ATTACHMENT A Revised November 1992 Unit Shutdowns and Power Reductions SONGS Unit 1 Monthly Operating Report i
mor.nov/8 93011J@f$ o$ooobo6 PDR PDR R
~ ___
i.
1-UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO: 50-206 i
UNIT NAME: SONGS - 1 I
REPORT MONTH: November 1992 DATE:
- Revised ***
COMPLETED BY:
J. L. Darlinq TELEPHONE:
(714) 368-6223 a
i-Method of i
Shutting Cause & Corrective Duration Down LER System Component Action to i
No.
Date Type (Hours). Reason
- Reactor'-
No.
Code' Code
- Prevent Recurrence l
{
i: 157 921128-S 18.98*
H 1
NA NA NA See note below Note:
Unit was shut down following completion of cycle 11. The shutdown commenced at 1900 on 11/28/92 and was completed at 0501 on 11/30/92.- The. Unit will not resume operation.
1 i
- Duration hours revised. This was incorrectly reported as 0.00 hours0 days <br />0 hours <br />0 weeks <br />0 months <br />.
1 Duration was calculated from 0501 11/30/92 to 2400 11/30/92.-
4
{
- eason:
' Method:
"IEEE Std 805-1984 52F-Forced R
i-S-Scheduled A-Equipment Failure (Explain)-
1-Manual B-Maintenance or Test 2-Manual Scram.
S C-Refueling 3-Automatic Scram.
IEEE Std 803A-1983 D-Regulatory Restriction 4-Continuation from E-Operator Training & License. Examination Previous Menth j
F-Administrative 5-Reduction in the Average j
i
{ --
G-Operational Error (Explain)'
Daily Power Level of mere i-H-Of.her (Explain) than PG's from the previous day 6-Other (Explain) l
- . mor.dec/9
{
1 I
.