transportation Programs ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210H6181999-07-27027 July 1999 Forwards Insp Repts 50-275/99-07 & 50-323/99-07 on 990503- 0714.Apparent Violations Being Considered for Escalated Enforcement Action ML16342A8461999-06-30030 June 1999 Discusses Closeout of Responses to RAI Re GL 92-01,Rev 1, Suppl 1, Rv Structural Integrity, for Plant,Units 1 & 2 ML18107A7011999-06-25025 June 1999 Requests Rev of NRC Records to Reflect Change of PG&E Address IR 05000275/19990061999-06-25025 June 1999 Forwards Insp Repts 50-275/99-06 & 50-323/99-06 on 990418-0529.Two Violations Occurred & Being Treated as Noncited Violations,Consistent with App C of Enforcement Policy DCL-99-081, Forwards Rev 15 to Diablo Canyon Power Plant,Units 1 & 2 IST Program Plan.Detailed Summary of Changes to IST Program Plan,Encl1999-06-18018 June 1999 Forwards Rev 15 to Diablo Canyon Power Plant,Units 1 & 2 IST Program Plan.Detailed Summary of Changes to IST Program Plan,Encl ML16342A8271999-06-16016 June 1999 Announces Corrective Action Program Insp at Plant,Units 2 & 2,reactor Facilities on 990726-30.Insp Will Evaluate Effectiveness of Activities for Identifying,Resolving & Preventing Issues That Degrade Quality of Plant Operations ML16342A8151999-06-0909 June 1999 Ack Receipt of Ltr Dtd 990312,which Transmitted Change 16, Rev 18 to Physical Security Plan for Diablo Canyon Under Provisions of 10CFR50.54(p).No NRC Approval Required ML16342A8081999-06-0808 June 1999 Ack Receipt of Which Transmitted Changes to Diablo Canyon Power Plant Emergency Plan Implementing Procedures EP G-1,Emergency Classifications & EP Activation, Rev 27,under Provisions of 10CFR50,App E,Section V ML16342A8061999-06-0808 June 1999 Ack Receipt of Which Transmitted Changes to Diablo Canyon NPP Er Plan Implementing Procedures,Ep G-1, Emergency Classification & Ep,Activation,Rev 28,under 10CFR50,App E,Section V Provisions.No NRC Approval Required ML16342C1221999-06-0808 June 1999 Ack Receipt of Which Transmitted Changes to Diablo Canyon Power Plant Emergency Plan,Rev 3,Change 17, Under Provisions of 10CFR50,App E,Section V ML16342C1211999-06-0303 June 1999 Refers to 990602 Meeting with Util in Arlington,Tx Re Planned Electrical Configuration for Refueling Outage 2R9 During Midloop Operation.List of Attendees & Handouts Used by Util Encl ML16342A7951999-05-25025 May 1999 Informs of NRR Reorganization Effective 990328 & That as Part of Reorganization,Div of Licensing Project Mgt Was Created.Reorganization Chart Encl ML16342A7891999-05-14014 May 1999 Forwards Insp Repts 50-275/99-04 & 50-323/99-04 on 990307-0417.Four Violations Identified & Being Treated as non-cited Violations ML16342C1141999-05-0606 May 1999 Forwards Results of Gfes of Written Operator Licensing Exam, Administered on 990407 to Nominated Employees of Facility. Requests That Training Dept Forward Individual Answer Sheets & Results to Appropriate Individuals ML16342A7691999-04-14014 April 1999 Requests That First Page of Ltr Transmitting NRC Insp Repts 50-275/99-03 & 50-323/99-03 Be Replaced with Encl Page. Initial Transmittal Contained Minor Editorial Error ML16342A7571999-04-0808 April 1999 Forwards SER Accepting Util Emergency Core Cooling Sys Manual & Automatic Switchover from Refueling Water Storage Tank to Containment Sump for Diablo Canyon Power Plant ML20205J3381999-04-0808 April 1999 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Directors Decision Expired. Commission Declined Any Review & Became Final Agency Action on 990406.With Certificate of Svc.Served on 990409 IR 05000275/19990031999-04-0505 April 