Insp Rept 50-267/85-12 on 850415-19.Violation Noted: Failure to Fill Out & Sign Authorization Sheet to Rework Task 1 of FHPWP-100-11 Prior to Starting Work
ML20127E860
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 05/07/1985
From: Ireland R, Skow M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20127E814 List:
References
50-267-85-12, NUDOCS 8505200236
Download: ML20127E860 (3)


See also: IR 05000267/1985012

Text

g ,.

--

.

APPENDIX B

U. S. NUCLEAR REGULATORY COMMISSION

REGION IV

'

NRC In:pection Report:

50-267/85-12

License:

DPR-34

Docket:

50-267

Licensee:

Public Service Company of Col)rado (PSC)

P.O. Box 840

Denver, Colorado 80201

Facility Name:

Fort St. Vrain Nuclear Station (FSV)

Inspection At:

Platteville, Colorado

Inspection Conducted:

April 15-19, 1985

Inspector:

////b

J/3/rr

M. E. Skow, Reactor Inspector

Date

Special Projects and Engineering Section

Reactor Project Branch 1

-Approved:

[8.cdAf

5/7//E

R. E. Irelanc , Chier,15pecial Projects and

Fate /

Engineering Section, Reactor Project Branch 1

Inspection Summary

Inspection Conducted April 15-19, 1985 (Report 50-267/85-12)

Areas Inspected:

Routine, unannounced inspection of maintenance with specific

emphasis on the control rod refurbishment program.

The inspection involved

36 inspector-hours onsite by one NRC inspector,

i-

Results:

Within the area inspected, one violation was identified (failure to

follow procedures, paragraph 2).

8505200236 050507

DR

ADOCK 0500

7

-

.

.

-

.

-

-

-

-

-

-

- - _ - _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ -

. _ _ - _

__

._

_ _

_ -

-_- _ _ _ _

'

..

j

-2-

DETAILS

1.

Persons Contacted

  • J. Gahm, Manager, Nuclear Power Operations
  • C. Fuller, Station Manager

i

  • F. Novachek, Technical / Administrative Services Manager

D. Warembourg, Manager, Nuclear Engineering

  • L. Singleton, Manager, Quality Assurance (QA)
  • M. Ferris, Manager, QA Operations

r

  • F. Borst, Support Services Manager
  • M. Niehoff, Manager, Nuclear Site Engineering
  • T. Orlin, QA Service Manager
  • T. Prenger, QA Engineering Supervisor
  • R. Craun, Supervisor, Nuclear Site Engineering
  • G. Redmond, MQC Supervisor
  • D. Frye, Licensing Specialist
  • T. Schleiger, Health Physics (HP) Supervisor
  • G. Powers, Scheduling / Stores. Supervisor
  • Denotes those present at exit interview.

2. .

Maintenance

During this inspection, control rod refurbishment continued.

CRDOAs 42

and 17 were completed and installed in the core, CRDOAs 39 and 16 were

removed from the core and began to be refurbished.

CRDOAs 11, 12, and 13

were in the process of being refurbished.

CRDOA 17 failed the " moment"

specification of its first in-core back EMF test.

Several subsequent

testsrevealedperformancesometimesjustpassingandsometimesjust

failing.

The cause of this performance had not been identified during

this inspection.

While inspecting some of the work procedures, the NRC inspector observed

the following:

The Authorization Sheet to Rework Task 1 of FHPWP-100-11 had not been

filled out or signed by the shif t manager and health physics prior to

starting work.

Step 11.0 of that Rework Task also was not signed by

health physics.

Task 42 of FHPWP-100-39 was completed without the health physics

notification signature required in Step 42.0.

I

--

. _ __ -

. _ . .

_

___ -__.

_ _ - _ _ _ _ _

._

.

-

_ - _ _

_ -_ ___ -_

. - _ _ _ _ _ _ _

/

- w

>

.

-

A.ie,,

-3-

'

e'

Task'15 of FHPWP-100-39'was signed out at 5:00 a.m. on April 17,

1405, and was not signed in.by the end of the shift as required by

that procedure.

,

This!is a violation.

(50-267/8512-01)

.3.

Independent Inspection Effort

'

'The NRC inspector found a marked " Fire Door" open.

The door to the truck

bay from level 5 of the reactor building was propped open by an air hose.

No one was in the area. When notified, operators in the control room

promptly directed the hose removed and the door shut. Other fire doors

L

,

i

.that were propped open were tagged with an " auxiliary system status card"

in accordance with Administrative Procedure P-2, " Equipment Clearances and

Operations Deviations."

This was considered an isolated' incident.

No violations or deviations

.were noted.

,

4.

Exit Interview.

An exit. interview was held April 19, 1985, with Mr. J. W. Gahm, Manager,

Nuclear Froduction, and other PSC personnel as denoted in paragraph 1 of

this report.' The NRC senior resident inspector also attended this

meeting.

At the meeting, the scope of the inspection and findings were

<

summarized.

,

>