Forwards Safety Evaluation Providing Basis for Conclusion That Plant Can Be Safely Operated for at Least One Addl Fuel Cycle,Per NRC Re Insp of 38 Welds in RCS Piping
ML20127C783
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 06/06/1985
From: Vassallo D
Office of Nuclear Reactor Regulation
To: Brons J
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
Shared Package
ML20127C785 List:
References
NUDOCS 8506240007
Download: ML20127C783 (2)


Text

f

'~ June 6,1985 DISTRIBUTION Docket File.

Docket No. 50-333 NRC PDR Local PDR ORB #2 Reading HThompson OELD Mr. John C. Brons SNorris Senior Vice President - HAbelson Nuclear Generation ELJordan Power Authority of the State JPartlow of New York BGrimes 123 Main Street ACRS (10)

White Plains, New York 10601 Gray File WKoo

Dear Mr. Brons:

SUBJECT:

IGSCC IN STAINLESS STEEL PIPING Re: James A. FitzPatrick Nuclear Power Plant Our letter of May 24, 1985 provided the conclusions of a staff review of the information you submitted concerning inspection of 38 welds in the reactor coolant system piping at the FitzPatrick plant and the repair of one weld during the recent refueling outage. In our letter, we stated our conclusion that the plant can be safely operated for at least one additional fuel cycle. Enclosed is our Safety Evaluation which provides the basis for that conclusion.

Our letter also requested that your plans for inspection and/or modification of the reactor coolant pressure boundary piping systems during the next refueling outage be submitted at least three months prior..to.the start of that outage.

Sincerely, Original signed by/

B506240007 DR 850606 Domenic B. Vassallo,. Chief a ADOCK0500g3 Operating Reactors Branch #2 Division of Licensing

Enclosure:

As stated cc w/ enclosure:

See next page DL:0,R6#2 y 0 D :0RB#2 SNo b s:ajs H ~ 'on DVassallo 06/.5/85 06/5 /85 06//,/85

Mr. John C. Brons James A. FitzPatrick Nuclear Power Authority of the State of New York Power Plant i cc:

Mr. Charles M. Pratt Mr. Jay Dunkleberger Assistan'. General Counsel Division of Policy Analysis Power Aut.hority of the State and Planning of New York New York State Energy Office 10 Columbus Circle Agency Building 2 New York, New York 10019 Empire State Plaza Albany, New York 12223 Resident Inspector's Office Thomas A. Murley U. S. Nuclear Regulatory Commission Regional Administrator Post Office Box 136 Region I Office Lycoming, New York 13093 U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 Mr. A. Klausman Mr. Harold Glovier Vice President - Quality Assurance Resident Manager Power Authority of the State James A. FitzPatrick Nuclear of New York Power Plant 10 Columbus Circle Post Office Box 41 New York, New York 10019 Ly. coming, New York 13093 Mr. J. A. Gray, Jr. Mr. George Wilverding, Chairman Director - Nuclear Licensing - BWR Safety Review Committee Power Authority of the State Power Authority of the State of New York of New York 123 Main Street 123 Main Street White Plains, New York 10601 White Plains, New York 10601

~

Mr. Robert P. Jones, Supervisor Town of Scriba R. D. #4 Oswego, New York 13126 Mr. Leroy W. Sinclair Power Authority of the State of New York 10 Columbus Circle New York, New York 10019 Mr. M. C. Cosgrove Quality Assurance Superintendent James A. FitzPatrick Nuclear Power Plant Post Office Box 41 Lycoming, New York 13093

.