1999 Corrected Ltr Forwarding Insp Repts 50-275/99-03 & 50-323/99-03 on 990124-0306.Minor Editorial Error Corrected on First Page DCL-99-038, Forwards Decommissioning Funding Repts for Diablo Canyon Power Plant,Units 1 & 2 & Humboldt Bay Power Plant,Unit 3, Per Requirements of 10CFR50.75(f)1999-03-31031 March 1999 Forwards Decommissioning Funding Repts for Diablo Canyon Power Plant,Units 1 & 2 & Humboldt Bay Power Plant,Unit 3, Per Requirements of 10CFR50.75(f) ML16342A7381999-03-23023 March 1999 Refers to PG&E SG 90-day Rept, 90-Day Rept for Voltage- Based Alternate Repair Criteria - Unit 2 Eighth Refueling Outage, Dtd 980628.Forwards SE Concluding PG&E Implemented voltage-based Criteria in Accordance with Licensing Basis ML16342A7341999-03-18018 March 1999 Forwards FEMA Final Rept for 981104,emergency Preparedness Exercise.Rept Indicates No Deficiencies During Exercise, However 7 Areas Requiring Corrective Action Identified DCL-99-033, Forwards Change 16 to Rev 18 of Diablo Canyon Power Plant Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Safeguards Effectiveness of Plan.Without Encl1999-03-12012 March 1999 Forwards Change 16 to Rev 18 of Diablo Canyon Power Plant Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Safeguards Effectiveness of Plan.Without Encl IR 05000275/19980201999-02-19019 February 1999 Forwards Insp Repts 50-275/98-20 & 50-323/98-20 on 981206- 990123 & Notice of Violation Re Failure to Obtain Transient Combustible Permits for Storing Compressed Gas Cylinders Containing Flammable Hydrogen Into safety-related Areas ML16342A6881999-02-16016 February 1999 Forwards Insp Repts 50-275/99-301 & 50-323/99-301 on 990125- 28.No Violations Noted.Insp Included Evaluation of Six Applicants for Senior Operator Licenses.All Applicants Satisfied Requirements of 10CFR55 ML16342C0931999-02-0909 February 1999 Informs That by Ltrs & 1223,NRC Responded to WOG Positions Re Corrective Actions to Address Generic Aspects of part-length Control Rod Drive Mechanism Housing Issue as Result of Leak at Prairie Island Unit 2 on 980123 ML16342A6981999-02-0303 February 1999 Refers to Investigation Conducted by OIG Re Activities at Dcnpp.Informs That Based on Evidence Developed During Investigation,Testimony & Document Reviews,Allegation Re Employee Discrimination Not Substantiated.Synopsis Encl ML16342C0911999-02-0202 February 1999 Informs of Plans to Administer Gfes of Written Operator Licensing Exam at PG&E Facility on 990407.Names of Candidates for Exam & Personnel Proctoring Exam Requested by 990305 ML16342A6691999-01-29029 January 1999 Refers to 990115 Meeting Conducted at San Luis Obispo.Staff Presented Results of Safety Culture Survey.Survey Addressed Identification & Resolution of Problems & Mgt Influence.List of Attendees,Presentation Slides & Summary of Survey Encl ML16342A7151999-01-29029 January 1999 Discusses 990115 Meeting Conducted at Embassy Suites in San Luis Obispo Re Results of Util Safety Culture Survey. List of Attendees,Presentation Slides & Summary of Safety Culture Survey Provided by Licensee Encl ML16342A6701999-01-29029 January 1999 Forwards Request for Addl Info Re 970310 PG&E Rev 1 of W Technical Rept of WCAP-14797 (Proprietary) & WCAP-14798 (non-proprietary), Generic W* Tube Plugging Criteria for 51 Series Generator Tubesheet Region Wextex Expansions DCL-99-010, Forwards Change 15 to Rev 18 of Dcnpp Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Effectiveness of Plan.Encl Withheld1999-01-26026 January 1999 Forwards Change 15 to Rev 18 of Dcnpp Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Effectiveness of Plan.Encl