Notice of Violation from Insp on 850316-0430
ML20127A876
Person / Time
Site: Limerick Constellation icon.png
Issue date: 06/17/1985
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20127A870 List:
References
50-352-85-16, NUDOCS 8506210282
Download: ML20127A876 (4)


See also: IR 05000316/2004030

Text

e~

.

Appendix A

Notice of Violation

Philadelphia Electric Company Docket No. 50-352

Limerick Generating Station, Unit 1 License No. NPF-27

As a result of the inspection conducted on March 16 - April 30,1985, and in

accordance with the NRC Enforcement Policy (10 CFR 2, Appendix C) publisi.ed in

the Federal Register (49 FR 8583) dated March 8,1984, the following violation

was identified:

Technical Specification 6.8.1 requires that plant administrative procedures

be maintained including those procedures governing the review of safety-

related procedures by the Plant Operations Review Committee (PORC).

Administrative Procedure A-4 implements the licensee's program for the

review of procedures by PORC. A-4 includes an option for the use of a

PORC. Subcommittee to conduct the review provided the PORC Subcommittee

Chairman has determined that an adequate cross-discipline review capabi-

lity for the specific procedure is present within the Subcommittee.

Contrary to the above, an adequate cross-discipline review capability did

not exist in the PORC Subcommittee convened to review revision 2 to ST-5-

048-800-1, "SBLC Sodium Pentaborate Concentration Analysis," in that the

Subcommittee was comprised of chemistry department personnel without input

from any other plant staff organization. Subsequently, the procedure was

determined to be inadequate because it did not consider the effect of the

low tank water level pump trip setpoint in determining the total available

volume in the standby liquid content tank.

This is a Severity Level IV violation (Supplement I).

Pursuant to the provisions of 10 CFR 2.201, Philadelphia Electric Company is

hereby required to submit to this office within thirty days of the date of the

letter which transmitted this Notice, a written statement or explanation in

reply, including: (1) the corrective steps which have been taken and the

results achieved; (2) corrective steps which will be taken to avoid further

violations; and (3) the date when full compliance will be achieved. Where good

cause is shown, consideration will be give to extending this response time.

i

,

8506210282 850617

.

PDR ADOCK 05000352

l 0 PN

1

.-. - - - -. _ _ -.

7_

-

Operations

50-352 24

Limerick Hearing Service List

Judge Helen F. Hoyt Mr. Marvin I. Lewis

Atomic Safety and Licensing 6504 Bradford Terrace

Board Philadelphia, PA 19149

U.S. Nuclear Regulatory

Commission

Washington, D.C. 20555

Judge Richard F. Cole Phyllis Zitner

Atomic Safety and Licensing LEA

Board P. O. Box 761

U.S. Nuclear Regulatory Pottstown, PA 19464

Commission

Washington, D.C. 20555

Judge Jerry Harbour Docketing and Service Station

Atomic Safety and Licensing Office of the Secretary

Board U.S. Nuclear Regulatory Commission

U.S. Nuclear Regulatory Washington, D.C. 20555

Commission

Washington, D.C. 20555

Mr. Frank R. Romano Counsel for NRC Staff

61 Forest Avenue Office of the Executive Legal Director

Ambler, Pennsylvania 19002 U. S. Nuclear Regulatory Commission

Washington, D.C. 20555

Mr. Robert L. Anthony Philadelphia Electric Company

P. O. Box 186 ATTN: Edward G. Bauer, Jr.

103 Vernon Lane Vice President and

Moylan, Pennsylvania 19065 General Counsel

2301 Market Street

Philadelphia, PA 19101

David Wersan, Esq. Charles W. Elliott, Esquire

Assistant Consumer Advocate Brose and Postwistilo

Office of Consumer Advocate 1101 Building

1425 Strawberry Square lith and Northampton Streets

Harrisburg, PA 17120 Easton, PA 18042

Steven P. Hershey, Esquire Zori G. Ferkin

Community Legal Services, Inc. Governor's Energy Council

Law Center West P. O. Box 8010

5219 Chestnut Street Harrisburg, PA 17105

Philadelphia, PA 19139

Martha W. Bush, Esquire Troy B. Conner, Jr. , Esquire

Kathryn S. Lewis, Esquire Mark J. Wetterhahn, Esquire

Municipal Services Bldg. Conner & Wetterhahn

15th and JFK Blvd. 1747 Pennsylvania Avenue

Philadelphia, PA 19107 Washington, D. C. 20006

I

i .-.

G .

Operations

50-352 24

Angus Love, Esquire Robert J. Sugarman, Esq.

101 East Main Street Sugarman, Denworth & Hellegers

Norristown, PA 19401 16th Floor Center Plaza

101 North Broad Street

Philadelphia, PA 19107

Spence W. Perry, Esquire Mr. Joseph H. White, III

Associate General Counsel 15 Ardmore Avenue

Federal Emergency Management Agency Ardmore, PA 19003

500 C Street, S.W. Room 840

Washington, DC 20472

Thomas Y. Au, Esquire

Assistant Counsel

Commonwealth of Pennsylvania

DER

505 Executive House

P. O. Box 2357

Harrisburg, PA 17120

Thomas Gerusky, Director

Bureau of Radiation Protection

Department of Environmental

Resources

5th Floor, Fulton Bank Bldg.

Third and Locust Streets

Harrisburg, PA 17120

i

!

l

1

!

!

!

<

.

Appendix A

Notice of Violation

Philadelphia Electric Company Docket No. 50-352

Limerick Generating Station, Unit 1 License No. NPF-27

As a result of the inspection conducted on March 16 - April 30, 1985, and in

accordance with the NRC Enforcement Policy (10 CFR 2, Appendix C) published in

the Federal Register (49 FR 8583) dated March 8,1984, the following violation

was identified:

Technical Specification 6.8.1 requires that plant administrative procedures

be maintained including those procedures governing the review of safety-

related procedures by the Plant Operations Review Committee (PORC).

Administrative Procedure A-4 implements the licensee's program for the

review of procedures by PORC. A-4 includes an option for the use of a

PORC Subcommittee to conduct the review provided the PORC Subcommittee

Chairman has determined that an adequate cross-discipline review capabi-

lity for the specific procedure is present within the Subcommittee.

Contrary to the above, an adequate cross-discipline review capability did

not exist in the PORC Subcommittee convened to review revision 2 to ST-5-

048-800-1, "SBLC Sodium Pentaborate Concentration Analysis," in that the

Subcommittee was comprised of chemistry department personnel without input

from any other plant staff organization. Subsequently, the procedure was

determined to be inadequate because it did not consider the effect of the

low tank water level pump trip setpoint in determining the total available

volume in the standby liquid content tank.

This is a Severity Level IV violation (Supplement I).

Pursuant to the provisions of 10 CFR 2.201, Philadelphia Electric Company is

hereby required to submit to this office within thirty days of the date of the

letter which transmitted this Notice, a written statement or explanation in

reply, including: (1) the corrective steps which have been taken and the

results achieved; (2) corrective steps which will be taken to avoid further

violations; and (3) the date when full compliance will be achieved. Where good

cause is shown, consideration will be give to extending this response time.

.__

_ _ _