MONTHYEARML20210H2901999-07-30030 July 1999 Proposed Tech Specs Pages,Extending Operation of RBS from Current Licensed Power Level of 2894 Mwt to Uprated Power Level 3039 Mwt ML20205P8701999-04-15015 April 1999 Proposed Tech Specs,Implementing Bwrog/Ge Enhanced Option I-A (EI-A) Reactor Stability long-term Solution ML20205L7321999-04-0808 April 1999 Proposed Tech Specs,Removing Notes That Refer to Specific Cycles,Per LAR 1998-15 Re Change to TS 2.1.1.2, Reactor Core Safety Limits ML20206R9351999-01-12012 January 1999 Proposed Tech Specs Re Refueling Equipment Interlocks Required Actions ML20198E8091998-12-16016 December 1998 Proposed Tech Specs Pages Re Change to TS Safety Limit 2.1.1.2,changing Two Recirculation Loop MCPR Limit from 1.13 to 1.12 & Single Recirculation Loop MCPR Limit from 1.14 to 1.13 ML20196A1401998-11-20020 November 1998 Proposed Tech Specs Adding 3.10.9, Control Rod Pattern - Cycle 8, to Support Startup from Outage Planned for Early Dec 1998 ML20154H3691998-10-0808 October 1998 Proposed Tech Specs Implementing BWROG Enhanced Option I-A Reactor Stability Long Term Solution as Documented in NEDO-32339,Rev 1, Reactor Stability Long-Term Solution, Enhanced Option I-A ML20153H0311998-09-23023 September 1998 Proposed Tech Specs Changing Specific Gravity Acceptance Criteria for Div III Battery ML20153E8111998-09-22022 September 1998 Proposed Tech Specs Deleting License Conditions Associated with Transamerica Delaval,Inc EDGs ML20217J0951998-04-21021 April 1998 Proposed Tech Specs Bases Update Package for Revs Implemented Since Last Submittal Through Refuel Outage 7 ML20216F1941998-04-0909 April 1998 Proposed Tech Specs License Condition 2.C(13) Re Partial Feedwater Heating & Final Feedwater Temp Reduction ML20216E4861997-09-0505 September 1997 Proposed Tech Specs Re APRM Setpoints,Reactivity Anomalies & RPS Instrumentation ML20210K2131997-08-15015 August 1997 Proposed Administrative Changes to TS 2.1.1.2 W/Note to Indicate Operating Cycle for Which SLMCPR Value Has Been Approved & TS 5.6.5 W/Note Providing Link to Specific GE Documents Used in Approving SLMCPR Changes for Given Cycle ML20217J0481997-08-0505 August 1997 Proposed Tech Specs 2.1.1.2, Reactor Core (Safety Limits), Increasing Two Recirculation Loop MCPR Limit to 1.13 & Single Recirculation Loop MCPR Limit to 1.14 ML20151L6041997-07-31031 July 1997 Proposed Tech Specs,Requesting Approval of Change to TS 3.6.1.8, Penetration Valve Leakage Control Sys, for Upcoming Outage ML20196J7741997-07-30030 July 1997 Proposed Tech Specs Clarifying Surveillance Requirements 3.6.4.2.1 & 3.6.4.2.2 to Match Corresponding Changes to NUREG-1434 ML20134A7021997-01-20020 January 1997 Proposed Tech Specs to License NPF-47,enhancing Operation of Plant to Allow Operation at 100% Power W/Lower Core Flows & Use of Flow Control Spectral Shift Strategies to Increase Cycle Energy ML20133M0451997-01-10010 January 1997 Proposed Tech Specs 3.4.11 Re RCS Pressure & Temp Limits ML20134M2271996-11-15015 November 1996 Proposed Tech Specs,Changing TS SL 2.1.1.2, Reactor Core (Sl), Which Increases Two Recirculation Loop MCPR Limit from 1.07 to 1.10 & Single Recirculation Loop MCPR from 1.08 to 1.12 ML20134M0151996-11-15015 November 1996 Proposed Tech Specs 3.8.1 Re AC Sources Operating ML20134M2061996-11-0606 November 1996 Proposed Tech Specs,Permitting Increase in Allowable Leak Rate for MSIVs & Deleting Penetration Valve Leakage Control Sys & Ms Positive Leakage Control Sys Requirements ML20129J4231996-10-24024 October 1996 Proposed Tech Specs 3.8.1 Re A.C. Sources - Operating ML20117K1071996-08-29029 August 1996 Proposed Tech Specs Re Reactor Vessel Matl Surveillance Program Capsule Withdrawal Schedule ML20117G7401996-08-29029 August 1996 Proposed Tech Specs 3.1 Re Reactivity Control Systems ML20116J3151996-08-0707 August 1996 Proposed Tech Specs,Submitting TS Bases Pages for Revs