Withheld DCL-99-005, Forwards Responses to 981105 & 981118 RAIs Re LAR 98-06,to Revise RCS Pressure & Temperature Limit Curves to Be Applicable Through 16 Efpy.Rev 0 to Calculation N-NCM-97009, Included1999-01-22022 January 1999 Forwards Responses to 981105 & 981118 RAIs Re LAR 98-06,to Revise RCS Pressure & Temperature Limit Curves to Be Applicable Through 16 Efpy.Rev 0 to Calculation N-NCM-97009, Included ML20202A9831999-01-18018 January 1999 Informs That Modesto Irrigation District No Longer Seeking Addl Interconnection with Pacific Gas & Electric Co at Pittsburg,Ca & Matters First Addressed in 980429 Comments in Opposition to Restructuring of Util Have Now Become Moot IR 05000275/19980121999-01-13013 January 1999 Informs That Insp Repts 50-275/98-12 & 50-323/98-12 Have Been Canceled ML16342A6451999-01-12012 January 1999 Discusses Insp Repts 50-275/98-21 & 50-323/98-21 on 981204-18 & Forwards Nov.Violation Identified,Involving Two Examples of Failure to Meet NRC Requirements.Insp Focused on Operator Performance in Response to 981201 Manual RT IR 05000275/19980151999-01-0707 January 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Exercise Weaknesses Noted in Insp Repts 50-275/98-15 & 50-323/98-15 on 981120 ML16342A6391999-01-0606 January 1999 Forwards Insp Repts 50-275/98-17 & 50-323/98-17 on 981102-05 & 1207-11.No Violations Identified ML16342A6431999-01-0505 January 1999 Refers to NRC 981230 Response to D Lochbaum 981124 Petition That Request Mod of Operating Licenses for Diablo Canyon. Correct Date for Public Meeting Should Have Been 990115, Instead of 990111 ML16342C0811998-12-30030 December 1998 Forwards Safety Evaluation Re Inservice Testing Relief Request P-RR5, Auxiliary Saltwater Pump Performance Using Evaluation of Pump Curves 1999-09-30 Category:NRC TO UTILITY MONTHYEARML16341F8831990-11-0909 November 1990
[Table view]Forwards Insp Repts 50-275/90-23 & 50-323/90-23 on 900902- 1013.No Violations Noted ML16341F8871990-11-0808 November 1990 Forwards Mgt Meeting Repts 50-275/90-26 & 50-323/90-26 on 901105 ML20058B5331990-10-22022 October 1990 Forwards Partially Withheld Safeguards Insp Repts 50-275/90-17 & 50-323/90-17 on 900924-28.Licensee Identified Violations Reviewed But Not Cited ML16341F8611990-10-19019 October 1990 Forwards Insp Repts 50-275/90-25 & 50-323/90-25 on 900917-1016.No Violations Noted ML16341F8501990-10-16016 October 1990 Advises That Rev 3,Change 10 to Emergency Plan Meets Stds in 10CFR50.47(b) & Requirements of 10CFR50,App E IR 05000323/19900131990-10-0202 October 1990 Ack Receipt of 900813 & 0919 Responses to Violations Noted in Insp Rept 50-323/90-13 Re Signature Responsibility ML16342B7011990-09-25025 September 1990 Advises That Presentation of Certificates to Licensed Operators Scheduled for 901012 ML16341F8411990-09-24024 September 1990 Forwards Insp Repts 50-275/90-19 & 50-323/90-19 on 900722- 0901.No Violations Noted.Mgt Meeting Will Be Scheduled ML16341F8051990-09-0707 September 1990 Forwards Insp Repts 50-275/90-20 & 50-323/90-20 on 900813-17.No Violations Noted ML17083C3061990-08-31031 August 1990 Forwards Insp Repts 50-275/90-21 & 50-323/90-21 on 900813-17.One Noncited Violation Noted ML17083C2931990-08-13013 August 1990 Forwards Insp Repts 50-275/90-15 & 50-323/90-15 on 900610-0721.No Violations Noted.Weaknesses Identified ML16341F7781990-08-0202 August 1990 Discusses Generic Fundamentals Exam on 900606 & Forwards Exam Form W/Answers & Results IR 05000275/19900081990-07-13013 July 1990 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-275/90-08 & 50-323/90-08 ML17095A5601990-06-29029 June 1990 Forwards