ML20126L758
| ML20126L758 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 07/17/1985 |
| From: | Stolz J Office of Nuclear Reactor Regulation |
| To: | Philadelphia Electric Co, Public Service Electric & Gas Co, Delmarva Power & Light Co, Atlantic City Electric Co |
| Shared Package | |
| ML20126L760 | List: |
| References | |
| DPR-44-A-110, DPR-56-A-113 NUDOCS 8508010018 | |
| Download: ML20126L758 (20) | |
Text
4
~
o rre...
+
Og UNITED STATES e
p, NUCLEAR REGULATORY COMMISSION j
WASHINGTON, D. C. 20555 3
o a
s
%,..... /
PHILADELPHIA ELECTRIC COMPANY
"~
PUBLIC SERVICE ELECTRIC AND GAS COMPANY DELMARVA POWER AND LIGHT COMPANY ATLANTIC CITY ELECTRIC COMPANY DOCKET NO. 50-277 PEACH BOTTOM ATOMIC POWER STATION, UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.110 License No. DPR-44 1.
The Nuclear Regulatory Comission (the Comission) has found that:
A.
The application for amendment by Philadelphia Electric Company, et al. (the licensee) dated January 4, 1985, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in confonnity with the application, the provisions of the Act, and the rules and regulations of the Comission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulatiens; D.
The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have i
been satis #ied.
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Oparating License No. DPR-44 is hereby amended to read as follows:
8500010018 850717 PDR ADOCK 05000277 P
PDR~
~
~
. Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No.110, are hereby incorporated in the license. PECO shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of its date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION (3
/
7, obb'F. Stolz, Chief i
0 ' rating Reactors Branch #4~
ivision of Licensing
Attachment:
Changes to the Technical Specifications Date of Issuance: July 17,1985 S
,.-._-4-_
ATTACHMENT TO LICENSE AMENDMENT NO.110 FACILITY OPERATING LICENSE NO. DPR-44 DOCKET NO. 50-277 d
Replace the following pages of the Appendix "A" Technical Specifications with the enclosed pages. The revised pages are identified by Amendment number and contain a vertical line indicating the area of change.
Remove Insert j
7 7
251 251 i
253 253 i
254a 255 j
254b 255 4
- i 256 256 256a l
257 257 260 260 4
)
4 4
4 s
t 4
l j
PBAPS 1.0 DEFINITIONS (Cont'd) e-outage, the required surveillance testing need not be performed until the next regularly scheduled outage.
Reportable Event - A reportable event shall be any of those conditions specified in Section 50.73 to 10 CFR Part 50.
Run Mode - In this mode the reactor system pressure is at or above 850 psig and the reactor protection system is energized with APRM protection (excluding the 15% high flux trip) and RBM interlocks in service.
I Sa fety Limit - The safety limits' are limits below which the reasonable maintenance of the cladding and primary systems are I
assured.
Exceeding such a limit requires unit shutdown and review by the Nuclear Regulatory Commission before resumption of unit operation.
Operation beyond such a limit may not in itself result in serious consequences, but it indicates an operational deficiency subject to regulatory review.
i 1
Secondary Containment Integrity - Secondary Containment integrity l
means that the reactor building is intact and the following conditions are met:
i 1.
At least one door in each access opening is closed.
2.
The standby gas treatment is operable.
3.
All Reactor Building ventilation system automatic isolation valves are operable or deactivated in the isolation position.
Shutdown - The reactor is in a shutdown condition when the reactor mode switch is in the shutdown mode position and no core alterations are being performed.
Shutdown Mode - Placing the pode switch to the shutdown position initiates a reactor scram and power to.the control rod drives is removed.
After a short time period (about 10 sec), the scram signal is removed allowing a scram reset and restoring the normal valve lineup in the control rod drive hydraulic system; also, the l,
mainsteam line isolation scram and main condenser low vacuum scram are bypassed.if reactor vessel pressure is below'1055 psig.