Performed Since 951001 Approval of TS Bases ML20116L6321996-08-0101 August 1996 Proposed Tech Specs Re Primary Containment/Drywell Hydrogen Mixing Sys & Drywell Isolation Valves ML20117L2581996-06-0404 June 1996 Proposed Tech Specs Re Replacement Page for Ltr RBG-42764, Proposed Tech Specs 3.9.1 Re Refueling Equipment Interlocks1996-05-31031 May 1996 Proposed Tech Specs 3.9.1 Re Refueling Equipment Interlocks ML20112E7831996-05-30030 May 1996 Proposed Tech Spec 3.8.3 Re Incorporation of 5-start Air Pressure Design Criterion for Div III DG ML20117H3271996-05-20020 May 1996 Proposed Tech Specs Re Change in Co Name from Gulf States Utils Co to Entergy Gulf States,Inc ML20107E4681996-04-18018 April 1996 Proposed Tech Specs Re Fuel Loading W/Control Rods Withdrawn or Removed from Defueled Core Cells ML20094N7741995-11-22022 November 1995 Proposed Tech Specs,Clarifying Info Contained in License Amend Request (LAR) 95-21 ML20094M8001995-11-20020 November 1995 Proposed Tech Specs Re Drywell Leak Rate Testing Requirements ML20094N0091995-11-20020 November 1995 Proposed Tech Specs Eliminating Selected Response Time Testing Requirements ML20094B0001995-10-26026 October 1995 Proposed Tech Specs,Consisting of Change Request 95-10, Deleting TS 5.5.12, Biofouling Prevention & Detection, & Various Editorial Corrections ML20093L7361995-10-24024 October 1995 Proposed Tech Specs 3.6.1.1 Through 3.6.1.3 Re Containment Sys ML20087J5451995-08-17017 August 1995 Proposed Tech Specs Re Engineered Safety Sys Which Responds to Fuel Handling Accident Conditions ML20084L4541995-05-30030 May 1995 Proposed Tech Specs Re Request for Exemption from App J, Primary Reactor Containment Leakage Testing for Water- Cooled Power Reactors ML20084L5001995-05-30030 May 1995 Proposed Tech Specs,Allowing TS 3/4.6.2.2, Drywell Bypass Leakage, Tests to Be Performed at Intervals as Long as Five Yrs Based on Demonstrated Performance of Drywell Structure ML20078M1171995-02-0808 February 1995 Proposed Tech Specs Page Re Secondary Containment Automatic Isolation Dampers ML20077S4401995-01-18018 January 1995 Revised Pages of Proposed Tech Specs Re Conversion to TS Based on NUREG-1434, Improved TS Rev 0 ML20078H0881994-11-10010 November 1994 Proposed Tech Specs Reflecting Clarifications to LAR 91-11 ML20024J3341994-10-0404 October 1994 Proposed Tech Spec Removing one-hour Requirement for Completing Noble Gas & Tritium Sampling & Analysis ML20073B2381994-09-12012 September 1994 Proposed TS 3/4.2.2, APRM Setpoints ML20072U7901994-09-0808 September 1994 Proposed Tech Spec 3.10.2, Special Test Exceptions - Rod Pattern Control Sys ML20064L6481994-03-15015 March 1994 Proposed Tech Specs,Reflecting Removal of Turbine Overspeed Protection Sys Requirements ML20064C0961994-03-0303 March 1994 Proposed Tech Specs,Reflecting Relocation of Response Time Limits to Usar,Per GL 93-08 ML20063K3721994-02-22022 February 1994 Proposed Tech Specs 3.6.1.8 & 3.6.1.9 Re Penetration Valve Leakage Control Sys Air Compressor ML20063A6301994-01-14014 January 1994 Proposed Tech Specs Reflecting Removal of Component Lists ML20059G8181994-01-14014 January 1994 Proposed Tech Specs Re Surveillance Test Interval & Allowed Outage Time Extension Request 1999-07-30
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20210H2901999-07-30030 July 1999 Proposed Tech Specs Pages,Extending Operation of RBS from Current Licensed Power Level of 2894 Mwt to Uprated Power Level 3039 Mwt ML20205P8701999-04-15015 April 1999 Proposed Tech Specs,Implementing Bwrog/Ge Enhanced Option I-A (EI-A) Reactor Stability long-term Solution ML20205L7321999-04-0808 April 1999 Proposed Tech Specs,Removing Notes That Refer to Specific Cycles,Per LAR 1998-15 Re Change to TS 2.1.1.2, Reactor Core Safety Limits ML20206R9351999-01-12012 January 1999 Proposed Tech Specs Re Refueling Equipment Interlocks Required Actions ML20199C1881999-01-0808 January 