Ltr to Rc Mcdiarmid That Transmits Directors Decision DD-90-3 Issued on 900614,per 10CFR2.206.Notice of Issuance Also Encl.W/O Encls ML17083C2621990-06-14014 June 1990 Forwards Notice of Violation Re Antitrust License Conditions (6),7(a),7(d) & 9(a).Directors Decision Also Encl ML20059M9781990-06-13013 June 1990 Forwards NRC Performance Indicators for First Quarter 1990. W/O Encl ML16341F7361990-06-0707 June 1990 Grants Temporary Waiver of Compliance from Tech Spec 3.3.1 Requirement Re Reactor Coolant Pump Underfrequency Reactor Trip Instrumentation,Per 900601 Request IR 05000275/19900021990-06-0505 June 1990 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-275/90-02 & 50-323/90-02.Actions Will Be Verified During Future Insp ML16341F7241990-05-25025 May 1990 Forwards Insp Repts 50-275/90-14 & 50-323/90-14 on 900430- 0504 & Notice of Violation ML16342B6761990-05-25025 May 1990 Forwards SER Accepting Response to NRC Bulletin 88-002, Rapidly Propagating Fatigue Cracks in Steam Generator Tubes ML16341F7311990-05-23023 May 1990 Forwards Insp Repts 50-275/90-11 & 50-323/90-11 on 900402-0504.Violation Noted But Not Cited ML20043C3631990-05-23023 May 1990 Forwards State of CA 1988 Environ Radiological Measurements Rept,Per Cooperative Agreement NRC-32-83-684.State Obtains & Analyzes Samples of Environ Media to Verify Adequacy of Environ Radiological Measurements ML16341F7041990-05-18018 May 1990 Advises That Response to Generic Ltr 88-11, NRC Position on Radiation Embrittlement of Reactor Vessel Matls & Impact on Plant Operations Acceptable,Based on Mods Approved Via Amends 54 & 53 to Licenses DPR-80 & DPR-82,respectively IR 05000275/19900051990-05-0909 May 1990 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-275/90-05 & 50-323/90-05 IR 05000275/19890321990-05-0707 May 1990 Discusses Final SALP Repts 50-275/89-32 & 50-323/89-32 for Period Aug 1988 - Dec 1989 ML16341F6771990-04-27027 April 1990 Forwards Request for Addl Info Re Soil Structure Interaction at Plant Based on Questions Raised During 891102-03 Soil Structure Interaction Meeting in San Francisco.Response Requested by 900615 ML16341F6701990-04-26026 April 1990 Requests Addl Info Re NRC Review of long-term Seismic Program ML16341F6811990-04-23023 April 1990 Ack Receipt of Requesting Exemption from 10CFR26 on Behalf of Certain Employees at Plant ML20034B4981990-04-20020 April 1990 Forwards Insp Repts 50-275/90-02 & 50-323/90-02 on 900205-14 & Notice of Violation.Util Should Adhere to Procedures Re Method for Control of Personnel Access Into Vital Areas.Rept & Notice of Violation Withheld (Ref 10CFR73.21) ML16341F6781990-04-16016 April 1990 Forwards SALP Mgt Meeting Repts 50-275/90-12 & 50-323/90-12 on 900322.Comments Re Meeting May Be Provided within 30 Days of Ltr Date ML16341F6601990-04-12012 April 1990 Forwards Documents & Request for Addl Info Re NRC Review of long-term Seismic Program During 900430 & 0501 Ground Motion Meeting ML16341F6631990-04-0404 April 1990 Forwards Insp Repts 50-275/90-05 & 50-323/90-05 on 900128-0310 & Notice of Violation IR 05000275/19890291990-04-0202 April 1990 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-275/89-29 & 50-323/89-29 IR 05000275/19900011990-04-0202 April 1990 Forwards Insp Repts 50-275/90-01 & 50-323/90-01 on 900108-12 & 0122-0202 & Notice of Violation IR 05000275/19900071990-03-27027 March 1990 Forwards Enforcement Conference Repts 50-275/90-07 & 50-323/90-07 on 900316.Repts Withheld (Ref 10CFR2.790 & 73.21) ML16341F6211990-03-19019 March 1990 Ack Receipt of Informing NRC of Steps Taken to Correct Violations in Insp Repts 50-275/89-22 & 