Forwards IE Bulletin 75-01A, Through-Wall Cracks in Core Spray Piping at Dresden-2, Which Revises Actions Required of Util in Response to IE Bulletin 75-01
ML20127G404
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 02/07/1975
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Wachter L
NORTHERN STATES POWER CO.
References
IEB-75-01A, IEB-75-1A, NUDOCS 9211160588
Download: ML20127G404 (1)


Text

-

UNITED STATES NUCLEAR REGULATORY COMMISSION DIRECTORATE OF REGULATORY OPERATIONS REGION lil 7ss roosevelt RO AD l'

cLEN ELLYN ILUNOIS 60M7 February 7, 1975 Northern States Power Company Docket No. 50-263 ATTN Mr. Leo Wachter, Vice President Power Production and System Operation 414 Nicollet Mall Minneapolis, Minnesota 55401 Gentlemen Enclosed is IE Bulletin No.75-01A which revises the actions requirs.d of you in response to IE Bulletin No. 75-01.

Should you have questions regarding this Bulletin or the actions required of you, please contact this office.

Sincerely yours.

James G. Keppler Regional Director

Enclosure:

IE Bulletin No. 75-OLA Approved by CAO, B-180225 (R0072), clearance expires 7-31-77. Approval was given under a blanket clearance specifically for identified generic problems.

bec:. DR Central Files IE Files PDR Local PDR OGC, Beth, P-506A Anthony Roisman, Esq.

OWTIO4 v

l 9211160588 750207 i

PDR ADOCK 05000263

..G-PDR

j IE Bulletin No.75-01A February 7, 1975 THROUGH-WALL CRACKS IN CORE SPRAY PIPING AT DRESDEN-2

(

REFERENCE:

1E BULLETIN NO. 75-01, DATED 1/30/75) i The purpose of this bulletin is to confirm the understanding given-verbally to BWR licensees regarding acceptable methods of implementing IE Bulletin 75-01.

1.

Volumetric examinations of those welds specified in IE Bulletin No. 75-01 should cover a distance of approximately six times the pipe i

vall thickness (but not less than 2 inches, and need not exceed 8 inches) each side of the weld.

i Ultrasonic examinations of welds between piping and cast components (valves, pump bodies, etc.) may be conducted from the pipe side of 4

the weld, but should be conducted such that the ultrasonic beam fully penetrates the weld and heat affected zone of the cast component.

2.

Ultrasonic or other volumetric examinations within the areas defined in 1., above, shall, as a minimum, be consistent with the procedures licensees have used previously during the conduct of 4

baseline and/or inservice inspections.

Where necessary for evaluation or confirmation of ultrasonic indications, supplementary examination techniques shall be used.

3.

The bulletin does not require examination of reactor coolant pressure boundary welds in austenitic stainless steel piping 2 i

inches nominal pipe size and smaller or pipe welds in material j

other than austenitic stainless steel.

This does not exclude the required examination of the core spray nozzle to safe-end welds.

4.

If a specified system has two or more branch piping runs which are substantially the same (size, length, complexity, etc.) select for examination, two welds from one of the branches.

Where branches are not substantially the same (e.g., differ in pipe size complexity 1

or length), select for examination two welds from each branch.