ML20127M587
| ML20127M587 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 06/27/1985 |
| From: | DETROIT EDISON CO. |
| To: | |
| Shared Package | |
| ML20127M577 | List: |
| References | |
| NUDOCS 8507010288 | |
| Download: ML20127M587 (3) | |
Text
,
Attcch unt 1 Proposed Change to the Fermi 2 Technical specifications i.
-Page attached:
3/4 3-48 l--
i r
I l
I-i i
f l
i
'8507010288 850627ADOCK 05000341 PDR PDR p
.n.
Attochtsnt 2 Justification for Proposed Change-to
' Fermi 2 Technical Specifications
-Table 3.3.7.1-1 The proposed-change corrects an earlier oversight.
There are two monitors' installed in the single makeup air intake.
This change is consistent with'the current action statement and eliminates the ambiguity that exists otherwise.
In addition the word " normal" clarifies that the monitor
~
referred to is on the normal makeup intake rather than the emergency makeup air intake.
l I
l l
TABLE 3.3.7.1-1
?'
RADIATION MONITORING INSTRUMENTATION E
MINIMUM CHANNELS APPLICABLE ALARM / TRIP EE INSTRUMENTATION ggg y,,,(
OPERABLE CONDlIIONS SEIP0lNT ACTION
[
1.
Control Center Makeup
' ' ' ' - 2L 1,2,3,5 and *
< 340 cpm 70 Air Radiation Monitor
{$5mR/hr) 2.
Area Monitors a.
Criticality Monitors
- 1) New Fuel 1
> 5 mR/hr and 71
_ 20 mR/hr(a)
Vault
- 2) Fuel Storage Pool 1
> 5 mR/hr 71 and < 20 mR/hr(,)
us
$ 0.5 mR/hr(a) hh 77 b.
Control Room Direct 1
At all times Radiation Monitor 4
I v
v v
.-