Forwards Request for Addl Info Re Initial Test Program. Questions Refer to Justifications for Items in FSAR Figure 14.2-5 Re Startup Test Program
ML20127E783
Person / Time
Site: River Bend Entergy icon.png
Issue date: 04/30/1985
From: Schwencer A
Office of Nuclear Reactor Regulation
To: Booker J, William Cahill
GULF STATES UTILITIES CO.
References
NUDOCS 8505200203
Download: ML20127E783 (5)


Text

___._'~__

1- , ,

APR 3 0 198.5 Docket No. 50-458 ,

Mr. William J. Cahill, Jr.

Senior Vice. President River Bend Nuclear Group Gulf States Utilities Company Post Office Box 2951 Beaumont, Texas 77704 ATTN: Mr. J. E. Booker

Dear Mr. Cahill:

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION - INITIAL TEST PROGRAM As a part of'the NRC staff's review of your application for an operating license for River Bend Station, the staff has determined the need for additional information in the. area of the initial test program. The request for information is included in the enclosure as Item 14 E.

These questions refer to justifications for items in FSAR Figure 14.2-5, "Startup Test Program."

Please inform NRC Project Manager, Stephen Stern, of your schedule for response and for clarification or further discussion on this topic. This information is required for resolution of open issues which must be resolved prior to fuel load.

Sincerely, Oricitml sinned hv t A. Schwencer, Chief Licensing Branch No. 2 Division of Licensing

Enclosure:

~As stated cc w/ enclosure:

See next.page Distribution:/Dodket[ File: N DR Local PDR PRC System NSIC LB#2 Reading ' EHylton SStern JPartlow BGrimes EJordan Dewey,0 ELD ACRS (16) DZiemann Becker 1r

\

LB hl/PM LB 2/DL/BC SS rn:lb ASchwencer 8505200203 850430 PDR ADOCK 05000458 A PDR 04/[g185 0"yh85

h,  :. -- ;;. . ,

1 APR 3 0 1985

-'Dccket No. 50-458 Mr. William J. Cahill, Jr.

Senior Vice President:

River Bend Nuclear Group Gulf States Utilities Company_

Post Office Box 2951 E . Beaumont, Texas 77704 ATTN: Mr. J. E. Booker

Dear' Mr. Cahill:

i

^

SUBJECT:

1-REQUEST FOR ADDITIONAL INFORMATION - INITIAL TEST PROGRAM As a part of the NRC. staff's review of your application for an operating license for River Bend Station, the staff has determined the need for additional information in the area of the initial test program. The request for infomation 'is-included in the enclosure-as Item 14 E.

These questions refer to justifications for items in FSAR Figure 14.2-5, "Startup Test Program."

PleaseLinform NRC Project Manager, Ste' phen Stern, of your schedule for response.and for clarification or further discussion on this topic. This Linformation-is required for resolution of open issues which must be resolved prior to fuel load.

Sincerely.

Orisioni simied hv A. Schwencer, Chief Licensing Branch No. 2 Division of Licensing

+

Enclosure:

As stated cc w/ enclosure:

See next page I I\.

Distribution: Docket File NkCPDR Local PDR PRC System NSIC

'LBf2 Reading EHylton SStern JPartlow BGrimes EJordan Dewey,0 ELD ACRS-(16). DZiemann Becker

1e

. /

LBf2/DL/BC LB(iern:1b SSt .y/pL/PM

'ASchwencer-

.04/h85,- 04/f(/85

. .. . U

1 9

  1. pe nam), UNITED STATES 3 j(j NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20655

~ g,*****,/

APR 3 0 1985 Docket No. 50-458 Mr. William J. Cahill, Jr.

Senior Vice President River Bend Nuclear Group Gulf States Utilities Company Post Office Box 2951 Beaumont, Texas 77704 ATTN: Mr. J. E. Booker

Dear Mr. Cahill:

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION - INITIAL TEST PROGRAM As a part of the NRC staff's review of your application for an operating license for River Bend Station, the staff has determined the need for additional information in the area of the initial test program. The request for information is included in the enclosure as Item 14E.

These questions refer to justifications for items in FSAR Figure 14.2-5, "Startup Test Program."

Please infonn NRC Project Manager, Stephen Stern, of your schedule for -

response and for clarification or further discussion on this topic. This information is required for resolution of open issues which must be resolved prior to fuel load.

Sincerely, a N O $6 Y U A. Schwencer, Chief Licensing Branch No. 2 Division of Licensing

Enclosure:

As stated cc w/ enclosure:

See next page l

l

e o .

River Bend Station Mr. William 'J. Cahill, dr.

Senior Vice President River Bend Nuclear Group.

Gulf States Utilities Company

. Post' Office Box 2951 Beaumont, Texas 77704 ATTN: Mr. J. E. Booker cc: , Troy B. Conner, Jr. , Esq. Ms. Linda B. Watkins/Mr. Steven Irving Conner and Wetterhahn Attorney at Law

'1747 Pennsylvania Avenue, N. W. 355 Napoleon Street Washington, D.C. 20006. Baton Rouge, Louisiana 70802 Mr. William J. Reed, Jr.

Director - Nuclear Licensing Gulf States Utilities Company Post Office Box 2951

. Beaumont, Texas 77704 Mr. David Zaloudck Nuclear Energy Division H. Anne.Plettinger Louisiana Department of 3456 Villa Rose Dr. Environmental Quality Baton Rouge, Louisiana 70806 Post Office Box 14690

  • Baton Rouge, Louisiana 70898 Richard M. Troy, Jr. , Esq.

Assistant Attorney General in Charge State-of Louisiana Department of Justice

.234 Loyola Avenue New Orleans, Louisiana, 70112

~

Mr. J. David McNeill, III.

Dwight D. Chamberlain William G,. Davis, Esq.-

Resident Inspector Department of Justice Post Office Box 1051 Attorney General's Office St. Francisville, Louisiana 70775 7434 Perkins~ Road Gretchen R. Rothschild Louisianians for Safe Energy, Inc.

1659 Glenmore' Avenue Baton Rouge, Louisiana 70775 James W. Pierce, Jr., Esq.

~

.P. O. Box 23571

. Baton Rouge, Louisiana 70893

,m , , , n - -- - - ,,-- --,- ., ,- - - - , - + - - - -m,

e

~ ~

Enclosure STAFF POSITION AND REQUEST FOR ADDITIONAL INFORMATION RIVER BEND STATION, UNITS 1 AND 2

' Item 14E Either reinstate, change, or' provide technical justification for the following in FSAR Figure 14.2-5, "Startup Test Program":

a. Test No.13 " Process Computer" test at TC6 (Regulatory Guide 1.68, App. A.S.r).
b. Test No. 26 " Relief Valves" test at TC6 and Note 24 (low-low set logic function test).
c. Test No. 27 " Turbine Trip and Generator Load Rejection" -

Note 19 should be modified to state that a generator load rejection will be conducted at 100% power in accord with revised FSAR Subsection 14.2.12.3.24 Turbine Trip and Generator Load Rejection.

^

J 'e 1

i e

s I

1 l