Advises That NSP Will Submit Rept Describing Cause of Cracks & Repairs Made
ML20127K397
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 02/26/1968
From: Muller D
US ATOMIC ENERGY COMMISSION (AEC)
To: Boyd R
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML20127K400 List:
References
NUDOCS 9211200393
Download: ML20127K397 (1)


Text

_

Roger S. Boyd, Assistant Director for Reactor Projects, DRL February 26, 1968 9s Ons D. R. Muller, Chief

, us Reactor Projects Branch #1, DEL MONTICELLO NUCLIAR ChiERATING FLANT - NORTHERN STATES POWER COMPANY, DOCKET NO. 50-263 Mr. Dave McElroy of Northern States Power Coupesy called on February 13, 1968, and informed me that they had just completed the' ever pressure and leak rate testa on the Montiaalla - emi - e vessel.- The creeks thish e

were found in the heat-effected'aeme of the penetraties welds have been repaired. The repairedJareaa have been magnifluned land no signs of _

additional cracking have been feend. -The interior of:the vessel has been magnifluxed and six==all cracka have been repaired.

The relatively cool ambient temperature during " alding caused hydrogma '

buildup and consequent shallow (1/32" to 3/32" deep) aracks. The weld 4*

areas should have been pre-and post-welded heat treated at 200'F. Tha '

' M Ip' heat treatment was done at 100*F.

Chicago Bridge and Iron duplicated the trouble, including the cracks, in their lab.

I requested that Northern States Power submit twenty copies of a report I-describing the cause of the cracks and the repairs made. Mr. McElroy agreed to supply the report in about one month.

Distribution:

L Supp14 N

i DRL Reading RPB-1 Reading D. R. Muller

3. Shea s

N. M. Blunt (2) w v;,1 s -

_c

},

..glf.

s gf

.. n,,

.o

= *

,l3 omet >

DRL,j_RPB-1 DRMuller:brm

^

SURNAME >

.... ~

2 26/.68 Pbrm AEC.818 (Rev. 9-83)

"3 part >

U.s sovtRWIM7 PRINTING 0FFX2 IM214-629 9211200393 680226

. wei PDR ADOCK 05000263 A

PDR

.