ML20127A867

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-352/85-16 & 50-353/85-04 on 850316-0430 & Notice of Violation
ML20127A867
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 06/17/1985
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Daltroff S
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20127A870 List:
References
CON-#385-542 NUDOCS 8506210280
Download: ML20127A867 (2)


See also: IR 05000316/2004030

Text

.

JUN 171985

Docket Nos. 50-352

50-353

Philadelphia Electric Company

ATTN: Mr. Shields L. Daltroff

Vice President

Electric Production

2301 Market Street

Philadelphia, Pa. 19101

Gentlemen:

Subject: Combined Inspection 50-352/85-16; 50-353/85-04

This refers to the routine resident safety inspection by Mr. J. T. Wiggins on

March 16 - April 30, 1985 at the Limerick Generating Station, Limerick,

Pennsylvania. The inspection consisted of document reviews, interviews, and

observation of activities, and the results have been discussed with Messrs. G.

M. Leitch and J. M. Corcoran of your staff.

An apparent violation of NRC requirements is cited in Appendix A and

categorized under the NRC Enforcement Policy, 10 CFR 2 Appendix C (49 FR 8583)

March 8, 1984. A reply is required and should be prepared in accordance with

Appendix A.

In our January 11, 1985 letter, we expressed a concern regarding a trend in

personnel-related operating and testing errors which appeared to be developing.

Subsequently, as a result of this concern, we met with you and members of your

staff on February 22, 1985 and reviewed the report on this matter that you

provided us in a letter dated April 2, 1985. Based on the information provided

at the meeting and in your report, and upon the results of our inspections at

the Limerick facility, we have concluded that the corrective actions imple-

mented in response to our concern were appropriate. Further, we have noted

l that these actions appear to have been effective in decreasing the frequency of

l

personnel-error related events. We will continue to monitor this area to

.

verify your continued progress in improving the facility's operating per-

! formance. -

Your reply to Appendix A is exempt from the Office of Management and Budget's

clearance procedures under the Paperwork Reduction Act of 1980, PL 96-511.

I

!

0FFICIAL RECORD COPY LIMERICK-15/04 - 0001.0.0

'

05/28/85

8506210200 850617 '

PDR

G

ADOCK 05000352

PDR

ih()\

1 1

( l

,-

.

Philadelphia Electric Company 2

Your cooperation is appreciated.

Sincerely,

M41ami shoec ay

Samuel J. Collins, Chief

Projects Branch 2, Division of

Reactor Projects

Enclosure: NRC Region Combined Report

No. 50-352/85-16; 50-353/85-04

cc w/ enc 1:

V. S. Boyer, Senior Vice President, Nuclear Power

John S. Kemper, Vice President, Engineering and Research

G. M. Leitch, Station Superintendent

Troy B. Conner, Jr. , Esq.

Eugene J. Bradley, Esq., Assistant General Counsel

Limerick Hearing Service List

Public Document Room (POR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Pennsylvania

bec w/ enc 1:

Region I Docket Room (with concurrences)

Sr. Operations Officer (w/o enc 1)

DRP Section Chief

R. Bellamy, DRSS

J. Durr, DRS

L. Bettenhausen, DRS

(# $d h

I:DRF DR /

3eall/jm Col ns

jAle/<

OFFICIAL RECORD COPY LIMERICK-15/04 - 0002.0.0

05/28/85

_