ML20127G706

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-302/85-01 on 850114-18.Certain Activities Appear to Be in Violation & Are Under Consideration for Escalated Enforcement Action
ML20127G706
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 04/25/1985
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Wilgus W
FLORIDA POWER CORP.
Shared Package
ML20127G708 List:
References
RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8505210121
Download: ML20127G706 (3)


See also: IR 05000302/1985001

Text

. , y ,

' April 25,1985

Florida Power Corporation

ATTN: Mr. W. S. Wilgus

Vice President Nuclear Operations

P. O. Box 14042, M.A.C. H-2

'St. Petersburg, FL 33733

Gentlemen:

. SUBJECT: REPORT NO. 50-302/85-01

-On January 14-18, 1985, the NRC inspected activities authorized by NRC Operating

License No. DPR-72 fcr your Crystal River facility. This inspection involved an

assessment of various training programs for supporting licensed activities. At

'the conclusion of the inspection,'the findings were discussed with those members

of your staff identified in the enclosed inspection report.

Areas examined-during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records,-interviews with personnel, and observation of activities

in progress.

The inspection findings indicate that certain activities violated NRC require-

-ments. The violations described in the enclosed inspection report are under

consideration for escalated enforcement action. Accordingly, a Notice of

-Violation is not being issued at this time. No response to this letter is

required. However, please be advised that the number and characteristics of

violations described in the enclosed report may change as a result of further NRC

review. You will be advised by separate correspondence of the results of our

.

deliberations-on this matter.

.Your attention is invited to unresolved items identified in the inspection

report. These matters will be pursued during future inspections.

,

- Should you have any questions concerning this letter, please contact us.

l

,

Sincerely,

L

(Original signed by JNGrace)

J. Nelson Grace

Regional Administrator

. Enclosure:

Inspection Report 50-302/85-01

cc w/ enc 1: (See page 2)

-

'

m

8505210121 850425

PDR ADOCK 05000302

G PDR

!

D[}

t .

F

-. ,- i

. Florida PowerLCorporation 2 April 25, _1985

cc w/ enc 1:

E. M. Howard,_ Director:

Site Nuclear Operations-

P. F. McKee, Nuclear Plant Manager

G. R. Westafer, Manager

Nuclear Operations Licensing

and Fuel-Management

bec w/ enc 1:

-NRC Resident-Inspector

' Document-Control Desk.

State of Florida

.

l

.

.

RI RII RII RII RII

W ,p

-

Stadler:1b CAJulian AFGibson PRBemis VBrownlee

4/3f/85 4/ /85 4/ /85 4/ /85 4/ /85

RII RII RII

'RDWalker GJenkins JA01shinski

-4/ /85 4/ /85 4/ /85

.. . . . _ . . .

-

_,

f~-

. ,. s

Florida Power Corporation 2 April 25,1985

Should you have any questions concerning this letter, please contact us.

Sincerely,

J. Nelson Grace

Regional Administrator

Enclosure:

Inspection Report 50-302/85-01

cc w/ encl:

E. M. Howard, Director

Site Nuclear Operations

P. F. McKee, Nuclear Plant Manager

G.'R. Westafer, Manager

Nuclear Operations Licensing

and Fuel Management

bec w/ encl:

NRC Resident Inspector

Document Control Desk

State of Florida

SEE PREVIOUS CONCURRENCE PAGE

-

I

,

RI RII RII RH RII

S

p

lb

LVian

CAJu son RB s

0

yBrownlee

4/ '/85 3/ /8 3/ 85 / /85 O/g/85

49 YY y,fqgs \b y

S. /---/8

e

'

-

3//g/85

.k k.us 30

04/

uhsf

/85

df