Text
.....
~ -
~ - -
r!
Rey, 5 03/06/92
- 8,FJI92 -
Effective Date-57axwustz:m=rre=crammwswxx..-
Document htwn J.,
NFORM ATION ONL h
C. R. Noc!#m l
f Li Excesmwniera.nvrawaneennusversnesamard ANNUNCIATOR RESPONSE AR-902 FLORIDA POWER CORPORATION CRYSTAL' RIVER UNIT 3
- v. :l j.
DGB ANNUNCIATOR RESPONSE y
--TilIS PROCEDURE ADDRESSES SAFETY RELATED COMP 0NENTS 1.
t..
1 g
.4 r
- 0 h'
m Contacy
~
APPROVED'8Y:
eta c
'M
/
!./
~
DATE: f-20,9 t-l-
INTERPRETATION CONTACT: Nuclear Operat-lons-
/-
19ao9tocoo7 920825 Superintendent.
g Q0
!PDRs ADocK 05000302' l.
..y PDR..
s
'n
'S
.T R E OF CONTENTS SECT 10N
- jLAfq[
- J.0 PURPOSE..................
1
- 2.u0 REFERltiCJ1 1
2.1 JMPLLMENTING REFEBffiCIS...............
1 2.2-DEVELOPMENTAL,_,REfF_E.J,ENCES 1
3.0 PERSONNEL [t[DOCTRLNAT103 1
4_. 0 INSTRUCTIONS 1
5.0 FOLLOW-UP ACT I ON S.......................
1 ENCL 050R1 1
Annunciator Response............
2 i
(
\\
i AR-902 Rev. 5 Page i
1,0
- PURPOSI O
1.1 Establish a reference document for each Annunciator Window on the DGB Lampnox.
1.2 Establish operator actions for valid Annunciator alarms on the DGB Lampbox.
1.3 Establish a reference to other procedures which address operator actions for valid Annunciator alarms on the DGB Lampbox.
2.0 REf.ERENCES 2.1 IMP (EHfNTING REFERENCES 2.1.1 OP-707, Operation of -the ES Emergency Diesel Generators.
2.2 DEVELOPMENTAL REFERENCES 2.2.1 INP0 90-021, Good Practice OP-217, Alarm Response Procedures O
3.0 PERSONNEL INDOCTEINATION 3.1 The Diesel Generator A Annunciator System is powered from DPOP-6B Switch 10.
4.0 INSTRUCTIONS 4.1 Respond to alarms on the DGB Lampbox as indicated on Enclosure 1, Annunciator Response.
5.0 FOLLOW-UP ACTIONS None
...O AR-902 Rev. 5 Page 1 i
j 1
q [e
d-t K
.l l
[=CtoSUdE 1 :
'(Page 1 of 6)..
'AhNUNCfATOR PANEL LOCAT'80efr " DC-8 ANhdWC!st0R PANEL-DC-8 VERTICAL COLON 4 1
WINDOW TITLE--
1 INDICATED COWDITICW 1.
AUTO ACTIOM-SETPOINT.SEnStkG.
REFERENCE 2.
CONTROL' R00M 'IhDICA110N-WHICH VERIFY OR :
2.
OPERATOR ACT104 - VALIO ALAE 4 ELEMENT PINPOINT TROUBLE-muMSER S.
LOCATIOW w
g l START FAILURE 1,
Start signat received and:
- 1.. a ) wone.
'i
' ALARM a) After 7 sec' tube oil. press is less than 6 ps!
- 2. a) Peset engine everspeed trip or phase 6 psi DL-10-PS EG-18 or speed is less'than 250 RPM..
diff lockout if'not reset.
250 RPM EG-20-SS
.EG-06 b) or everspeert trip or phase dif f lockout not reset.
- ) Check. dieseti tube of t systerc and air 56 DG 3s EC-02.
~
- 2. a) Diesel faits:to start, start system.
EOR EG-04
- DG-8-1-1 c) motify Maintenance prior to restart.
CRAMECASE 1.- a ) Crarkcase press'h.gh.at 1.0" H,0.
{1. a) None.
j j
HESS '.
- 2. e) id one.
- 2. a) Inform Maintenance Department.
1.0" 40 DL-16-PS l EG-18 HIGN ALARM DL-17-PS.
