4 Document Control Desk NRC HONTHLY OPERATING REPORT DOCKET NO:
50-206 UNIT NAME:
SONGS - 1 DATE:
COMPLETED BY: __J. L. Da rl i na TELEPHONE:
(714) 368-6223 OPERATING STATUS 1.
Unit Name:,_ San Onofre Nuclear Generatina Station. Unit 1 2.
Reporting Period: December 1992 3.
Licensed Thermal Power (MWt):
1347 4.
Nameplate Rating (Gross MWe):
456 5.
Design Electrical Rating (Net MWe):
436 6.
Maximum Dependable Capacity (Gross MWe):
456 7.
Maximum Dependable Capacity (Net MWe):
436 8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7)
Since Last Report, Give Reasons:
9.
Power Level To Which Restricted, if Any (Net MWe):
See item 10
- 10. Reasons for Restrictions, If Any:
Power level reduction from full power as a Lesult of a self-imposed reduced operatina temJerature to retard Steam Generator tube corrosion rate.
This Month Yr.-to-Date Cumulative 11.
Hours In Reporting Period 744_AQ 8.784.00 219.165.00 12.
Number Of Hours Reactor Was Critical 0.00 8.02LO2 129.980.Q2 13.
Reactor Reserve Shutdown Hours 0.00 0.00 0 10 14.
Hours Generator On-Line 0.00 8.021.02 126.040 42 15.
Unit Reserve Shutdown Hours 0.00 0.00 0.09 16.
Gross Thermal Energy Generated (MWH) 0.00 9.862.605.61 J16.041.722.52 17.
Gross Electrical Energy Generated (MWH) 0.00 3.104.691.00 _52.949.635.02 18.
Net Electrical Energy Generated (MWH)
(2.563.00) 2.923.412.00 49.942.787.00 19.
Unit Service factor
- NA NA 57.71%
20.
Unit Availability Factor
- NA NA 57.71%
21.
UnitCapacityfactor(UsingMDCNet)*
NA NA 52.45%
22.
Unit Capacity Factor (Using DER Net)
- NA NA 52.45%
23.
Unit Forced Outage Rate
- NA NA 17.90%
- Final Lifetime Factors.
24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
On November 30. 1992 SONGS 1 was permanently shutdown.
25.
If Shutdown At End Of Report Period Estimated Date of Startup:
NA 26.
Units In Test Status (Prior To Commercial Operation):
Forecast Achieved INITIAL CRITICALITY NA NA INITIAL ELECTRICITY NA NA COMMERCIAL OPERATION NA NA 9301190360 930115 PDR ADOCK 05000206 R
' Document Control Desk AVERAGE DAILY UNIT POWER LEVEL DOCKET NO:
50-206 UNIT NAME: _ SONGS - 1 DATE:
COMPLETED BY: - J. L. Darlina TELEPHONE:
(714) 368-6223 MONTH:
Decembpr--1992 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 0.00 16 0.00 2
0.00 17 0.00 3
0.00 18 0.00 4
0.00 19 0.00 5
0.00 20 0.00 6
0.00 21 0.00 7
0.00 22 0.00 8
0.00 23 0.00 9
0.00 24 0.00 10 0.00 25 0.00 11 0.00 26 0.00 12 0.00 27 0.00 13 0.00 28 0.00 14 0.00 29 0.00 15 0.00 30 0.00 31 0.00 mor.dec/3
Document Control Desk UNIT SHUTDOWMS AND POWER REDUCTIONS DOCKET NO: 50-206 UNIT NAME: SONGS - 1 REPORT MONTH: December 1992 DATE:
COMPLETED BY:
J. L. Darlino TELEPHONE:
(714) 368-6223 Method of Shutting Cause & Corrective Duration Down LER System Component Action to No Date Type (Hours) Reason Reactor No.
Code' Code
- Prevent Recurrence l
l 2
3 i
i 157 921128 S
744 H
1 NA NA NA See note below Note:
Unit was shut down following completion of cycle 11. The shutdown commenced at 1900 on 11/28/92 and was completed at 0501 on 11/30/92. The Unit will not resume operation.
'F-Forced
' Reason:
Method:
S-Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Scram.
S C-Refueling 3-Automatic Scram.
IEEE Std 803A-1983 D-Regulatory Restriction 4-Continuation from E-Operator Training & License Examination Previous Month F-Administrative 5-Reduction in the Average G-Operational Error (Explain)
Daily Power Level of more H-Other (Explain) than 20% from the previous day 6-Other (Explain) mor.dec/4
Document Control Desk
SUMMARY
OF OPERATING EXPERIENCE FOR THE HONTH DOCKET NO:
50-206 UNIT NAME:
SONGS - 1 DATE:
COMPLETED BY:
J. L. Darlina TELEPHONE:
(714) 368-6223 Date Time fy_ent 12/01/92 0001 Unit began the month in Mode 4, cooldown to mode 5 in progress.
12/01/92 0100 Unit entered Mode 5.
12/31/92 2400 Unit in Mode 5.
mor.dec/5 J
O' Document Control Desk REFUELING INFORMATION DOCKET NO:
50-206 UNIT NAME:
SONGS - 1 DATE:
COMPLETED BY:
J. L. Qarling TELEPHONE:
(714) 368-6223 MONTH:
December 1992
- 1. Scheduled date for next refueling shutdown.
Unit permanently shutdown on November 30, 1992 7
d
- 2. Scheduled date for restart following refueling.
l None.
- 3. Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?
Operation will not be resumed. A Possession Only License was issued on October 23, 1992, which will become effective when the NRC is notified that all fuel has been offloaded from the core.
It is anticipated that the reactor will be defueled in mid-March.
Permanently Defueled Technical Specifications are in the process of being developed.
- 4. Scheduled date for submitting proposed licensing action and supporting information.
Not yet determined.
mor.dec/6
O Document Control Desk REFUELING INFORMATION l
DOCKET NO: _h0-206 UNIT NAME: _ SONGS - 1 DATE:
d COMPLETED BY:
J. L. Darlina TELEPHONE:
(71a) 368-6223 i
MONTH:
December 1992
- 5. Important licensing considerations associated with refueling, e.g. new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.
1 Not applicable.
- 6. The number of fuel assemblies.
a)
In the core.
157 b)
In the spent fuel storage pool.
99
- 7. Licensed spent fuel storage capacity.
216 Intended change in spent fuel storage capacity.
None
- 8. Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.
During January 1993, 49 fuel assemblies are scheduled to be transhipped to units 2 and 3 to make room for complete core off load scheduled to J
begin in February 1993. The spent fuel storage pool will be filled to essentially 100% capacity after core offload.
i mor.dec/7