e~
.
Appendix A
Philadelphia Electric Company
Docket No. 50-352
Limerick Generating Station, Unit 1
License No. NPF-27
As a result of the inspection conducted on March 16 - April 30,1985, and in
accordance with the NRC Enforcement Policy (10 CFR 2, Appendix C) publisi.ed in
the Federal Register (49 FR 8583) dated March 8,1984, the following violation
was identified:
Technical Specification 6.8.1 requires that plant administrative procedures
be maintained including those procedures governing the review of safety-
related procedures by the Plant Operations Review Committee (PORC).
Administrative Procedure A-4 implements the licensee's program for the
review of procedures by PORC. A-4 includes an option for the use of a
PORC. Subcommittee to conduct the review provided the PORC Subcommittee
Chairman has determined that an adequate cross-discipline review capabi-
lity for the specific procedure is present within the Subcommittee.
Contrary to the above, an adequate cross-discipline review capability did
not exist in the PORC Subcommittee convened to review revision 2 to ST-5-
048-800-1, "SBLC Sodium Pentaborate Concentration Analysis," in that the
Subcommittee was comprised of chemistry department personnel without input
from any other plant staff organization. Subsequently, the procedure was
determined to be inadequate because it did not consider the effect of the
low tank water level pump trip setpoint in determining the total available
volume in the standby liquid content tank.
This is a Severity Level IV violation (Supplement I).
Pursuant to the provisions of 10 CFR 2.201, Philadelphia Electric Company is
hereby required to submit to this office within thirty days of the date of the
letter which transmitted this Notice, a written statement or explanation in
reply, including:
(1) the corrective steps which have been taken and the
results achieved; (2) corrective steps which will be taken to avoid further
violations; and (3) the date when full compliance will be achieved. Where good
cause is shown, consideration will be give to extending this response time.
i
,
8506210282 850617
.
ADOCK 05000352
l
0
PN
1
.-.
-
-
-
-.
_
_
-.
7_
-
Operations
50-352
24
Limerick Hearing Service List
Judge Helen F. Hoyt
Mr. Marvin I. Lewis
Atomic Safety and Licensing
6504 Bradford Terrace
Board
Philadelphia, PA 19149
U.S. Nuclear Regulatory
Commission
Washington, D.C.
20555
Judge Richard F. Cole
Phyllis Zitner
Atomic Safety and Licensing
LEA
Board
P. O. Box 761
U.S. Nuclear Regulatory
Pottstown, PA 19464
Commission
Washington, D.C.
20555
Judge Jerry Harbour
Docketing and Service Station
Atomic Safety and Licensing
Office of the Secretary
Board
U.S. Nuclear Regulatory Commission
U.S. Nuclear Regulatory
Washington, D.C.
20555
Commission
Washington, D.C.
20555
Mr. Frank R. Romano
Counsel for NRC Staff
61 Forest Avenue
Office of the Executive Legal Director
Ambler, Pennsylvania
19002
U. S. Nuclear Regulatory Commission
Washington, D.C.
20555
Mr. Robert L. Anthony
Philadelphia Electric Company
P. O. Box 186
ATTN:
Edward G. Bauer, Jr.
103 Vernon Lane
Vice President and
Moylan, Pennsylvania 19065
General Counsel
2301 Market Street
Philadelphia, PA 19101
David Wersan, Esq.
Charles W. Elliott, Esquire
Assistant Consumer Advocate
Brose and Postwistilo
Office of Consumer Advocate
1101 Building
1425 Strawberry Square
lith and Northampton Streets
Harrisburg, PA 17120
Easton, PA 18042
Steven P. Hershey, Esquire
Zori G. Ferkin
Community Legal Services, Inc.
Governor's Energy Council
Law Center West
P. O. Box 8010
5219 Chestnut Street
Harrisburg, PA 17105
Philadelphia, PA 19139
Martha W. Bush, Esquire
Troy B. Conner, Jr. , Esquire
Kathryn S. Lewis, Esquire
Mark J. Wetterhahn, Esquire
Municipal Services Bldg.
Conner & Wetterhahn
15th and JFK Blvd.
1747 Pennsylvania Avenue
Philadelphia, PA 19107
Washington, D. C.
20006
I
i
.-.
G
.
Operations
50-352
24
Angus Love, Esquire
Robert J. Sugarman, Esq.
101 East Main Street
Sugarman, Denworth & Hellegers
Norristown, PA 19401
16th Floor Center Plaza
101 North Broad Street
Philadelphia, PA 19107
Spence W. Perry, Esquire
Mr. Joseph H. White, III
Associate General Counsel
15 Ardmore Avenue
Federal Emergency Management Agency
Ardmore, PA 19003
500 C Street, S.W. Room 840
Washington, DC 20472
Thomas Y. Au, Esquire
Assistant Counsel
Commonwealth of Pennsylvania
DER
505 Executive House
P. O. Box 2357
Harrisburg, PA 17120
Thomas Gerusky, Director
Bureau of Radiation Protection
Department of Environmental
Resources
5th Floor, Fulton Bank Bldg.
Third and Locust Streets
Harrisburg, PA 17120
i
!
l
1
!
!
!
<
.
Appendix A
Philadelphia Electric Company
Docket No. 50-352
Limerick Generating Station, Unit 1
License No. NPF-27
As a result of the inspection conducted on March 16 - April 30, 1985, and in
accordance with the NRC Enforcement Policy (10 CFR 2, Appendix C) published in
the Federal Register (49 FR 8583) dated March 8,1984, the following violation
was identified:
Technical Specification 6.8.1 requires that plant administrative procedures
be maintained including those procedures governing the review of safety-
related procedures by the Plant Operations Review Committee (PORC).
Administrative Procedure A-4 implements the licensee's program for the
review of procedures by PORC. A-4 includes an option for the use of a
PORC Subcommittee to conduct the review provided the PORC Subcommittee
Chairman has determined that an adequate cross-discipline review capabi-
lity for the specific procedure is present within the Subcommittee.
Contrary to the above, an adequate cross-discipline review capability did
not exist in the PORC Subcommittee convened to review revision 2 to ST-5-
048-800-1, "SBLC Sodium Pentaborate Concentration Analysis," in that the
Subcommittee was comprised of chemistry department personnel without input
from any other plant staff organization.
Subsequently, the procedure was
determined to be inadequate because it did not consider the effect of the
low tank water level pump trip setpoint in determining the total available
volume in the standby liquid content tank.
This is a Severity Level IV violation (Supplement I).
Pursuant to the provisions of 10 CFR 2.201, Philadelphia Electric Company is
hereby required to submit to this office within thirty days of the date of the
letter which transmitted this Notice, a written statement or explanation in
reply, including: (1) the corrective steps which have been taken and the
results achieved; (2) corrective steps which will be taken to avoid further
violations; and (3) the date when full compliance will be achieved. Where good
cause is shown, consideration will be give to extending this response time.