1999 Revised Page 7 to Rev 13 of RBS Security Training & Qualification Plan ML20198E8091998-12-16016 December 1998 Proposed Tech Specs Pages Re Change to TS Safety Limit 2.1.1.2,changing Two Recirculation Loop MCPR Limit from 1.13 to 1.12 & Single Recirculation Loop MCPR Limit from 1.14 to 1.13 ML20196A1401998-11-20020 November 1998 Proposed Tech Specs Adding 3.10.9, Control Rod Pattern - Cycle 8, to Support Startup from Outage Planned for Early Dec 1998 ML20154H3691998-10-0808 October 1998 Proposed Tech Specs Implementing BWROG Enhanced Option I-A Reactor Stability Long Term Solution as Documented in NEDO-32339,Rev 1, Reactor Stability Long-Term Solution, Enhanced Option I-A ML20153H0311998-09-23023 September 1998 Proposed Tech Specs Changing Specific Gravity Acceptance Criteria for Div III Battery ML20153E8111998-09-22022 September 1998 Proposed Tech Specs Deleting License Conditions Associated with Transamerica Delaval,Inc EDGs ML20217J0951998-04-21021 April 1998 Proposed Tech Specs Bases Update Package for Revs Implemented Since Last Submittal Through Refuel Outage 7 ML20216F1941998-04-0909 April 1998 Proposed Tech Specs License Condition 2.C(13) Re Partial Feedwater Heating & Final Feedwater Temp Reduction RBG-44355, Cycle 8 Startup Physics Test Summary1998-01-19019 January 1998 Cycle 8 Startup Physics Test Summary ML20202F0361997-11-26026 November 1997 Rev 0 to IST Plan for Pumps & Valves Second Ten-Yr Interval ML20216E4861997-09-0505 September 1997 Proposed Tech Specs Re APRM Setpoints,Reactivity Anomalies & RPS Instrumentation ML20210K2131997-08-15015 August 1997 Proposed Administrative Changes to TS 2.1.1.2 W/Note to Indicate Operating Cycle for Which SLMCPR Value Has Been Approved & TS 5.6.5 W/Note Providing Link to Specific GE Documents Used in Approving SLMCPR Changes for Given Cycle ML20217J0481997-08-0505 August 1997 Proposed Tech Specs 2.1.1.2, Reactor Core (Safety Limits), Increasing Two Recirculation Loop MCPR Limit to 1.13 & Single Recirculation Loop MCPR Limit to 1.14 ML20151L6041997-07-31031 July 1997 Proposed Tech Specs,Requesting Approval of Change to TS 3.6.1.8, Penetration Valve Leakage Control Sys, for Upcoming Outage ML20196J7741997-07-30030 July 1997 Proposed Tech Specs Clarifying Surveillance Requirements 3.6.4.2.1 & 3.6.4.2.2 to Match Corresponding Changes to NUREG-1434 ML20134A7021997-01-20020 January 1997 Proposed Tech Specs to License NPF-47,enhancing Operation of Plant to Allow Operation at 100% Power W/Lower Core Flows & Use of Flow Control Spectral Shift Strategies to Increase Cycle Energy ML20133M0451997-01-10010 January 1997 Proposed Tech Specs 3.4.11 Re RCS Pressure & Temp Limits ML20140F0151996-12-26026 December 1996 Rev 6 to RSP-0008, ODCM Procedure ML20134M2271996-11-15015 November 1996 Proposed Tech Specs,Changing TS SL 2.1.1.2, Reactor Core (Sl), Which Increases Two Recirculation Loop MCPR Limit from 1.07 to 1.10 & Single Recirculation Loop MCPR from 1.08 to 1.12 ML20134M0151996-11-15015 November 1996 Proposed Tech Specs 3.8.1 Re AC Sources Operating ML20134M2061996-11-0606 November 1996 Proposed Tech Specs,Permitting Increase in Allowable Leak Rate for MSIVs & Deleting Penetration Valve Leakage Control Sys & Ms Positive Leakage Control Sys Requirements ML20129J4231996-10-24024 October 1996 Proposed Tech Specs 3.8.1 Re A.C. Sources - Operating ML20117K1071996-08-29029 August 1996 Proposed Tech Specs Re Reactor Vessel Matl Surveillance Program Capsule Withdrawal Schedule ML20117G7401996-08-29029 August 1996 Proposed Tech Specs 3.1 Re Reactivity Control Systems ML20116P1341996-08-0808 August 1996 Technical Requirements Manual ML20116J3151996-08-0707 August 1996 Proposed Tech Specs,Submitting TS Bases Pages for Revs Performed Since 951001 Approval of TS Bases ML20116L6321996-08-0101 August 1996 Proposed Tech Specs Re Primary Containment/Drywell Hydrogen Mixing Sys & Drywell Isolation Valves ML20113F2271996-06-12012 June 1996 Rev 0 to Calculation PI-0103-00203.002-101, Ampacity Derating Evaluation ML20117L2581996-06-0404 June 1996 Proposed Tech Specs Re Replacement Page for Ltr RBG-42764, Proposed Tech Specs 3.9.1 Re Refueling Equipment Interlocks1996-05-31031 May 1996 Proposed Tech Specs 3.9.1 Re Refueling Equipment Interlocks ML20112E7831996-05-30030 May 1996 Proposed Tech Spec 3.8.3 Re Incorporation of 5-start Air Pressure Design Criterion for Div III DG ML20117H3271996-05-20020 May 1996 Proposed Tech Specs Re Change in Co Name from Gulf States Utils Co to Entergy Gulf States,Inc B130180, Surveillance Specimen Program Evaluation for River Bend Station1996-04-30030 April 1996 Surveillance Specimen Program Evaluation for River Bend Station ML20107E4681996-04-18018 April 1996 Proposed Tech Specs Re Fuel Loading W/Control Rods Withdrawn or Removed from Defueled Core Cells ML20094N7741995-11-22022 November 1995 Proposed Tech Specs,Clarifying Info Contained in License Amend Request (LAR) 95-21 ML20094M8001995-11-20020 November 1995 Proposed Tech Specs Re Drywell Leak Rate Testing Requirements ML20094N0091995-11-20020 November 1995 Proposed Tech Specs Eliminating Selected Response Time Testing Requirements ML20094B0001995-10-26026 October 1995 Proposed Tech Specs,Consisting of Change Request 95-10, Deleting TS 5.5.12, Biofouling Prevention & Detection, & Various Editorial Corrections ML20093L7361995-10-24024 October 1995 Proposed Tech Specs 3.6.1.1 Through 3.6.1.3 Re Containment Sys ML20108B5941995-10-0101 October 1995 Rev 5A to River Bend Station Offsite Dose Calculation Manual Procedure ML20087J5451995-08-17017 August 1995 Proposed Tech Specs Re Engineered Safety Sys Which Responds to Fuel Handling Accident Conditions ML20084L5001995-05-30030 May 1995 Proposed Tech Specs,Allowing TS 3/4.6.2.2, Drywell Bypass Leakage, Tests to Be Performed at Intervals as Long as Five Yrs Based on Demonstrated Performance of Drywell Structure ML20084L4541995-05-30030 May 1995 Proposed Tech Specs Re Request for Exemption from App J, Primary Reactor Containment Leakage Testing for Water- Cooled Power Reactors ML20078M1171995-02-0808 February 1995 Proposed Tech Specs Page Re Secondary Containment Automatic Isolation Dampers ML20077S4401995-01-18018 January 1995 Revised Pages of Proposed Tech Specs Re Conversion to TS Based on NUREG-1434, Improved TS Rev 0 ML20078H0881994-11-10010 November 1994 Proposed Tech Specs Reflecting Clarifications to LAR 91-11 1999-07-30
[Table view] |
Text
.
RECElVED 3/4.8 ELECTRICAL POWER SYSTEMS OCT 0 91992 BASES __ _
cuc 3/4.8.1. 3/4.B.2 and 3/4.8.3 A.C. SOURCES. D.C. SOURCES and ONSITE POWEB DISTRIBUTION 5,1 STEMS The OPERABILITY of the A.C. and 0.C. power sources and associated distribution systems during operation ensures that sufficient power will be available to supply the safety related equipment required for the safe shutdown of the facility and the mitigation and control of accident conditions within the facility. The minimum specified independent and redundant A.C. and 0.C. power sources and distribution systems satisfy the requirements of General Design Criterion 17 of Appendix "A" to 10 CFR Part 50.
The ACTION requirements specified for the levels of degradation of the power sources provide restriction upon continued facility operation commensurate with the level of degradation. The OPERABILITY of the power sources is consistent with the initial condition assumptions of the safety analyses and is based upon maintaining OPERABLE at least Divisica I or 11 of the onsite A.C. and 0.C. power sources and associated distribution systems during accident conditions coincident with an assumed loss of offsite power and single failure of the other onsite A.C. or D.C. source. Division III supplies the high pressure core spray (HPCS) system and standby service water pump ISWP*P2C with its auxillaries.
