ML20126M370
| ML20126M370 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 05/17/1985 |
| From: | Walker R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Wilgus W FLORIDA POWER CORP. |
| Shared Package | |
| ML20126M374 | List: |
| References | |
| NUDOCS 8506200307 | |
| Download: ML20126M370 (2) | |
See also: IR 05000302/1985015
Text
WellnJ
-
.
May 17, 1985
Florida Power Corporation
ATTN: Mr. W. S. Wilgus
Vice President Nuclear Operations
P. O. Box 14042, M.A.C. H-2
St. Petersburg, FL 33733
Gentlemen:
SUBJECT: REPORT NO. 50-302/85-15
On March 25-29, 1985, NRC inspected a'ctivities authorized by NRC Operating
License No. DPR-72 for your Crystal River facility. At the conclusion of the
inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
The inspection findings indicate that certain activities violated NRC require-
ments. The violations, references to pertinent requirements, and eleme.its to be
included in your response are presented in the enclosed Notice of Violation.
Your attention is invited to the unresolved item identified in the inspection
report. This matter will be pursued during future inspections.
The responses directed by this letter and the enclosures are not subject to the
clearance procedures of the Office of Management and Budget issued under the
Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this letter, please contact us.
Sincerely,
(Original signed by VLBrownlee)
Roger D. Walker, Director
Division of Reactor Projects
l
Enclosures:
(See page 2)
(
8506200307 850517
ADOCK 05000302
G
!
fEOIsy
a
Florida Power Corporation
2
May 17, 1985
Enclosures:
1.
2.
Inspection Report No. 50-302/85-15
cc w/encis:
E. M. Howard, Director
Site Nuclear Operations
P. F. McKee, Nuclear Plant Manager
G. R. Westafer, Manager
Nuclear Operations Licensing
and Fuel Management
bec w/encis:
NRC Resident Inspector
~'
Document Control Desk
State of Florida
l
RII-
RII
RII
,7
RII
R 1
-
RI[
gpfffU
442scl
A ff 4 U T W ()WPBe@ mis
-y
GBelisle:Jw
CUpright
AGibson
\\a iera
VBrownlee
5/2,/85
5/2,/85
'5/2L/85
5/7 /85
5/lo/85
5/gi/85
.I
'l
. . .