50-275/89-27.Util Corrective Actions Will Be Verified During Future Insp ML16341F6121990-03-16016 March 1990 Confirms Telcon Re SALP Licensee Meeting at Plant on 900322. Proposed Agenda & Internal Meeting Notice Encl IR 05000275/19900061990-03-16016 March 1990 Forwards Mgt Meeting Repts 50-275/90-06 & 50-323/90-06 on 900216 Re QA Performance & Util Anticipated Changes to Improve Performance.Qa Not Totally Effective in Identifying Precursors to Programmatic Weaknesses ML16341F6051990-03-14014 March 1990 Forwards Request for Addl Info Re NRC Review of Plant PRA Performed for long-term Seismic Program,Resulting from Review of Util Presentations at Recent Technical Meetings & Written Submittals ML16341F6321990-03-13013 March 1990 Forwards Initial SALP Repts 50-275/89-32 & 50-323/89-32 for Aug 1988 - Dec 1989.Overall Performance Rated as Generally Good.Concerns Noted Re Licensee Slowness in Recognizing Problem Areas & Implementing Corrective Actions ML20033E2771990-03-0303 March 1990 Forwards Safeguards Insp Repts 50-275/90-02 & 50-323/90-02 on 900205-14.Violations Noted Re Unauthorized Access Inside Vital Areas & Failure to Rept to NRC Loss of Compensatory Security Measures.Insp Repts Withheld (Ref 10CFR2.790) ML16341F5871990-03-0202 March 1990 Confirms 900226 Telcon Re Scheduling of Enforcement Conference at Facility on 900316 to Discuss Violations Noted During Last Security Insp ML16341F6151990-02-28028 February 1990 Forwards Insp Repts 50-275/89-34 & 50-323/89-34 on 891210-900127 & Notice of Violation ML16341F5771990-02-23023 February 1990 Forwards Request for Addl Info Re NRC Review of Plant long- Term Seismic Program Covering Geology,Geophysics & Seismology Issues.Info Should Be Provided by 900331 to Prepare for mid-Apr 1990 Meeting IR 05000275/19890311990-02-13013 February 1990 Discusses Special Insp Repts 50-275/89-31 & 50-323/89-31 on 891017-1211 & Forwards Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $50,000.Violations Discussed During 891219 Enforcement Conference ML16342B6461990-02-13013 February 1990 Advises That 900125 Proposed Changes to QA Program Submitted for Update of Chapter 17 to FSAR Acceptable ML16341F5261990-02-0202 February 1990 Discusses Insp Repts 50-275/89-29 & 50-323/89-29 on 891120-22 & Forwards Notice of Violation ML16341F5191990-01-22022 January 1990 Requests Response to Stated Questions Re Excess Overtime Usage W/O Appropriate Mgt Approvals & LER 1-89-17,dtd 900111,within 30 Days,Per Licensee 900102 Response to Insp Repts 50-275/89-23 & 50-323/89-23 ML16341F5161990-01-19019 January 1990 Forwards Listed Documents,Including M Reich Re Task Assignment 17,FIN A-3841 & Ltr Rept-08, Review of Sys Analysis... & Requests Addl Info Re NRC Review of Plant long-term Seismic Program IR 05000275/19890251990-01-16016 January 1990 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-275/89-25 & 50-323/89-25 1990-09-07 Category:OUTGOING CORRESPONDENCE MONTHYEARML16341D1311999-10-15015 October 1999
[Table view]Discusses Arrangements Made During 991013 Telephone Conversation for Administration of Licensing Exams at Diablo Canyon Power Plant Facility During Wks of 990410 & 990417. Requests Submittal of Ref Matls by Jan 15,2000 ML16341D1291999-10-14014 October 1999 Forwards Insp Repts 50-275/99-15 & 50-323/99-15 on 990920- 24.Two Severity Level 4 Violations Occurred & Being Treated as NCVs ML16342B9961999-10-0606 October 1999 Refers to OI Investigation 4-1998-029 in Response to Complaints from Shift Foreman of Alleged Retaliation for Reporting Safety Concerns.Allegations Not Substantiated ML16342A9081999-09-30030 September 1999 Informs