ML20127H438

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-298/85-12 on 850311-22 & Notice of Violation
ML20127H438
Person / Time
Site: Cooper Entergy icon.png
Issue date: 05/16/1985
From: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Pilant J
NEBRASKA PUBLIC POWER DISTRICT
Shared Package
ML20127H441 List:
References
NUDOCS 8505210301
Download: ML20127H438 (2)


See also: IR 05000298/1985012

Text

r3

DM6

..'

h',

c

L

MAY 161985

In-Reply Refer To:

Docket: 50-298/85-12

Nebraska Public Power District

ATTN: J. M. Pflant, Manager, Technical

Staff-Nuclear Power Group

P. O. Box 499

Columbus, Nebraska 68601

Gentlemen:

-This refers to the inspection conducted by Messrs. Kerch, Harris and Campbell

j of the Region I office during the period March 11-22, 1985, of activities

authorized by NRC Operating License DPR-46 for Cooper Nuclear Station, and to

the discussion of our findings with your Mr. Thomason and other members of your

staff at the conclusion of the inspection.

-The area examined during the inspection was nondestructive examination of

replacement pipe on the reactor recirculation system. Within this area,

the inspection consisted of selective examination of procedures and

representative records, interviews with personnel, and observations by the

inspector. These findings are documented in the enclosed inspection report.

During this inspection, it was found that certain of your activities were in

violation of NRC requirements. Consequently, you are required to respond to

this violation, in writing, in accordance with the provisions of Section 2.201

of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.

Yoar response should be based on the specifics contained in the Notice of

Violation enclosed with this letter.

The response directed by this letter and the accompanying Notice is not subject

to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1980, PL 96-511.

RPB1/A N RPB1/A RPB1

CCHarbu Ulk JPJaydon EHJohnson

5 / 5/85 f/p/85 5 / 6 /85

ggaioi!ck IEdh' e

O\

\ ip

-

= =. .

.,

. ..

I

Nebraska Public Power District -

2-

~

-Should'you have any questions concerning this inspection, we will be pleased

.to discuss them with you.

Sincerely,

OriTml Signed By

E. H. Johnux1

E. H. Johnson, Chief

.. Reactor Project Branch 1

Enclosures: .

-

1. Appendix A - Notice of Violation

2. ' Appendix B - NRC-Inspection Report

50-298/85-12

cc w/ enclosures:

Paul V. Thomason, Division Manager

of Nuclear Operations

. Cooper Nuclear Station

P. 0.= Box 98

LBrownville,-Nebraska 68321

-Kansas Radiation Control Program Director

. Nebraska Radiation Control Program Director

bec to DMB (IE01)

bec distrib. by RIV:

  • RPB1 R. P. Denise, DRSP
  • Resident Inspector R. D. Martin, RA

"*SectionChief(RPB1/A). '*D. Weiss, LFMB (AR-2015

  • EP&RPB H. W. Kerch, RI
  • MIS System R. H. Harris, RI
  • RIV File- R. M. Campbell, RI
  • RSTS Operator

o *w/766

4

I

. n , ..e--. -- -.

. . . - . . ~ , - , - , -. A