Revised Monthly Operating Rept for Nov 1992 for Millstone, Unit 2
ML20127G072
Person / Time
Site: Millstone Dominion icon.png
Issue date: 11/30/1992
From: Doboe S
NORTHEAST UTILITIES
To:
Shared Package
ML20127G047 List:
References
NUDOCS 9301210136
Download: ML20127G072 (1)


Text

.

OPERATING DATA REPORT HEVISED DATA DOCKET No.

50- 3)fc DATE _12/07/92 COMPLETED liY L poboe TELEPil0NE (203) 447 1791 EXT.

4678 M11ATING STATUli Notes: Items 21 and 22 1.

Unit Name:

M111E1.2nt SnLL.2_.

cumulative are weighted 2,

Reporting Period:

  • November _1992 averages. Unit operated 3.

Licensed Thertnal Power (MWL):

2700 at 2560 MWTil prior to its 4.

Nameplate Rating (Gross MWe):

909 uprating to the current 5.

Design Electrical Rating (Net MWe):

870 2700 MWTil power level.

6.

Maximurn Dependable Capacity (Gross MVe):

903.10 7.

Maxitnwn Dependable Capacity (Net MWe):

873.10 8.

11 Changes occur in Capacity Ratings (1 terns Number 3 Through 7) Since Last Report, Give Reasons:

N/A 9.

Power Level To Which Restricted, If any (Net MWe):

UZA

10. Reasons For Rectrictions, If Any:

N./A This Month Yr. To Date Cumulative

11. Ilours In Reporting Period 720.0 8040.0 1/d440.0
12. Number of Ilours Reactor Was critical 0.0 3204J 105257.6
13. Reactor Reserve Shutdown llourn 0.0 0.0 2205.5
14. Ilourn Generator On Line 0.0 3188.6 100357.4
15. Unit Reserve Shutdown llourn 0.0 0.0 41HJ
16. Cross Thermal Energy Cenerated (MWil) 0.0 8506218.0 276028682.4
17. Gross Electrical Energy Generated (MVil) 0.0 2827636.5 84404307.5
18. Net Electrient Energy Generated (MWil)

( 2488.0)

  • 2198129.3
  • . 80953907.3
19. Unit Service Factor 0.0 39.7 67.6
20. Unit Availability Factor OJ 39.7 67.9
21. Unit Capacity Factor (Us.ing MDC Net)

-0.4 38.h 64.3

22. Unit Capacity Factor (Using DER Net)

-0.4 38.7 63.1

23. Unit Forced Outage Rate 0.0 11.4 15.4 24 Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

The Unit in presently shtttdown for refniMpg replacement of the stenm cenerators and main-t ett011tp.

Dura. Lisp - 210 days.

25. If Unit Shutdown At End Of Report Period, Estimated Date of Startup: _.D.tr e mbe r. 1992 26.

Unita In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION

_ N/A N/A

  • REVISED DATA VALUES DUE TO CALCUIATIONAL ERROR 9301210136 930111 PDR ADOCK 05000336 g