That Staff Review of Util 980327 Response to GL 96-06, Degradation of SG Internals, Did Not Identify Any New Concerns & Concludes That Util Response to GL Provides Reasonable Assurance That Conditions of SG Compliant ML16342A9091999-09-29029 September 1999 Forwards SER Granting Requests for Relief NDE-12.2R8, NDE-13-2R8,NDE-14.2R8,NDE-22.2R8 & NDE-25.2R8 Pursuant to 10CFR50.55a(g)(6)(i) for Second 10-year ISI Interval for Diablo Canyon,Unit 2 IR 05000275/19990071999-09-29029 September 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-275/99-07 & 50-323/99-07 on 990727 ML16342A8981999-09-20020 September 1999 Requests That PG&E Update ERDS Dpls Submitted in to Provide Missing Info ML20212B1681999-09-13013 September 1999 Forwards Insp Repts 50-275/99-12 & 50-323/99-12 on 990711- 08-21.Four Violations Being Treated as Noncited Violations ML16342A8881999-08-25025 August 1999 Forwards Insp Repts 50-275/99-13 & 50-323/99-13 on 990802- 06.No Violations Noted.Purpose of Insp,To Review Solid Radioactive Waste Mgt & Radioactive Matls Transportation Programs ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210H6181999-07-27027 July 1999 Forwards Insp Repts 50-275/99-07 & 50-323/99-07 on 990503- 0714.Apparent Violations Being Considered for Escalated Enforcement Action ML16342A8461999-06-30030 June 1999 Discusses Closeout of Responses to RAI Re GL 92-01,Rev 1, Suppl 1, Rv Structural Integrity, for Plant,Units 1 & 2 IR 05000275/19990061999-06-25025 June 1999 Forwards Insp Repts 50-275/99-06 & 50-323/99-06 on 990418-0529.Two Violations Occurred & Being Treated as Noncited Violations,Consistent with App C of Enforcement Policy ML16342A8271999-06-16016 June 1999 Announces Corrective Action Program Insp at Plant,Units 2 & 2,reactor Facilities on 990726-30.Insp Will Evaluate Effectiveness of Activities for Identifying,Resolving & Preventing Issues That Degrade Quality of Plant Operations ML16342A8151999-06-0909 June 1999 Ack Receipt of Ltr Dtd 990312,which Transmitted Change 16, Rev 18 to Physical Security Plan for Diablo Canyon Under Provisions of 10CFR50.54(p).No NRC Approval Required ML16342C1221999-06-0808 June 1999 Ack Receipt of Which Transmitted Changes to Diablo Canyon Power Plant Emergency Plan,Rev 3,Change 17, Under Provisions of 10CFR50,App E,Section V ML16342A8061999-06-0808 June 1999 Ack Receipt of Which Transmitted Changes to Diablo Canyon NPP Er Plan Implementing Procedures,Ep G-1, Emergency Classification & Ep,Activation,Rev 28,under 10CFR50,App E,Section V Provisions.No NRC Approval Required ML16342A8081999-06-0808 June 1999 Ack Receipt of Which Transmitted Changes to Diablo Canyon Power Plant Emergency Plan Implementing Procedures EP G-1,Emergency Classifications & EP Activation, Rev 27,under Provisions of 10CFR50,App E,Section V ML16342C1211999-06-0303 June 1999 Refers to 990602 Meeting with Util in Arlington,Tx Re Planned Electrical Configuration for Refueling Outage 2R9 During Midloop Operation.List of Attendees & Handouts Used by Util Encl ML16342A7951999-05-25025 May 1999 Informs of NRR Reorganization Effective 990328 & That as Part of Reorganization,Div of Licensing Project Mgt Was Created.Reorganization Chart Encl ML16342A7891999-05-14014 May 1999 Forwards Insp Repts 50-275/99-04 & 50-323/99-04 on 990307-0417.Four Violations Identified & Being Treated as non-cited Violations ML16342C1141999-05-0606 May 1999 Forwards Results of Gfes of Written Operator Licensing Exam, Administered on 990407 to Nominated Employees of Facility. Requests That Training Dept Forward Individual Answer Sheets & Results to Appropriate Individuals ML16342A7691999-04-14014 