ML20127E209
| ML20127E209 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 04/24/1985 |
| From: | Brownlee V NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Kelly R GEORGIA POWER CO. |
| Shared Package | |
| ML20127E213 | List: |
| References | |
| NUDOCS 8505200005 | |
| Download: ML20127E209 (1) | |
See also: IR 05000321/1985011
Text
ffk
'
.
.
APR 241985
Georgia Power Company
ATTN: Mr. R. J. Kelly
Executive Vice President
P. O. Box 4545
. Atlanta, GA 30302
Gentlemen:
SUBJECT: REPORT NOS. 50-321/85-11 AND 50-366/85-11
On April 9-12, 1985, NRC inspected activities authorized by NRC Operating License
Nos. DPR-57 and NPF-5 ' for your Hatch facility.
At the conclusion of the
inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
reasexamknedduringtheinspectionareidentifiedinthereport. Within these
areas, the inspection consisted of selective examinations of procedures and
. representative records, interviews with personnel, and observation of activities
in progress.
Within the scope of the inspection, no violations or deviations were identified.
Should you have any questions concerning this letter, please contact us.
Sincerely,
Virgil L. Brownlee, Chief
Reactor Projects Branch 2
Division of Reactor Projects
Enclosure:
Inspection Report Nos. 50-321/85-11
and 50-366/85-11
cc w/ enc 1:
J. T. Beckham, Vice President and
General Manager-Nuclear Operation
H. C. Nix, Site General Manager
P. E. Fornel, Site QA Supervisor
L. Gucwa, Chief, Nuclear Engineer
bec w/ enc 1:
NRC Resident Inspector
Hugh S. Jordan, Executive Secretary
Document Control Desk
t
d
State of Georgia
4t
RII
RII
RI
,
B o ley:km
R
one
lake
AH r t
04A&/85
04/lB/85
4/J+/85
04/gb/85
e505200005 es0424
9
DR
ADOCK 0500
1
i
/ ;