Amendment No. 191, 110,
r PBAPS 6.5.2.7 Continued d.
Proposed changes in Technical Specifications
~
or Licenses.
k Violations of applicable statutes, codes, e.
regulations, orders, Technical Specifications, license requirements, or of internal 4
i.
procedures or instructions having nuclear safety significance.
f.
Significant operating abnormalities or i
deviations from normal and expected performance of plant equipment that affect nuclear safety.
g.
Reportable Event Reports required by 10 CFR 50.73.
h.
Any indication of an unanticipated deficiency in some aspect of design or operation of safety related structures, systems, or components.
i 1
1 1.
Reports and meeting minutes of the Plant Operation Review Committee.
Aud i ts 6.5.2.8 Audits of facility activities shall be performed under the cognizance of the OSR Committee.
These audits shall encompass:
a.
The conformance of facility operation to provisions contained within the Technical Specifications and applicable license i
conditions at least once per year.
r b.
The' performance, training and qualifications of the entire facility staff at least once per j
year.
c.
The results of actions taken to correct' deficiencies occurring in facility equipment, ii structures, systems or method of operation that af'ect nuclear safety at least once per six months.
d.
The performance of activities required by the Quality Assurance Program to meet the criteria of 10 CFR 50, Appendix B, at least once per two years.
i Amendment Nos. 77, 55, 110 251-t y-_,
,c,..
.,,..,..m.--
-,..._-c
.--w.
~
,,y_,
,,3m,,
.m,
,.,.e__,,
.r.,
.w.
.e_
..m...~,.
4 PBAPS 6.6 Reportable Event Action l
l 6.6.1 The following actions shall be taken for, Reportable Events:
~
a.
The Commission shall be notified pursuant to the requirements of Section 50.73 to 10 CFR l
50.
b.
Lich Reportable Event Report submitted to the i
Commission shall be reviewed by the PORC and submitted to the OSR Committee and the
].
Superintendent, Generation Division - Nuclear.
6.7 Safety Limit Violation
{
6.7.1 The following actions shall be taken in the event a i
Sofety Limit is violated:
i a.
The provisions of 10 CFR 50.36 (c) (1) (i) j shall be complied with immediately.
I b.
The Safety Limit violation shall be reported to the Commission, the Superintendent, Generation Divison - Nuclear or, in his absence, the Superintendent, Generation Division - Fossil-Hydro and to the OSR Committee immediaf:ely.
4 c.
A Safety Limit Violation Report shall be f
prepared. 'The report shall be reviewed by the l
PORC.
This report shall describe (1) j applicable circumstances preceding the violation, (2)' effects of the violation upon i
facility components, systems or structures, and (3) corrective action taken to prevent recurrence.
i i
d.
The Safety Limit Violation Report shall be submitted to the Commission, the OSR Committee and the Superintendent, Generation Division -
Nuclear within 14 days of the violation.
I 6.8 Procedures 6.8.1 Written procedures and administrative policies shall be established, implemented and maintained that meet the requirements of Sections b.1 and 5.3 of ANSI N18.7-1972 and Appendix "A" of USAEC i
Regulatory Guide 1.33 (November 1972) except as provided in 6.8.2 and 6.8.3 below.
1
-253-Amendment Nos U, y, y, 110 t
)
-w-.
-,.,,-..,-.-,n
-e-.,
,..-+~--a..n.--
..nr,- - -
-, ~
,.m.,,
D a
\\
PBAPS l
G.9.1 Routine Reports a.
Startup Report A summary report of plant startup and power escalation testing chall be* submitted following (1) receipt of an operating license, (2) amendment to the license involving a planned increase in power level, (3) installation of fuel that has a different design or has been manufactured by a different fuel supplier, and (4) modifications that may have significantly altered the nuclear, thermal or hydraulic performance of the plant.
The report shall address each of the tests identified in the FSAR and shall in general include a description of the measured values of the operating conditions or characteristics obtained during the test program and a comparison of these values with design predictions and specifications.
