Text
.
I O
e UNITED STATES NUCLEAR REGULATORY COMMISSION DIRECTORATE OF REGULATORY OPERATIONS REGION lli 799 ROOSEVELT RO AD GLEN ELLYN. ILLINOl5 60137 January 30, 1975 Northern States Power Company Docket No. 50-263 ATTN Mr. Leo Wachter, Vice President Power Production and System Operation 414 Nicollet Mall Minneapolis, Minnesota 55401 Gentlemen:
Enclosed is IE Bulletin No. 75-01 which requires action by you with regard to your boiling water reactor facility with operating license.
Should you have questions regarding this Bulletin or the actions required of you, please contact this office.
Sincerely yours, James G. Keppler Regional Director
Enclosure:
IE Bulletin No. 75-01 Approved by GAO, B-180225 (R0072), clearance expires 7-31-77. Approval was given under a blanket clearance specifically for identified generic problems.
bec: DR Central Files RO Files PDR Local PDR OGC, Beth, P-506A (f
'O*o, Anthony Roisman, Esq.
+
q Y
FI c
b,,,.,e a.
7
\\
9211160589 750130 (1)
PrR ADOCK 05000263 O
PDR i
4-I l"
s, ',
l
~
I January 30.-1975 THROUGH-WALL CRACKS IN CORE SPRAY PIPING AT DRESDEN-2 s
i DESCRIPTION OF CIRCUMSTANCES:
4 1
The Commonwealth Edison Company notified the Region III Office of the Office of' Inspection and Enforcement by telephone on January 28, 1975, 3
of the finding of five through-wall cracks in the 10" diameter core j
spray piping system at the Dresd,en 2 facility.
The licensee reported that 3 cracks were-identified in the "A" core 4
spray loop and 2 cracks were identified in the "B" core spray loop. The 4
cracks were revealed when moisture was observed sceping from them after l
the pipe insulation was removed in preparation for in-service _ inspection.
The cracks range from 1/8" to 3/4" in length on the outside surface.
i The three cracks in the "A" loop are-in an approximately 9" long "
dutchman" insert which is welded on one end to the reactor vessel nozzle safe-end and on the other end to the core spray inlet piping.
The safe-
]
end and dutchman insert are reportedly fabricated-from Type 316 stainless steel while the core spray piping is Type 304 stainless steel. Two of-these cracks are longitudinal and in the' beat affected zone of the weld l
between the safe-end and dutchman insert. The other crack is circum-l ferential and in the heat affected zone of the weld between the inlet piping and dutchman insert.
i '
The two cracks in the "B" loop are circumferentia'l and on the pipe side j
of the heat affected zone of the weld between the inlet piping and the dutchman insert.
Volumetric examination of all welds in the core spray lines is currently -
l in progres's by the licensee.
I ACTION TO DE TAKEN BY LICENSEES:
Tor all boiling water reactors, with operating license:
i=
1.
Complete, within 20 days of the date of this Bulletin, the inspection and test program described below. The inspection should be performed l
generally in accordance with the requirements of Appendix I'of the 1974 l
Edition of Section XI of the ASME Code, except that volumetric
-examination-should cover.a disthnce of one pipe radius on each_ side
-of the welds. Where necessary evaluation'or confirmation of ultrasonic i
indications, supplementary examination-techniques shall be_used.
l i
l 4
3 1
Wo70 506 oI~
r r
,,<,-e r,..
-,s
-y
- 347w, v
7v,-,,,u,7n,-,m,,,,r,
.y y
y,-w,i.-,,y
.,-,-e,
as su aae saaa oev. os ea
=
c.
Examine all circumferential welds in each core spray loop up to and including the valve-to-pipe weld in the second isolation valve from the reactor pressure vessel.
Conduct a system functional test or hydrostatic test on the core spray system piping beyond the second isolation valve.
b.
Select for examination a representative sampling of the pressure retaining welds in austenitic piping that is a part of the reactor coolant pressure boundary. This sample should include a minimum of two selected circumferential welds in one loop of each of the piping systems (as applicable to your facility) listed below, and two selected circumferential welds in each representative branch piping run of greater that 2" nominal pipe size in those piping systems listed below.
(1) Main recirculation piping, including jet pump riser.
(2) Low presspre coolant injection system.
(3) Reactor head spray system.
(4) Control rod drive return system.
(5) Standby liquid poison system.
(6) Reactor cleanup system.
(7) Reactor feedwater system.
2.
Notify this Office by telephone with 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> and in writing within 10 days of your schedule for conducting the examinations and test described in 1 above.
3.
Notify this Office within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> (with written confirmation within 10 days) of their completion, of the results of the examinations and tests conducted in response to this Bulletin. A copy of the written notification of examination results (including all enclosures) should be sent to the Assistant Director for Construction and Operations Office of Inspection and Enforcement, Nucicar Regulatory Commission, Washington, D.C.
20555.
We would also appreciate your comments regarding the significance and resolution of the problems involving the several cracks which have been revealed in boiling water reactor piping systems in recent months.