Responds to NRC Re Violations Noted in Insp Rept 50-261/85-12.Corrective Actions:Operations Surveillance Test OST-108 Revised to Include Requirement to Run Boric Acid Pumps for 5 Minutes Prior to Taking Required Data
ML20127E900
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 03/28/1985
From: Morgan R
CAROLINA POWER & LIGHT CO.
To: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20127E892 List:
References
RNPD-85-644, NUDOCS 8505200249
Download: ML20127E900 (2)


Text

~- --

. :;, ?-

p'O CfEL Carohna P,oger & Light Company

~ '

g\ v e, , .

ROBINSON NUCLEAR PROJECT DEPARTMENT POST OFFICE BOX 790 HARTSVILLE, SOUTH CAROLINA 29550 MAR 2 B B b Robinson File No: 13510E Serial: RNPD/85-644 Dr. J. Nelson Grace, Regional Administrator United States Nuclear Regulatory Commission Region II 101 Marietta Street, N. W., Suite 3100 Atlanta, Georgia 30323 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261 LICENSE NO. DPR-23 REGION II INSPECTION REPORT 85-12

Dear Dr. Grace:

Carolina Power and Light Company (CP&L) has received and reviewed the subject report and provides the following response.

Severity Level V, Violation RII-85-12-01-SL5 10CFR50, Appendix B, Criterion V, requires activities affecting quality be prescribed by documented procedures. ASME Boiler and Pressure Vessel (B&PV)

Code, 1978 edition, with Addenda through the Summer of 1978, has been identified as the applicable code for inservice testing of pumps and valves.

ASME B&PV Code,Section XI, Paragraph IWP 3500(a), Duration of Test, requires each pump to be run five minutes under conditions as stable as the system permits prior to making the required observations or measurements. Carolina Power and Light Company (CP&L) Procedure OST-108, Revision 4, " Boric Acid Pumps Inservice Inspection (Monthly)," has been identified as the applicable procedure for inservice testing of the "A" and "B" Boric Acid Pumps.

Contrary to the above, activities affecting quality were not adequately prescribed by documented procedures in that CP&L Proceoure OST-108, Revision 4, " Boric Acid Pumps Inservice Inspection (Monthly)," does not require that the pump and system be allowed to stabilize for five minutes prior to taking required data.

Response

1. Admission or Denial of the Alleged Violation CP&L acknowledges the alleged violation.

8505200249 850409 PDR ADOCK 05000261 G PDR

Y3 Ji Q ,

Letter to Dr. J. Nelso2 Graca -l

-Serin 1:~ RNPD/85-644 '

.P 2 [

+

s 7

i

2. 11eason for the Violation

- The Inservice Inspection (ISI) requirement of ASM Section XI IWP-3500(a),

to run-the Borio Acid Pumps for a minimum of five (5) minutes, prior to  ;

i. 'taking data, was not included in the Operations Surveillance Test OST-108 r due to an oversight. A review of the other ISI pump test procedures l

. verified that the omission of the minimum run time requirement in OST-108 i was an isolated case. A statement similar to; "After the pump has run for  ;

five (5) .ainutes, record the required data," was included in the other ISI  ;

pump tests. .  ;

s  ;

3.- Corrective Steps hioh Have Been Taken Effective March 19, 1985, 087-108 has been revised to include the.  ;

requirement to run the Borio Acid Pumps for five minutes prior to taking the required data.. t

4. Corrective Steps Wioh Will be Taken  :

No further corrective.aotion is required.  ;

5. Date When Full Compliance Will be Achieved

.' Full compliance has been achieved with the above revision to OST-108.

LIf you have any questions regarding this response, please contact ,

Mr.' David C. Stadler at (803)(383-4524, Extension 363 .s Very truly yours, i- .

r R. E.

General Manger i H. B. Robinson S. E. Plant I i g

CLW/tk:C-306'-  ;

t 00: H. E. P. Krug.