EG-02 DL-18-PS DG-B 1-2
.i
- _{
-l JACKET'
- 1. 's) Jacket coolant press less than 9 psi and speed
_ a) mone.
COOLANT
' 810 r pm.
- 2. =) Check coolant water tevel.
9 psi DJ-4 PS EG-18
.=
PRESS Low :
- 2. a) sone.
t) Monitor dieset temp & tube oil tenp.
EG-08 EG-04 DG-B-1-3 p
ANY SWITCH
- 1. a) Any of a number of switches eot in auto position,
- 1. a) Control board start mode eclect switch WOT tW AUiG 4:e note DG-6 1-4.
in manual. Dieset will'not auto stert.
EG-18 POSITICN
- 2. a) None.
All other switches wilt give only 4 term.
DG 8-1-4
- 2. a) Ptece switch in proper position.
a AR-902 Rev. 5 Page 2
ym
- .'9-(p ; *-
T_
g
-- rig.
\\
ENCLOTUhf 1
~
(P, age 2 of 6)
ANNUNCIATOR' PANEL LOCAfl0W DG-B ANNUNCIATOR PANEL DG-9 YEATICAL COLUMN 2
. WINDOW TITLE L1. ElkDICATED-C6NDITION 1.
Auto ACTICE SETPOINT.SEN$1NG REFERENCE 2,
C047ROL ROOM 12DICATIGN WHICH VERIFY OR 2.
OPERATOR ACTION J VALID ALARM ELEMENT PIkPolki TROUBLE NUMBER &
LOCATIOM ENGINE"
- 1. a) Dieset trip.
OVERsPEED 2c a) Emergency dieset; generator trip.
- 2. a) Infores Maintenance Department of over-1030 RPM EOR EG.18
. ALARM, speed trip.
EG-02
. b) When reason for trip is corrected DG-8-2-1 restart diesel-.
FUEL Olt
- 1. a) Fuet.oit press f,10 psi.
1 m) Starts DC fuel oli aux. pump..
P2ESS
- 2. a) Ncne.
- 2. a) Che:k fuet oil day tank levet.
10 ost DF-16-PS EG-18 Low ALARM c) Check fuel oil system for leaks.
EG-08 c) Investigste possible trip of fuel oil DG-8 2-2 pump.
JACKEY
- 1. a) Level fatts to.14 gats (3") in the cootant
- 1. a) None.
COOLANT expansion tank.
- 2. a) Add water to tne jacket coolant systers.
14 gals DJ-14-LS EG-18 LEVE8 ALARM
- 2. a) kone.
b) Investigate fcr any teskage.
EG-08 DG 8-2-3
'NG FIELD
- 1. a ) 3210 closed and toss of excitation relay actuated. 1. a) Dieset generator trips and 321J opens.
- 2. a) 3210 opens.
- 2. a) Energize bus from atternate source.
40-DG-36 EG-18 b) Diesel generator trips.
b) Inform electrica! supervicor of field i
loss.
DG-B 2-4
___1__.-
F i
AR-902 Rev. 5 Page 3
l
- x. <
e 6-ENCLOSU5E i (Page.3 of.6);
-j ANNONCI ATOR ' FAniEL LOCATION E OG-3' ANNUNCIATOR PANEL DG;8 VERitCAL COLUMN 3
+
Wihl00W IITLE.
16 INDICATED CONDIT10ai.
2.
OPERATOR ACTION-- VALID ALAaM
-ELEMENT-1.
-AUTO ACTION.'.
$ETPolNT SENSING REFEREkCE.
' 2.
CONTROL kUOM INDICAilON VMICF. VERIFY DR-Pl> POINT TROUBLE' NUMBER & -
LOCATION p '%.
.~
j- -LUBE OIL 1.'a) Dieset greater than 810 aPM'or coolant' press 1.'a) Olesel shutdown.
' PRESS greater thaA 14 psi..and no shutdemn signal.
- 2. a) Check tube ott levet reservoir and 6 psi EG 15-sELOW ALARM present'& LO press < 16 psi.
b) Inform Maintenance.
EG-04 pumps.-
16 pst E3-02 b) Lo press < 6 psi with gav velve not at high timit and speed > 250 RPM for 20 sec.