April 1999 Requests That First Page of Ltr Transmitting NRC Insp Repts 50-275/99-03 & 50-323/99-03 Be Replaced with Encl Page. Initial Transmittal Contained Minor Editorial Error ML16342A7571999-04-0808 April 1999 Forwards SER Accepting Util Emergency Core Cooling Sys Manual & Automatic Switchover from Refueling Water Storage Tank to Containment Sump for Diablo Canyon Power Plant ML20205J3381999-04-0808 April 1999 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Directors Decision Expired. Commission Declined Any Review & Became Final Agency Action on 990406.With Certificate of Svc.Served on 990409 IR 05000275/19990031999-04-0505 April 1999 Corrected Ltr Forwarding Insp Repts 50-275/99-03 & 50-323/99-03 on 990124-0306.Minor Editorial Error Corrected on First Page ML16342A7381999-03-23023 March 1999 Refers to PG&E SG 90-day Rept, 90-Day Rept for Voltage- Based Alternate Repair Criteria - Unit 2 Eighth Refueling Outage, Dtd 980628.Forwards SE Concluding PG&E Implemented voltage-based Criteria in Accordance with Licensing Basis ML16342A7341999-03-18018 March 1999 Forwards FEMA Final Rept for 981104,emergency Preparedness Exercise.Rept Indicates No Deficiencies During Exercise, However 7 Areas Requiring Corrective Action Identified IR 05000275/19980201999-02-19019 February 1999 Forwards Insp Repts 50-275/98-20 & 50-323/98-20 on 981206- 990123 & Notice of Violation Re Failure to Obtain Transient Combustible Permits for Storing Compressed Gas Cylinders Containing Flammable Hydrogen Into safety-related Areas ML16342A6881999-02-16016 February 1999 Forwards Insp Repts 50-275/99-301 & 50-323/99-301 on 990125- 28.No Violations Noted.Insp Included Evaluation of Six Applicants for Senior Operator Licenses.All Applicants Satisfied Requirements of 10CFR55 ML16342C0931999-02-0909 February 1999 Informs That by Ltrs & 1223,NRC Responded to WOG Positions Re Corrective Actions to Address Generic Aspects of part-length Control Rod Drive Mechanism Housing Issue as Result of Leak at Prairie Island Unit 2 on 980123 ML16342A6981999-02-0303 February 1999 Refers to Investigation Conducted by OIG Re Activities at Dcnpp.Informs That Based on Evidence Developed During Investigation,Testimony & Document Reviews,Allegation Re Employee Discrimination Not Substantiated.Synopsis Encl ML16342C0911999-02-0202 February 1999 Informs of Plans to Administer Gfes of Written Operator Licensing Exam at PG&E Facility on 990407.Names of Candidates for Exam & Personnel Proctoring Exam Requested by 990305 ML16342A6701999-01-29029 January 1999 Forwards Request for Addl Info Re 970310 PG&E Rev 1 of W Technical Rept of WCAP-14797 (Proprietary) & WCAP-14798 (non-proprietary), Generic W* Tube Plugging Criteria for 51 Series Generator Tubesheet Region Wextex Expansions ML16342A6691999-01-29029 January 1999 Refers to 990115 Meeting Conducted at San Luis Obispo.Staff Presented Results of Safety Culture Survey.Survey Addressed Identification & Resolution of Problems & Mgt Influence.List of Attendees,Presentation Slides & Summary of Survey Encl ML16342A7151999-01-29029 January 1999 Discusses 990115 Meeting Conducted at Embassy Suites in San Luis Obispo Re Results of Util Safety Culture Survey. List of Attendees,Presentation Slides & Summary of Safety Culture Survey Provided by Licensee Encl IR 05000275/19980121999-01-13013 January 1999 Informs That Insp Repts 50-275/98-12 & 50-323/98-12 Have Been Canceled ML16342A6451999-01-12012 January 1999 Discusses Insp Repts 50-275/98-21 & 50-323/98-21 on 981204-18 & Forwards Nov.Violation Identified,Involving Two Examples of Failure to Meet NRC Requirements.Insp