Any corrective actions that were required to obtain satisfactory operation shall also be described.
Any additional specific details required in license conditions based on other commitments shall be reported in this report.
Startup reports shall be submitted within 90 days following resumption or commencement of commercial full power operation.
b.
Annual Occupational Exposure Tabulation (1)
A tabulation shall be made on an annual basis of the number of station utility and other personnel (including contractors) receiving exposures greater than 100 mrem /yr and their associated man-rem exposure according to work and job function, (2) e.g.,
reactor operations and surveillance, inservice inspection, routine maintenance, special maintenance (describe maintenance), waste processing, and refueling.
This tabulation shall be submitted for the previous calendar year prior to March 1 of each year.
The dose assignment to various duty functions may be estimated based on pocket dosimeter, TLD, or film badge measurements.
Small exposure totalling less than 20% of the individual total dose need not be accounted for.
In the aggregate, at least 80% of the total whole body dose received from external-sources shall be assigned to specific major' job functions.
(1)
A single submittal may.be made for a multiple unit station.
(2)
This tabulation supplements the requirements of 10 CFR 20.407.
-255-Amendment Nos. 77. S7,192.110
m _-... _ _... _ -
,P i,
+
F 3
PDAPS 4i i-I e-f f
1
(
i i
I' i
4 i
4 l
i t
+
]
t 1
1
.?'
a
![
i 4.
}
)
INTENTIONALLY LEFT'DLANK v.
t 1
t 4
i e
4 i^
it I
k'
(.
i i
a r
4 t
i N
Amendment No. 192, 110 t '
-25G-t'
.. _. _ _. _ -.., - -.,, -.. -..., -, -, -... -. -,. ~.. _,, _ -., _. _.....,, -,
-.--_..,.....,,-..,.,,,.._.~,,,,.--r___-,.,,
4 PDAPS
- 6. 9. 2 Unique Renorting Requirements e-i Special reports shall be submitted to the D'irector of the appropriate Regional Office within the time period specified for each report.
These reports shall bc submitted covering the activities idtatified below pursuant to the requirements of the applicable reference specification:
T a.
Loss of shutdown margin, Specification 3.3.A and j
4.3.A within 14 days of the event.
b.
Reactor vessel inservice inspection, Specification 3.6.G and 4.6.G within 90 days of the completion of
.the reviews.
a c.
Report seismic monitoring instrumentation j
inoperable for more than 30 days (Specification 3.15B) within the next 10 working' days.
Submit a seismic event analysis (Specification 4.15D) within i
10 working days of the event.
l d.
Primary containment leak rate testing approximately i
three months after the completion of the periodic integrated leak rate test (Type A) required by i-Specification 4.7. A.2.c.2.
For each periodic test, j
leakage test results from Type A,~B and C tests shall be reported.
B and C tests are local leak rate tests required by Specification 4.7.A.2.f.
i The report shall contain an' analysis and interpretation of the Type A test results and a summary analysis of periodic Type B and Type C tests that were performed since the last Type A test.
1 e.
Calculated dose from release of radioactive effluents, Specification 3.8.B.2, 3.8.B.4, 3.8.C.2, l
3.8.C.3, 3.8.C.6, and 3.8.D.-
f.
Sealed source leakage in excess of limits, Specification 3.13.2.
-257-I j
Amendment Nos. 77, #7, H, 7), JN,110 P
i i
n e
w-
,--,-.--a~
PSAPS G.10 Record Retention e-G.10.1 The following records shall be retained for at least five years:
a.
Records and logs of facility operation covering time interval at each power level.
b.
Records and logs of principle maintenance activities, inspections, repair and replacement of principle items of equipment related to nuclear safety.
c.
Reportable Event Reports required by 10 CFR 50.73.
l d.
Records of surveillance activities, inspections and calibrations required by these Technical Specifications, e.
