ML20127E810

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-267/85-12 on 850415-19 & Notice of Violation
ML20127E810
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 05/07/1985
From: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Lee O
PUBLIC SERVICE CO. OF COLORADO
Shared Package
ML20127E814 List:
References
NUDOCS 8505200221
Download: ML20127E810 (2)


See also: IR 05000267/1985012

Text

-

_

__

,

, ,;

- MAY 0 71985 -

In Reply Refer To:

- Docket:

50-267/85-12

Public Service Company of Colorado

ATTN:

0. R. Lee, Vice President.

Electric Production

P. O. Box 840

l'

Denver, Colorado 80201

Gentlemen:

This refers to the inspection conducted by Mr. M. E..Skow of this office during

the period April 15-19, 1985,.of activities authorized by NRC Operating

License DPR-34 for Fort St. Vrain, and to the discussion of our findings with

Mr. Gahm and other members of your staff at the conclusion of the inspection.

Areas examined during the inspection included maintenance with r,pecific focus

!

J.

on the control rod drive refurbishment. Within these areas, the inspection

consisted of selective examination of procedures and representative records,

interviews with personnel, and observations by the inspector. . These findings

are documented in the enclosed inspection report.

During this inspection, it was' found that certain of your activities were in

violation of NRC requirements. Consequently, you are required to respond to

this violation, in writing, in accordance with the provisions of Section 2.201

of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal

Regulations. Your response should be based on'the specifics contained in the

Notice of Violation enclosed with this letter.

The response directed by this letter and the accompanying Notice is not subject

to the clearance procedures of the Office of Management and Budget as required

!

by the Paperwork Reduction Act of 1980, PL 96 511.

Should you have any questions.concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

orb.ind 0~* W

,

g, n, la n:n

E. H. Johnson, Chief

ReactorProjectBranch1

Enclosures:

(Cont,onnextpage)

RIV:SPES

f/

SPES

RP81 g

MESkow/v

RE!reland

EHJohnson

' #/ 3 /85

j /1/85

T/g/85

Nk

kDNk Noba7

'f,

O

PDR

f

i

,

i

p.

,

.

'

Public Service Company of Colorado

-2-

<

1.

Appendix A - Notice of Violation

2.

Appendix B - NRC Inspection Report

50-267/85-12

cc w/ enclosures:

J. W. Gahm, Manager, Nuclear

Production Division

Fort St. Vrain Nuclear Station

16805 WCR 19 -

Platteville, Colorado 80651

L. Singlete::, Manager, Quality

Assurance Division

(same address)

COLORADO STATE DEPT. HEALTH

bec distrib, by RIV:

  • RPB1

R. P.Denise, DRSP

  • Resident Inspector

R. D. Martin, RA

  • SectionChief(RPB1/SPES)

E. Haycraft, LA

  • P. Wagner, RPB1

J. Miller, ORB 3

80. Powers, RPB1

  • D. Weiss, LFM8 (AR-2015)
  • EP&RPB
  • M.

Skow

  • MIS System
  • RSTS Operator
  • RIV File
  • w/766

- -

-

.

-