ML20127H438
| ML20127H438 | |
| Person / Time | |
|---|---|
| Site: | Cooper |
| Issue date: | 05/16/1985 |
| From: | Johnson E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Pilant J NEBRASKA PUBLIC POWER DISTRICT |
| Shared Package | |
| ML20127H441 | List: |
| References | |
| NUDOCS 8505210301 | |
| Download: ML20127H438 (2) | |
See also: IR 05000298/1985012
Text
r3
DM6
..'
h',
c
L
MAY 161985
In-Reply Refer To:
Docket: 50-298/85-12
Nebraska Public Power District
ATTN:
J. M. Pflant, Manager, Technical
Staff-Nuclear Power Group
P. O. Box 499
Columbus, Nebraska 68601
Gentlemen:
-This refers to the inspection conducted by Messrs. Kerch, Harris and Campbell
j
of the Region I office during the period March 11-22, 1985, of activities
authorized by NRC Operating License DPR-46 for Cooper Nuclear Station, and to
the discussion of our findings with your Mr. Thomason and other members of your
staff at the conclusion of the inspection.
-The area examined during the inspection was nondestructive examination of
replacement pipe on the reactor recirculation system. Within this area,
the inspection consisted of selective examination of procedures and
representative records, interviews with personnel, and observations by the
inspector. These findings are documented in the enclosed inspection report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements. Consequently, you are required to respond to
this violation, in writing, in accordance with the provisions of Section 2.201
of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.
Yoar response should be based on the specifics contained in the Notice of
Violation enclosed with this letter.
The response directed by this letter and the accompanying Notice is not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, PL 96-511.
RPB1/A N
RPB1/A
RPB1
CCHarbu Ulk
JPJaydon
EHJohnson
5 / 5/85
f/p/85
5 / 6 /85
ggaioi!ck IEdh'
O \\
e
\\ ip
-
=
=.
.
.,
. ..
I
Nebraska Public Power District
2-
-
~
-Should'you have any questions concerning this inspection, we will be pleased
.to discuss them with you.
Sincerely,
OriTml Signed By
E. H. Johnux1
E. H. Johnson, Chief
Reactor Project Branch 1
..
Enclosures:
.
-
1.
Appendix A - Notice of Violation
2. ' Appendix B - NRC-Inspection Report
50-298/85-12
cc w/ enclosures:
Paul V. Thomason, Division Manager
of Nuclear Operations
. Cooper Nuclear Station
P. 0.= Box 98
LBrownville,-Nebraska 68321
-Kansas Radiation Control Program Director
. Nebraska Radiation Control Program Director
bec to DMB (IE01)
bec distrib. by RIV:
- RPB1
R. P. Denise, DRSP
- Resident Inspector
R. D. Martin, RA
"*SectionChief(RPB1/A).
'*D. Weiss, LFMB (AR-2015
- EP&RPB
H. W. Kerch, RI
- MIS System
R. H. Harris, RI
- RIV File-
R. M. Campbell, RI
- RSTS Operator
- w/766
o
4
I
.
n
,
..e--.
--
-.
. . . - . . ~
,
- , -
,
-.
A