IV.
',
.
JUN 191985
Docket / License: 50-423/CPPR-113
Northeast Nuclear Energy Company
ATTH:
Mr. J. F. Opeka
Senior Vice President - Nuclear
Engineering and Operations Group
P. O. Box 270
Hartford, Connecticut 06101
Gentlemen:
Subject:
Resident Inspection 50-423/85-16 (4/23/85 - 5/27/85)
This forwards NRC findings of the routine safety inspection of the Millstone Nuc-
lear Power Station, Unit 3.
Those findings have been discussed by Mr. T. Rebelowski
of this office with Mr. J. Crockett and other members of your staff.
During the inspection, maintenance evolutions resulted in flooding in part of the
Control Building.
That flooding was found to violate NRC requirements as cited
in the enclosed Appendix A to this letter.
Please reply to that violation in ac-
cordance with the instructions in Appendix A.
In addition, please address in your
reply your assessment of the need to revise generic maintenance procedures to limit
the time interval between verification of maintenance prerequisites and the com-
mencement of work.
Your cooperation with us is appreciated.
Sincerely,
UnKinal 1
gg g
y
-
' Edward C. Wenzinger, Chief
rojec.ts Branch No. 3
Division of Reactor Projects
Enclosures:
1.
Appendix A, Notice of Violation
2.
NRC Region I Report 50-423/85-16 (with Attachments)
cc w/encis:
V. Papadopoli, Construction Quality Assurance Supervisor
E. R. Foster, Director of Generation Construction
E. J. Mroczka, Vice President, Nuclear Operations
D. O. Nordquist, Manager of Quality Assurance
R. T. Laudenat, Manager, Generation Facilities Licensing
W. D. Romberg, Station Superintendent
Public Document Room (POR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Senior Resident Inspector
State of Connecticut
8506240572 050619
DR
ADOCK 050
3
g
I
\\
l
.5
. - - - - - - - - - - -
t
t.
_
.
'
i
.
i
JUN 1 D 1985
Northeast Nuclea Energy Company
2
bec w/ enc 1:
Region I Docket Room (with concurrences)
Senior Operations Officer (w/o enc 1)
DRP Section Chief
Director, DRS
Director, DRSS
G. Walton, SRI, Beaver Valley Unit 2
B. Doolittle, NRR
RI:DRP
RI:DRP
RI:D S
RI:
0,k
G
4 enz
r
Rebelowski/meo
McCabe
Harp ter
f
6/4/85
680.
&
7
0FFICIAL RECORD COPY
1
_ _
. _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ ___