Revised Monthly Operating Rept for Nov 1992 for Songs,Unit 1
ML20127E540
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 11/30/1992
From: Darling J
SOUTHERN CALIFORNIA EDISON CO.
To:
Shared Package
ML20127E521 List:
References
NUDOCS 9301190364
Download: ML20127E540 (2)


Text

. _. -. _

O'

[

ATTACHMENT A Revised November 1992 Unit Shutdowns and Power Reductions SONGS Unit 1 Monthly Operating Report i

mor.nov/8 93011J@f$ o$ooobo6 PDR PDR R

~ ___

i.

1-UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO: 50-206 i

UNIT NAME: SONGS - 1 I

REPORT MONTH: November 1992 DATE:

      • Revised ***

COMPLETED BY:

J. L. Darlinq TELEPHONE:

(714) 368-6223 a

i-Method of i

Shutting Cause & Corrective Duration Down LER System Component Action to i

No.

Date Type (Hours). Reason

  • Reactor'-

No.

Code' Code

  • Prevent Recurrence l

{

i: 157 921128-S 18.98*

H 1

NA NA NA See note below Note:

Unit was shut down following completion of cycle 11. The shutdown commenced at 1900 on 11/28/92 and was completed at 0501 on 11/30/92.- The. Unit will not resume operation.

1 i

  • Duration hours revised. This was incorrectly reported as 0.00 hours0 days <br />0 hours <br />0 weeks <br />0 months <br />.

1 Duration was calculated from 0501 11/30/92 to 2400 11/30/92.-

4

{

  1. eason:

' Method:

"IEEE Std 805-1984 52F-Forced R

i-S-Scheduled A-Equipment Failure (Explain)-

1-Manual B-Maintenance or Test 2-Manual Scram.

S C-Refueling 3-Automatic Scram.

IEEE Std 803A-1983 D-Regulatory Restriction 4-Continuation from E-Operator Training & License. Examination Previous Menth j

F-Administrative 5-Reduction in the Average j

i

{ --

G-Operational Error (Explain)'

Daily Power Level of mere i-H-Of.her (Explain) than PG's from the previous day 6-Other (Explain) l