ML20127G376
| ML20127G376 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 04/21/1985 |
| From: | Brownlee V NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Tucker H DUKE POWER CO. |
| Shared Package | |
| ML20127G377 | List: |
| References | |
| NUDOCS 8505210048 | |
| Download: ML20127G376 (2) | |
Text
m Yellaxi w-April 21,1985 Duke Power Company.
~ ATTN: Mr. H.'B.' Tucker, Vice President Nuclear Production Department 422 South Church Street
- Charlotte, NC 28242 Gentlemen:
SUBJECT:
CATAWBA EXAMINATION REPORT 413/0L-85-02
.The NRC administered examinations on April 3,1985 to employees-of your company who had. applied for. licenses to operate-the Catawba Nuclear Plant.
At the conclusion of the. examinations, the examination questions and preliminary.
s findings _.were discussed with those members 'of your staff identified in the Examination Report, Enclosure 1.
A table. summarizing the examination' results for each examined -individual is provided_as Enclosure 2; Copies'of the written. examination questions and answer key are included in this report as Enclosure 3.
~
In accordance with 10 -CFR 2.790(a), a copy of this letter and Enclosures 1 and 3 will _be' placed -in NRC's Public-Document Room unless you notify this office by
.. telephone within' 10 days: of the 'date ' of this letter and submit written application to withhold information contained therein within 30 days of the date
- of this letter.-. Such application must be consistent with the requirements of 10
.CFR_2.790(b)(1).
Enclosure.2 is exempt from public disclosure pursuant to 10_CFR 2.790(a) and will not be sent to the Public Document Room..
Should you_have'any questions concerning this letter, please contact us.
~
Sincerely, (Original signed by VLBrownlee)
Virgil L. Brownlee,. Chief Reactor Projects Branch 2 Division of Reactor Projects
Enclosures:
- 1. Examination Report 50-413/0L-85-02
-2. Table _of Examination Results-
-(Official Use Only-Privacy Act
.Information)
~3..R0/SRO. Exam Questions and Answer Key-cc'w/encls:
(See page 2)
. I l ((g
o-
.b-Duke Power Company.
April 21,1985 2
cc w/encls. 1 & 2:
S. R. Frye, Corporate Training Director
~J. W. Hampton, Station Manager Ecc w/encls. 1, 2, & 3:
W. Barron, Site Training Supervisor bec w/encls. 1,~2, & 3:-
Senior Resident Inspector bcc w/ enc 1.
1:
Project Manager, NRR State of North Carolina' bec w/encls. 1 & 3:
Operator Licensing Branch, DHFS,NRR Document Control Desk
~bec w/o encls:
Judy Coleman, IMS RIIf a @I RIIY RI%
RT RII GDouglas:jw BWilson AFG bson PRBemis HC nce 4//p/85 4/M/85 4/
85 4/r)/as 4/ /85 m-