.,a
In Reply Refer To:
Docket:
50-285/85-11
Omaha Public Power District
ATTN:
R. L. Andrews, Division Manager-
Nuclear Production
1623 Harney Street
'0maha, Nebraska
68102
-
Gentlemen:
This refers to the inspection conducted by Messrs.-L. A. Yandell and
P. H. Harrell of this office during the period May 1-31, 1985, of activities
authorized by NRC Operating License DPR-40 for Fort Calhoun Station, and to the
discussion of our findings with you, and other members of your staff during and
at the conclusion of the inspection.
Areas examined ouring the inspection included licensee action on previous
inspection findings, operational safety verification, surveillance testing,
surveillance program, maintenance activities, followup of IE Information
Notices,.and followup of Licensee Event Reports (LERs). Within these areas,
the inspection consisted of selective examination of procedures and
representative records, interviews with personnel, and observations by the
inspectors. These findings are documented in the enclosed inspection report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements. Consequently, you are required to respond to
this violation, in writing, in accordance with the provisions of Section 2.201
of the NRC's." Rules of Practice," Part 2, Title 10, Code of Federal
Regulations. Your response should be based on the specifics contained in the
Notice of Violation enclosed with this letter.
The response directed by this letter and the accompanying Notices are not
subject ~to the clearance procedures of the Office of Management and Budget as
required by the Paperwork Reduction Act of 1980, PL 96-511.
RPB2/
RPB2/
RPB2
LAYan ell:cs
LEMartin
DRHurfter
6tJ /85
k
h
6//4/85
6/fy/85
.O
8507010154 850626
ADOCK 05000285
0
J
-
=:
-.
,
Omaha Public Power District
-2-
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
" Original Signed By:
D. R. HUNTER
D. R. Hunter, Chief
Reactor Project Branch 2
Enclosures:
1.
Appendix A - Notice of Violation
2. -
Appendix B - NRC Inspection Report
50-285/85-11
cc w/ enclosures:
W. G. Gates, Manager
Fort Calhoun Station
P.O. Box 399
Fort Calhoun, Nebraska 68023
Harry H. Voigt, Esq.
LeBoeuf, Lamb, Leiby & MacRae
1333 New Hampshire Avenue, NW
Washington, DC 20036
'
Kansas Radiation Control Program Director
Nebraska Radiation Control Program Director
bec to DMB (IE01)
bcc distrib. by RIV:
- RPB2
R. Denise, DRSP
- EP&RPB
R. D. Martin, RA
- RIV File
- MIS System
'
- Resident Inspector
- RSTS Operator
,
c
- $ection Chief (RPB2/A)
- D. Weiss, LFM8 (AR-2015)
T. Westerman
- w/766
i.
i
}
u_ .