ML20127A345

From kanterella
Jump to navigation Jump to search
Notifies of Flight Cost for Helicopter Needed for 821122 Geologic Observations of Fault Investigation
ML20127A345
Person / Time
Site: 05000000, Vogtle
Issue date: 11/16/1982
From: Rolonda Jackson
Office of Nuclear Reactor Regulation
To: Rebello J
NRC OFFICE OF ADMINISTRATION (ADM)
Shared Package
ML19292B772 List: ... further results
References
FOIA-84-624 NUDOCS 8211180509
Download: ML20127A345 (1)


Text

.

m

~

  1. 'p ne toq'o,,

UNITED STATES h

Jf "g-NUCLEAR REGULATORY COMMISSION r;

j WASHINGTON. D. C. 20555 NOV 16 1982 MEMORANDUM FOR:

-John Rebello Administrative Contracts Branch Division of Contracts FROM: ~

Robert E. Jackson, Chief Geosciences Branch, DE

SUBJECT:

V0GTLE SITE AREA - SHARING OF OPERATIONAL COST OF UTILITY AIRCRAFT-Dr. Ina B. Alterman and Dr. A. K. Ibrahim of the Geosciences Branch will be. visiting the Vogtle Plant area in the vicinity of Augusta, Georgia on November 22 and 23,1982 in order to field check a fault ~ investigation report. Geologic observations using a helicopter owned by Georgia Power Company will be conducted on November 22. NRC will assume its pro-rata share'of the flight cost which is estimated at $250.00 For further'information, contact Mr. James Bailey of Southern Company Services, which manages Georgia Power's nuclear plant licensing. He may be reached at.205-870-6823.

i-Robert E. Ja son, Chief Geosciencis ranch Division Engineering cc:

S. Brocoum I. Alterman A. K. Ibrahim 1

( 8 2-L u 9 oso 9

.