'EG-10 i
0C-8 3-1
- 2. a) Dieset shytdown.
l TUEL O!L
- 1. a)' Low level alarm in day' tank at 24".from the top.
- 1. a) None.
LEVEL
- 2. a) konC 2.'a) Insure fue! oil tre..sfer takes place 24" DF-4-LS EG-18' at 28" from top of day tank.
OF-02
'DG-E 3-2 W1 JACKET 1 a) Jacket'ccotant return temp > 190*F,
- 1. a) None.
I COOLAki TEMP
- 2. a) None,
- 2. 4) Check coolant espansion tank levet.
195'F Ob8 TS -
E3-13 i
- HIGH ALARM-b) If necessary. start standby cootant EG-08 pump.
c) Prepare to shut down dieset it coolant Iemp increases.
l I
DC-8 3-3' d) Reduce. toad on generator.
. FIELD
- 1. a) Ground protect relay actuates.
- 1. a) 3?10 opens.
Grout:0
- 2. a) 3210 opens loss of ES 4160_39 bus.
- 2. a) Re energize Es 4160 38 fan from 54 DF-3B EG-18 alts rnate sow b) Infore electrical supervisor of DG-8 3-4 condition.
4 x
?
i l
6 l
- ')
AR-902 Rev.-S Page 4
- ~
- 47
.A.
Y:
/
.v s.
ENCLOst et 1
-(Page 4.of 6.)f
.ANNONCIATOR PANEL' LOCATION
'AKkUNCIATOR PAEEL
'DG-B VERTICAL COLUMN 4
DG-B WINDOW' TITLE
'TJ INDICATED CONDilloWl 1.
AUTO ACTION' SETPOINT SENSING' RETERENCE-
- 2...CONTROLeRGOM INDICATICM 6JHICE VERIFY OR 2.
ODERATOR ACit0N - VALi ALARM ELEMENT PihPOINT' TROUBLE NUMBER A i
l
. LOCATION JLusE cil
- 1. e) Luce oft temp i 110't'
' 'e) None.
IfMP LOW b) Jacketwater temp 3115'F.
2.'a) Ensure jacket heater'is on.
110"F DL-12-15 EG-18 l
. 2. a) None.
. b) Ensure tube ott system is in rectre.
115'F DJ-29-Ts EG-CS
' ALARM i
l~
c) Perform appticable steps 0P-707 to
', 4 -
ensure tube' oil has not collected in DG-E-4-1 opper pistons.
i
. FUEL OIL
- 1. al High level alare in day tank at 13.5" from the
- 1. a) $ tops DC f uet ot t transf er pump.
LEVEL HICP top.
b) If AC f uet oil transf er pump rur.ning, 13.5" DF-4-LS EG-18 l
ALARM
- 2. a) None.
it witt stop.
Df-02
,p
- 2. a) Insure fuel oft transfer pumps are off.
DG-8-4 2 t
' START MAIN
- 1. a) Alarm is received when the air shutoff watve is
- 1. a) None.
AIR VALVE oi not in the'futt'open position.
- 2. a) Place air shutoff valve in full open EGV-39-KS EG-18 s
FifLL OPEN 2..a) None.
position to 6iear the alare.
EG-F F
- 1. a) Tripping of the stator temp relay.
- 1. a ) N one.
TEMP HjGH
- 2. a) High toad on generator.
- 2. a) Reduce load on generator.
49xDG 3B FG-18
-DG-B-4-4 i
i i
a AR-902 Rev. 5 Page 5 4
4 y
m
d s
O-FNCtOFJRE 1 (Page 5 of 6)
ANNL*N;t A104 PANEL LOCATION 00-9 ANNUNCIATOR PANEL OG-8 VERTICAL CotuwN 5
WINDOW TITLE 1.
INDICATED CONDifl0N 1.
AUTO ACTich SETPOINI SENSING REFERENCE 2.
CONTROL RDOM IkDlCATICN Wi!CH VERIFY OR 2.
OFEaATOR r.Cil0N - VALID AttRM ELEMENT NUMBER &
FINPClNi IROUBLE LOCATION l
LU9E olt
- 1. a) Sva9 levet < 9 3/16" belos towest point of tomest
- 1. a) None.