Records of reactor tests and experiments, f.
Records of changes made to Operating Procedures.
g.
Records of radioactive shipments.
h.
Records of sealed source leak tests and results.
i.
Records of annual physical inventory of all source material of record.
6.10.2 The following recards shall be retained for the duration of the Facility Operating License:
Record and drawing changes reflecting facility a.
design modifications made to systems and equipment described in the Final Safety Analysis Report.
b.
Records of new and irradiated fuel inventory, fuel transfers and assembly burnup histories.
c.
Records of facility radiation and contamination
- surveys, l
-260-Amendment No.
110
I%,
UNITED STATES g
NUCLEAR REGULATORY COMMISSION 5
rj WASHINGTON, D. C. 20555
~s.,
/
PHILADELPHIA ELECTRIC COMPANY PUBLIC SERVICE ELECTRIC AND GAS COMPANY DELMARVA POWER AND LIGHT COMPANY ATLANTIC CITY ELECTRIC COMPANY DOCKET NO. 50-278 PEACH BOTTOM ATOMIC POWER STATION, UNIT NO. 3 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.ll3 License No. DPR-56 1.
The Nuclear Regulatory Comission (the Comission) has found that:
A.
The application for amendment by Philadelphia Electric Company, et al. (the licensee) dated January 4, 1985, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in confonnity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There i onable assurance (i) that the activities authorized by this amt it can be conducted without endangering the health and safety ot,ne public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.
The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-56 is hereby amended to read as follows:
4 s
. f Technical Specifications e-The Technical Specifications contained in Appendices A and B, as revised through Amendment No.ll3, are i
hereby incorporated in the license.
PEC0 shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of its date of issuance.
FOR THE NUCLEAR REGU ATORY COMMISSION
(_
oh iT. Stolz, Chief Op ating Reactors Branch #4 vision of Licensing
Attachment:
Char.ges to the Technical Specifications Date of Issuance: July 17,1985
'l i
}
i 6
0
,,n.-,
1 ATTACHMENT TO LICENSE AMENDMENT NO.113 FACILITY OPERATING LICENSE NO. DPR-56 DOCKET NO. 50-278 Replace the following pages of the Appendix "A" Technical Specifications i
with the enclosed pages. The revised pages are identified by Amendment f,
number and contain a vertical line indicating the area of change.
Remove Insert 7
7 i
i 251 251 253 253 254a 255 1
254b 255 256 256 256a 257 257 260 260 i
4!
i i
I i
3
)
i 1
Y f
i l
. ~, _,. _,
..-c..,..
i-I j
PBAPS l.0 DEFINITIONS (Cont'd) e.-
outage, the required surveillance testing need not be performed j
until the next regularly scheduled outage.
I l
Reportable Event - A reportable event shall be any of those i
conditions specified in Section 50.73 to 10 CFR Part 50.
Run Mode - In this mode the reactor system pressuru is at or above 850 psig and the reactor protection system is energized with APRM protection (excluding the 15% high flux trip) and RBM interlocks in service.
1 l
Safety Limit - The safety limits are limits below which the l
reasonable maintenance of the cladding and primary systems are j
assured.
Exceeding such a limit requires unit shutdown and a
review by the Nuclear Regulatory Commission before resumption of i
unit operation.
Operation beyond such a limit may not in itself result in serious consequences, but it indicates an operational j
deficiency subject to regulatory review.
Secondary Containment Integrity - Secondary Containment integrity 4
means that the reactor building is intact and the following l
conditions are met:
1 i
1.
At least one door in each access opening is closed.
2.
The standby gas treatment is operable.
I 3.
All Reactor Building ventilation system automatic isolat' ion.
valves are operable or deactivated in the isolation position.
4
}
i Shutdown - The reactor is in a shutdown condition when the reactor mode switch is in the shutdown mode position and no core alterations are being performed.
1 i
f Shutdown Mode - Placing the mode switch to the shutdown position initiates a reactor scram and power -to the control rod drives is removed.
