ML20127A944

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-213/85-07 on 850307-0509.No Violation Noted.Appointment of Single Point of Contact at Site to Coordinate Submittals Requested
ML20127A944
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 06/14/1985
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Opeka J
CONNECTICUT YANKEE ATOMIC POWER CO.
Shared Package
ML20127A947 List:
References
NUDOCS 8506210300
Download: ML20127A944 (2)


See also: IR 05000213/1985007

Text

r

  • E

.

JUN 141985

Docket / License: 50-213/DPR-61

Connecticut Yankee Atomic Power Company

ATTN: Mr. J. F. Opeka

Senior Vice President - Nuclear

Engineering and Operations

P. O. Box 270

Hartford, Connecticut 06101

Gentlemen:

Subject: Resident Inspection 50-213/85-07

This transmits the findings of the routine NRC inspection of the Haddam Neck Plant

on March 7 - May 9, 1985. These findings have been discussed with Mr. R. Graves

of your staff.

No violations were identified during this inspection and no reply to this letter

is required.

Thank you for informing us of the corrrective and preventive actions documented

in your letter to NRC Region I dated March 18, 1985. Those actions pertained to

Inspection 84-32, which was forwarded to you by our letter dated February 11, 1985.

Based on discussions between Mr. P. Swetland and Mr. R. Graves, we understand that

additional measures are planned to improve the coordination and technical review

of submittals to NRC. These measures include the appointment of a single point

of contact at the site (with backup) to coordinate the accuracy and timeliness of

submittals, and provision of more time for both site and corporate review of draft

submittals. Please notify us promptly if our understanding of your further actions

is not correct.

Your cooperation with us is appreciated.

Sincerely,

,4181aal Signed Bp

Edward C. Wenzinger, Chief

Projects Branch No. 3

Division of Reactor Projects

Enclosure: NRC Inspection Report 50-213/85-07

8506210300 850614

PDR ADOCK 05000213

0 PDR gg

. .

  • '

Connecticut Yankee Atomic Power Company 2

gg3 y 41985

cc w/ encl:

R. Graves, Plant Superintendent

D. O. Nordquist, Manager of Quality Assurance

R. T. Laudenat, Manager, Generation Facilities Licensing

E. J. Mroczka, Vice President, Nuclear Operations

Gerald Garfield, Esquire

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of Connecticut

bcc w/ enc 1:

Region I Docket Room (with concurrences)

Senior Operations Officer (w/o enc 1)

Section Chief, DRP

RP RP R P

2Re ,... &RI

st22/8s </r,pc ?h"ff

o I

0FFICIAL RECORD COPY