Text
'..
s.
OPERATW NTe.'tEPORT DOCKET NO.
50-336 DATE 1/06/93 COMPLETED BY S.
Doboe-TELEPHONE (203) 447 1791 EXT.
_4679 OPERATINQ_ STATUS Notes: Items 21 and 22 1.
Unit Name:
Millstone Unit 2 cumulative are weighted 2.
Reporting Period:
December 1992-averages. Unit operated 3.
Licensed Thermal Power (HWt):
2700 at 2560 MVTH prior to its 4.
Nameplate Rating (Cross MWe):
909 uprating to the current 5.
Design Electrical Rating (Net MWe):
870 2700 MWTil power level.
6.
Maximum Dependable Capacity (Gross MWe):
903.10 7.
Maximum Dependable Capacity (Net MWe):
873.10 8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
N/A 1
9.
Power Level To Which Restricted, If any (Net MWe):
N/A
- 10. Reasons For Restrictions, If Any:
N/A This Month Yr.-To Date Cumulativo
- 11. Ilours In Reporting Period 744.0 8784.0 149184.0
- 12. Number of Ilours Reactor Was Critical 0.0 3204.0 105257.6
- 13. Reactor Reserve Shutdown Pours 0.0 0.0 2205.5
- 14. llourn Generator On Line 0.0 3188.6 100357.4
- 15. Unit Reserve Shutdown 1:ours 0.0 0.0 468.2
- 16. Gross Thermal Energy Cencrated (MWil) 0.0 8506218.0.
276028682.4
- 17. Gross Electrical Energy Generated (MWil) 0.0 2827636.5 84404307.5
.18. Net Electrical Ener6y Generated (MWil)
(-3020.01 2705109.3 80950887.3
- 19. Unit Service Factor 0.0 36.3 67.3
- 20. Unit Availability Factor 0.0
-36.3
=67.6
- 21. Unit Capacity Factor (Using MDC Net)
-0.5 35.3 64.3
- 22. Unit Capacity Factor (Using DER Net)
-0.5 35.4 63.1
'23, Unit Forced outage Rate 0.0 11 4_
_ _ _. The Unit 15.4
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):
is nresentiv shutdown for refueling. renlacement of the steam generators and main-tenance.
Duration - 237 days.
- 25. If Unit Shutdown At End Of Report Perfod, Estimated Date of.Startup; January. 1993 126.
Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A 9301210134 930111 PDR ADOCK 05000336 R.
PDR-
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-336 I
UNIT:
Millstone Unit 2 DATE:
1/06/93 i
COMPLETED BY:
S. Doboe TELEP110NE:
(203) 447-1791._
EXT:
4678 MONTil:
DECEMBER 1992 DAY AVO. DAILY POWER LEVEL DAY AVO. DAILY POWER LEVEL (MVe-Net)
(MWe-Net) 1 0
17 0
2 0
18 0
3 0
19 0
4 0
26' O
5 0
21 0
6 0
22 0
7 0
23 0
8 0
24 0
9 0
25 0
10 0
26 0
11 0
27 0
12 0
28 0
13 0
29 0
14-0 30 0'
15 0
31 0
16 0
INSTRUCTIONS on this format,= list the average daily unit power level in MWe Net for each day in t.he reporting month.
Compute to the nearest whole megawatt.
n
,.---+m.,
r a
DOCKET NO.
50-336 UNIT SHUTDOWS AND PO*=~ER REDUCTIONS UNIT NAME Millstone 2 DATE 1/06/93 CCMFLETED BY S. Doboe TELEPHONE (203) 447-1791 REPORT MONTH DECEMBER 1992 EXT.
4678 l
2 No.
Date Type Duration Reason Method of License System Component Cause & Corrective (Hours)
Shutting Event Code" Code)
Action to 3
Down Reactor Report e Prevent Recurrence
'03 920529-S 744 C
1 N/A N/A N/A Continuation of the re-fueling, steam generator replacement and mainten-ance outage from the previous month.
I: Forced 2
3 F
Reason:
Method
' Exhibit C - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test '
2-Manual Scram Entry Sheets for License C-Refueling 3-Automatic. Scram Event Report (LER) File D-Regulatory Restriction' 4-Continued from (NUREG-0161)
E-Operator' Training & License Examination Previous month S
F-Administrative 5-Pouer Reduction Exhibit 1 - Same Source C-Operational Error (Explain)
(Duration -0)
H-Other (Explain) 6-Other (Explain)-
e,.
REFUELING INFOPRATION REQUESI 1.
Hamo of facility:
Millstone 2 2.
Scheduled date for next refueling shutdown:
_ Currently __in the EOC 11 Refuelina Maintenance and Steam Generator Replacement gutnae.
3.
Scheduiod date for restart following refueling:
_JanuGry. 1993 4.
Will refueling or resumption of operation thereafter requiresa technical specification change or other license amendment?
YES 5.
Schuduled date(s) for submitting licensing action and supporting information:
L h. h a action was submitted to U.S.
Nuclear Roaulatory Commission in_ October 1992.
6.
Important licensing considerations associated with refueling, e.g.,
now or difforont fuel design or supplier, unroviewed design or performance analysis methods, significant changos in fuel design, now operating procedures Millstone 2 is red 1Acina the Stnam Generator sub-assemblies during the_present End of CV.ple 11 refuelina outane.
This is beina accom; pl_isaed under 10CFR 50.59.
7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
In Coro:
'(a) 217 In Spent Fuel Pools (b) -lai.
NOTE: _ 'teso numbers repIngent the total Fuel Assemblies and Consol-adated Fuel Storago Boxop (3 total - containina the fuel rods from 6-fuel nysemblies) in these two (2) Item Control Areas.
8.
The present licensed spent fuel pool storage capacity and tho size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblioc:
Current)v 1237 9.
.The projected dato of the last refueling'that can be' discharged to the spent fuel pool assuming the prosent licensed capacity:
1994. Spcot Fyel__ Pool Full. Core Off Load capacity is roached.
1998. Coro Full. Spont-Fuel Pool Full.
a