The A C. .and D.C. source allowable out-of-service times are based on Regulatory Guide 1.93, " Availability of Electrical Power Sources," December 1974, as modified by plant-specific analysis and diesel generator manufacturer's recommendations. When diesel generator IA or IB is inoperable, there is an aoditional ACTION requirement to verify that all required systems, subsystems, trains, components and devices, that depend on the remaining OPERABLE diesel generator IA or IB as a source of emergency power, are also OPERABLE. This requirement is intended to provide assurance that a loss of offsite power, during the period that diesel generator IA or 18 is inoperable, will not result in a complete loss of safety function of critical syr.tems.
Critical systems are those systems that require emergency power to safely shut down the plant and maintain it in a safe shutdown condition in conjunction with a loss of offsite power. Equipment which " fails safe" upon a loss of power are not included. The following systems / subsystems are required to be verified OPERABLE per this ACTION requirement:
MA b 1. one channel of the accident monitoring drywell and containment hydrogen concentration analyzer and monitor
=2. two-4 e a k-de tect4 en-s ub sy s t ems-pe r-Tec hn i c al-Spec i fic a t i on-374M y% .R 3'. two low pressure ECCS subsystems b0 one main steam positive leakage control subsystem 3.N. one penetration valve leakage control subsystem gg y ,5".
og g f. one safety-related primary containment unit cooler b y J. one suppression pool cooling subsystem of RHR
$ 7 E. one standby gas treatment system og g J. one shield building annulus mixing subsystem ha 9 J 0'. one fuol building ventilation charcoal filtration subsystem g M. one primary containm4 nt hydrogen recombiner RIVER BEND - UNIT 1 B 3/4 8-1 Amendment No. 64
e-4 ELECTRICAL POWER h dQg BASES A.C. SOURCES. 0.C. SOURCES and ONSITE POWER DISTRIBUTION SYSTEMS (Continued)
// 42. one primary containment /drywell hydrogen mixing subsystem f g 13. one primary containment /drywell hydrogen ignitor s.asystem
/ 5 y. one standby service water subsystem with both pumps operable f y JS. the standby cooling tower with two fan cells operable
/S 18' ne main c ntrol room air conditioning subsystem The above systems / subsystems are required to be capable of being powered by the OPERABLE diesel generator IA or 18. Systems whose ACTION requirements are
, 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> er longor for a complete less of itr nfety fonction are not included on the above list. Continued plant operation is limited to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> with '
diesel generator lA or IB inoperalle. The term verify, as used in this context, means to administratively check, by examining logs or other-information, to determine if certain components are out of service for maintenance or other reasons. It does not mean to perform the surveillance-requirements needed to demonstrate the OPERABILITY of the component. When a diesel generator becomes inoperable due to any cause other than preplanned maintenance or testing, there is a requirement in the ACTION to, for each OPERABLE diesel generator separately, either verify that the cause of the diesel generator being inoperable does not impact the OPERABILITY of the OPERABLE diesel generator or perform Surveillance Requirement 4.8.1.1.2.a.4.
The term verify in this context means to determine by visual inspection, functional test or other means that the subsystem will perform its function.
For diesel generators made by different manufacturers, this verification may consist of a determination that the cause cannot exist if the comparable subsystem is of a different design.
The OPERABILITY of the minimum specified A.C. and D.C. power sources and associated distribution systems, during shutdown and refueling, ensures that the facility can be maintained in the shutdown or refueling condition for extended time periods and sufficient instrumentation and control capability is available for monitoring and maintaining the unit rtatus.
The surveillance requirements, for demonstrating the OPERABILITY of the diesel generators, are in accordance with the recossendations of Regulatory
- Guide 1.9, " Selection of Diesel Generator Set Capacity for Standby Power.
Supplies," March 10, 1971, and Regulatory Guide 1.108, " Periodic Testing of Diesel Generator Units used as Onsite Electric Power Systees at Nuclear Power Plants," Revision 1, August 1977, as modified by plant-specific analysis and diesel generator manufacturer's recommendations.
Generic Letter 84-15 prescribed increasing the surveillance test frequency where previous testing indicated a reliability of less than or equal to 0.95/ demand until restored reliability was demonstrated. It also considered a prescriptive testing program which included seven consecutive successful demands without a failure of the DG. RECEIVED OCT 0 91992 SDC RIVER BEND y UNIT 1 B 3/4 8-2 Amendetnt No. M . -: