Docket No. 50-254
Docket No. 50-265
Commonwealth Edison Company
ATTN:
Mr. Cordell Reed
Vice President
Post Office Box 767
Chicago, IL 60690
'
Gentlemen:
This refers to the routine safety inspection conducted by Messrs. A. L. Madison
and A. D. Morrongfello of this office on April 1 through May 31, 1985, of
activities at Quad Cities Nuclear Power Station, Units 1 and 2, authorized by
NRC Operatirig Licenses No. DPR-29 and No. DPR-30, and to the discussion of our
findings with Mr. N. J. Kalivianakis at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No items of noncompliance with NRC requirements were identified during the
course of this inspection.
I
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC's
Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
" Original signed by G. C. Wright"
W. D. Shafer, Chief
Reactor Projects Branch 2
Enclosure:
Inspection Reports
'
No. 50-254/85012(DRP);
No. 50-265/85013(DRP)
cc w/ enclosure:
D. L. Farrar, Diroctor
of Nuclear Licensing
N. Kalivianakis, Plant Manager
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
Phyllis Dunton, Attorney
General's Office, Environmental
8506260303 850612
ADOCK 05000254
Control Division
,
Chri sotimos/kja
/Shafer'
06/11/85
g
Iso t
't