Safety Evaluation Supporting Rev 4 to First 10-yr Interval Inservice Insp Program for Facility
ML20127B705
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 01/06/1993
From:
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20127B688 List:
References
NUDOCS 9301130071
Download: ML20127B705 (5)


Text

._

a ENCLOSURE 2

, # %g UNITED STATES l r 'g NUCLEAR REGULATORY COMMISSION

E W ASHINo TON, D. C. 20555

.....f SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION REGARDIG REVISION 4 TO THE FIRST TEN-YEAR INTERVAL INSERVICE INSPECTION PROGRAM f-Q8 0

10.GTLE ELECTRIC GENERATING PLANT. U. NIT NO. 2 DOCKET NUMBER 50-425

1.0 INTRODUCTION

Technical Specification 4.0.5 for Vogtle Electric Generating Plant, Unit 2, states that the inservice inspection and testing of the American Society of Mechanical Engineers (ASME) Code Class 1, 2, and 3 components shall be performed in accordance with Section XI of the ASME Boiler and Pressure Vessel Code and applicable Addenda as required by 10 CFR 50.55a(g), except where specific written relief has been granted by the Commission pursuant to 10 CFR 50.55a(g)(6)(1). Under 10 CFR 50.55a(a)(3), alternatives to the requirements of paragraph (g) may be used, when authorized by the NRC, if (i) the proposed alternatives would provide an acceptable level of c,uality and safety, or (ii) compliance with the specified requirements would result in hardship or unusual difficulties without a compensating increase in the level of quality and safety.

Pursuant to 10 CFR 50.55a(g)(4), ASME Code Class 1, 2, and 3 components (including supports) shall meet the requirements, except the design and access provisions and the preservice examination requirements, set forth in the ASME Code,Section XI, " Rules for Inservice Inspection of Nuclear Power Plant Components," to the extent practical within the limitations of design, geometry, and materials of construction of the components. The regulations require that inservice examination of components and systea pressure tests conducted durin3 the first ten-year interval comply with the requirements in the latest edition and addenda of Section XI of the ASME Code incorporated by reference in 10 CFR 50.55a(b) on the date 12 months prior to the issuance of the operating license, subject to the limitations and modifications listed therein. The applicable edition of Section XI of the ASME Code for the Vogtle Electric Generating Plant, Unit 2, first 10-year ISI interval is the 1983 Edition through Summer 1983 Addenda. The components (including supports) may meet the requirements set forth in subsequent editions and addenda of the. ASME Code incorporated by reference in 10 CFR 50.55a(b) subject to the limitations and modifications listed therein. The first interval for Vogtle Unit 2 began May 20, 1989, and ends May 19, 1999.

PJrsuant to 10 CFR 50.55a(g)(5), if a licensee determines that conformance with an examination requirement of Section XI of the ASME Code is not practical for its facility, information shall be submitted to the Commission 9301130071 93o106 PDR ADOCK 05000424 p PDR

t_

4 in support of that determination and a request made for relief from the ASME Code requirement. After evaluation of_the determination, pursuant to-10 CFR 50.55a(g)(6)(1), the Commission may grant relief and may impose alternative requirements that are determined to be authorized by law, will not endanger life, property, or the common defense and security, and are otherwise in the public interest, giving due consideration to the burden upon the licensee that could result if the requirements were imposed.

The licensee, Georgia Power Company, has submitted Revision 4 to the Vogtle Electric Generating Plant, Unit 2, First 10-Year Interval ISI Program in a letter dated October 2, 1991. The NRC staff has previously evaluated and accepted Revision 3 of the program as indicated in a Safety Evaluation Report (SER) dated December 17, 1991. Therefore, this review now evaluates the changes in Revision 4 of the program.

The NRC staff has evaluated the Vogtle Electric Generating Plant, Unit 2, First 10-Year Interval ISI Program, Revision 4, with technical assistance from its contractor, the Idaho National Engineering Laboratory.

2.0 EVALVATION Most of the changes to the ISI Program found in Revision 4 consist of editcMal and typographical corrections to text. The remaining changes apply to specific requests for relief.

A. Reauest for RR-21. Examination Cateoory B-J. Class 1 Branch Connection Welds 4 Inch and Larcer Nominal Pipe Size In its SER of December 17, 1991, and accompanying Technical Evaluation Report (TER at Section 3.1.4.2), the NRC staff granted RR-21 which had requested relief from examining 100% of the Code-required volume of eleven specific Class 1 branch pipe connection welds._ The licensee revised RR-21 in Revision 4 to reflect the actual examination volumes completed and the receipt of new calibration blocks. Re aew of the

" set-in" and " set-on" designs shows that the branch connections cannot be examined to the extent required-by the Code. The licensee has committed to perform the volumetric examinations to the maximum extent _ .

practical, in addition to performing the Code-required surface examinations.

The NRC staff finds that these examinations will provide reasonable assurance of the continued inservice structural integrity of the branch connection welds. Moreover,'the NRC staff's previous basis for granting

, this relief' request remains valid as reported December 17, 1991, and the request, as modified, is grar.ted in accordance with 10 CFR 50.55a(g)(6)(i).

t l B. RR-26. Examination Cateoories B-J and C-F. Pressure Retainino Welds in Class 1 and 2 Pining In its SER of December 17, 1991, the NRC staff accepted RR-26 which requested relief from examining 100% of the Code-required volume of certain welds (see Sections 3.1.4.1 and 3.2.2.1 of the accompanying TER for Unit 2). The changes to RR-26, as modified by Revision 4, are of an editorial nature and do not change the technical content. Therefore, the NRC staff's previous basis for granting this relief remains valid, and the request, as modified, is granted in accordance with 50.55a(g)(6)(i).

C. RR-52. Examination Cateaory B-H. Reactor Pressure Vessel Intearally Welded Attachment 1 In its SER of December 17, 1991, and accompanying TER, Section 3.1.1.6, the NRC staff granted RR-52 which requested relief from examining 100%

of the Code-reonired area of certain integrally welded attachments. RR-52 was revised 9evision 4 to correct a typographical error.

The correction does not affect the basis for the NRC staff's previous acceptance. Therefore, the relief request, as corrected in Revision 4, is granted in accordance with 10 CFR 50.55a(g)(6)(i).

3.0 CONCLUSION

Most of the changes in Revision 4 of the ISl Program for Vogtle Electric Generating Plant, Unit 2, are editorial in nature. Spacific relief requests were updated to reflect actual plant conditions. The changes to the relief requests do not affect our previous determination that imposing the applicable provisions of Section XI of the ASME Code would be impractical. Therefore, these relief requests, as modified, are granted in accordance with 10 CFR -

50.5Sa(g)(6). According,y, the NRC staff has determined that the Vogtle Electric Generating Plant, Unit 2, First 10-Year Interval ISI Program, through Revision 4, reflects compliance with 10 CFR 50.55a(g) and Technical Specification 4.0.5 and, therefore, continues to be acceptable.

Date: January 6, 1993

-