Focused on Operator Performance in Response to 981201 Manual RT IR 05000275/19980151999-01-0707 January 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Exercise Weaknesses Noted in Insp Repts 50-275/98-15 & 50-323/98-15 on 981120 ML16342A6391999-01-0606 January 1999 Forwards Insp Repts 50-275/98-17 & 50-323/98-17 on 981102-05 & 1207-11.No Violations Identified ML16342A6431999-01-0505 January 1999 Refers to NRC 981230 Response to D Lochbaum 981124 Petition That Request Mod of Operating Licenses for Diablo Canyon. Correct Date for Public Meeting Should Have Been 990115, Instead of 990111 ML16342C0811998-12-30030 December 1998 Forwards Safety Evaluation Re Inservice Testing Relief Request P-RR5, Auxiliary Saltwater Pump Performance Using Evaluation of Pump Curves ML16342C0831998-12-29029 December 1998 Advises of Planned Insp Effort Resulting from Dcnpp Insp Planning Review Held on 981202.Historical Listing of Plant Issues,General Description of PIM Table Labels & Insp Plan for Next Eight Months Encl ML16342A6251998-12-29029 December 1998 Forwards Request for Addl Info Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves ML16342A5901998-12-0101 December 1998 Forwards SE of Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves ML16342A5801998-11-20020 November 1998 Forwards Insp Repts 50-275/98-15 & 50-323/98-15 on 981103- 06.No Violations Noted.Insp Included Implementation of Emergency Plan & Procedures During Biennial Emergency Preparedness Exercise ML20195G5161998-11-16016 November 1998 Forwards Insp Repts 50-275/98-16 & 50-323/98-16 on 980913- 1024.No Violations Noted ML16342A5671998-11-0606 November 1998 Forwards Current Copy of Region 4 Organization Chart.Changes Made to Facilitate Closure of Region 4 Walnut Creek Field Ofc & Relocation of Project Branch E from Walnut Creek,Ca to Arlington,Tx.Closure Completed on 980930 ML20155F7951998-11-0303 November 1998 Second Partial Response to FOIA Request for Documents. Records Subj to Request Encl & Identified in App C 1999-09-30 |
Text
r b
JUN 271985 Mr'. ~ James D. Shiffer, Vice President Nuclear Power Generation
' Pacific Gas and Electric Company 77 Beale Street San Francisco, California 94106
Dear Mr. Shiffer:
SUBJECT:
EXAMINATION REPORT On May 21-30, 1985, the NRC administered examinations to employees of your company who had applied for licenses to operate your Diablo Canyon Units 1/2 Nuclear Power Plants. At the conclusion of the written examinations, the examination questions were discussed with those members of your staff identified in the enclosed report.
Preliminary results of the operating examinations were given at the exit meetings.
In accordance with 10 CFR 2.790(a), a copy of this letter and enclosures (1) and (2) will be placed in the NRC's Public Document Room. The examination scores and results for individual applicants are exempt from disclosure by 10 CFR 2.'790(a)(6) and, therefore, enclosure (3) will not be placed in the NRC's Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely, R.
. Pate, Chief Operations Section
Enclosures:
1.
Examination Report No. 50-275/0L-85-02 2.
Examinations and Answer Keys (SR0/RO) 3.
Power Plant Examination Results Summary cc w/ enclosures (1), (2) and (3):
T. Martin, Training Manager cc w/ enclosure (1) only:
J. Martin, RV M. Mendonca, SRI R. Pate, RV J. Elin, RV C. Shiraki, Chief Examiner P. Morrill, RV R. Muscat, RV (2 copies)
L. Defferding, PNL R. Schreiber, PNL H. Schierling, NRR cc w/ enclosures (1) and (2) only:
.RSB/ Document Control Desk (RIDS)
RV CShiraki:dh R ate 6/94 /85 6/
/85 8507010340 850627 PDR ADOCK 05000275 G
PDR b
g c