LEVES LCU connaction rod.
- 2. a) Check sump tevet and add oil as needed.
9 3/16" DL-20-LS
'EG-18 b) Investigate for tube cil teaks.
EG-08 ALARM
- 2. a) Nene, i
I r
l DG-8-5-1 L.
DC FUEL Clt.
- 1. a) Anytime DC fuel oft transfer pump is running.
8 a) None.
TRAN!fER PP
- 2. a) Fuel oil levet low alarm.
a) Check for proper operation of the AC 42 M3 EG-18 OF-02 fue" oil transfer pump.
OPERATf45 b) Insure proper operation of DC fuet ott DG-B 5-2 j
transfer pump.
~ 1. a) None.
START AIR
- 1. a) Alerms at 6 tank press of 275 PSIG'and resets at
- 2. a n Sec k for air leaks.
225 PSIG EG-12-PS EC-18 b) Cross tre DG air system A & 8 until 245 PSIG EL-CS ALARM
- 2. a) None, f aulty coepressor is repaired.
DG B 5-3 DG-B-5-4 g
_+
__~._________
_ ____ y.
AR-902 Rev. 5 Page 6
.s
- ) -
NOTES
- V}
(
PANEL
- LOCATION i
DGB-1-4; -1.a) 3B diesel local control switch " normal-at engine" in "at engine" position, b) 3B diesel " jacket coolant pump" control switch in "off" or
" manual" position.
c) 38 diesel jacket. coolant heater selector switch in "off"
- position, d) 3B diesel " standby circ _ pump" (lube oil)_ control switch in the
" manual" or "off" position.
_e) 3B diesel "DC fuel oil aux. pump" 3B contrcl switch in "off" or " manual" position, f) 3B diesel "0C: fuel oil transfer pump" 3B control switch'in yi "off" or " manual" position.
g) 30 diesel AC fuel oil transfer pump" 38-control switch in "off" Lor " manual" position.
h)_ 3B. diesel "AC air compressor motor" control switch in the
- "of f" or. " manual" position.
't) 3B diesel " auto-manual" selector switch in the control room is in:the " manual" position.
(
L h-
AR-902
Rev. 5-Page 7 (LAST PAGE)
L
7 5
DOCU?aH 1RA!6MITTAL FORM 78509 FOR DOCUPSJ13 TRANSM11TED TO DC DESK (NRCH-DATE: PC AUG 1992 D A TCH 100 DOC UMEN T NU MDE R EHEET NUM5EP REVISION NUMBER COPY NUMBER AR t'01 05 24 AR SOT 03 24 INSTRUCTIONS TO T HE ADJRESSEE CGMPLE TE E ACH OF THE I NSTR UCT I ON5 DELOW WHICH ARE MARKCD WITH AN X
_X _ (1) VE R IFY THE DOC UMEN TS R ECEI VED AGREE WI TH THE ACOVE DESCRIPTION J i (2) IN00RPORATE TF.E TR ANSMI TTED DOCUMENTS INTO YOUN FILES
,X_ (3) DEUTROY DOCUMENTS OR PORTIONS OF D OCUMENT S SUPERSEDED BY THE ABOVE
_,X _, ( 4 7 SION AND DATE IN T HE SPACES BELOW INDICATING THAT YOU COMPLETED THEOE I NST R UC T I ONS,
__ _ (0) SIGN.DELOW INDICATINO THAT YOU HAVE RE/sD AND UNDERSTROD THE CHAtEES AB IDE NTIF IED RETURN CONTROL, CRYSTAL R I VER UNIT 3,
MAC#
NA1C
~X
'(6 )
NR2A2i(.iG DOCUMENT EAI G _ _
FLORIDA "OWER CORP., P 01 D O)r 219 CRYS T AL R IVER FLA.
34423-0215 (7) 00 ALI T ' PR OGR A MS P ER$ONNEL HAVE HE AD AND UNDERSTOOD THE CHANCEF TO T !E AFf'ECTE D OA P 5 i
SI GNAT URE. OF ADDRESSEE DATE
- _.. _.. _.. _. _. _. _ _ _. ~ _ _
INDEPENDENT VERIrICATION DATE (OP S )
020 % 2 gg i,
.