APPENDIX A NOTICE OF VIOLATION Omaha Public Power District Docket:
50-285 Fort Calhoun Station License:
DPR-40 Based on the results of an NRC inspection conducted during the period of May 1-31, 1985, and in accordance with the NRC Enforcement Policy (10 CFR Part 2, Appendix C), 49 FR 8583, dated March 8, 1984, the following violation was identified:
1.
Failure to Follow Procedures Technical Specification 5.8.1 requires that " written procedures... be established, implemented, and maintained that meet or exceed the minimum requirements of Sections 5.1 and 5.3 of ANSI 18.7-1972, and Appendix A of USNRC Regulatory Guide 1.33...."
Standing Order G-23, " Surveillance Test Program," has been established in accordance with Technical Specification 5.8.1.
Section 6.5 of Standing Order G-23 requires that controls be established "to ensure that completed surveillance tests are accounted for in the files."
Contrary to the above, six surveillance tests performed during the refueling outage ending in July 1984, could not be accounted for in the files.
This is a Severity Level V Violation.
(Supplement I.E ) (285/8511-01)
Pursuant to the provisions of 10 CFR 2.201, Omaha Public Power District is-hereby required to submit to this office, within 30 days of the date of this Notice, a written statement or explanation in reply, including:
(1) the corrective steps which have been taken and the results achieved; (2) corrective steps which will be taken to avoid further violations; and (3) the date when full compliance will be achieved.
Consideration may be given to extending your response time for good cause shown.
Dated:
M 00 E 8507010158 850626 ADOCK050g25 DR f