Af ter a short time period (about 10 sec), the scram
{
signal is removed allowing a scram reset and restoring the normal i
valve lineup in the control rod drive hydraulic systems also, the mainsteam line isolation scram and main condenser low vacuum scram are bypassed,1f reactor vessel pressure is below 1055 psig.
i
_7..
Amendment No. 7)(, 113 i
4 i
1
., _ - -. _......,. -. ~. ~.. -, -... _ _., _.. -. -... - - - -. _.
PBAPS i
6.5.2.7 Continued d.
Proposed changes in Technical Speciftcations i
or Licenses.
e.
Violations of applicable statutes, codes, regulations, orders, Technical Specifications, license requirements, or of internal procedures or instructions having nuclear safety significance.
f.
Significant operating abnormalities or deviations from normal and expected l
i 1
performance of plant equipment that affect nuclear safety.
g.
Reportable Event Reports required by 10 CFR j
50.73.
h.
Any indication of an unanticipated deficiency j
in some aspect of design or operation of safety related structures, systems, or components, i
1.
Reports and meeting minutes of the Plant Operation Review Committee.
Aud its 6.5.2.8 Audits of facility activities shall be performed under the cognizance of the OSR Committee.
These audits shall encompass:
a.
The conformance of facility operation to provisions contained within the Technical Specifications and applicable license
)
conditions at least once per year.
c b.
The performance, training and qualifications of the entire facility staff at least once per i
year.
c.
The results of actions taken to correct j
deficiencies occurring in facility equipment, structures, systems or method of -operation that affect nuclear safety at least once per i
six months.
i d.
The performance of activities required by the Quality Assurance Program to meet the criteria of 10 CFR 50, Appendix B, at least once per two years.
f Amendment Nos. 77, )),113
-251-f n
e
,n,y
,,,. - - -,. --.-,- - ~,-
ww-me
~. --,~- - -,m
m.
PBAPS 6.6 Reportable Event Action l
6.6.1 The following actions shall be taken for Reportable Events:
e-4 a.
The Commission shall be notified pursuant to the requirements of Section 50.73 to 10 CFR 1
50.
b.
Each Reportable Event Report submitted to the Commission shall be reviewed by the PORC and submitted to the OSR Committee and the Superintendent, Generation Division - Nuclear.
6.7 Safety Limit Violation 6.7.1 The following actions shall be taken in the event a Safety Limit is violated:
t l
a.
The rovisions of 10 CFR 50.36 (c) (1) (i) shal be complied with immediately.
b.
The Safety Limit violation shall be reported to the Commission, the Superintendent, Generation Divison - Nuclear or, in his absence, the Suprintendent, Generation Division - Fossil-Hydro and to the OSR Committee immediately.
i c.
A Safety Limit Violation Report shall be prepared.
The report shall be reviewed by the i
PORC.
This report shall describe (1) applicable circumstances preceding the violation, (2) ef fects of the violation upon facility components, systems or structures, and (3) corrective action taken to prevent recurrence.
d.
The Safety Limit Violation Report shall be submitted to the Commission, the OSR Committee and the Superintendent, Generation Division -
Nuclear within 14 days of the violation.
i 6.8 Procedures 6.8.1 Written procedures and administrative policies shall be established, implemented and maintained that meet the requirements ~of Sections 5.1 and 5.3 of ANSI N18.7-1972 and Appendix "A" of USAEC Regulatory Guide 1.33 (November 1972) except as provided in 6.8.2 and 6.8.3 below, i
1 a
-253-Amendment Nos. hl, 77, J7,ll3 1
i
,~
~
-~
j 1-PBAPS G.9.1 Routine Reports a.
'Startup Report - A summary report of plant startup and power escalation testing shall be submitted following (1) receipt of an operating license, (2) amendment to the license involving a planned increase in power. level, (3) installation of fuel
,l that has a different design or has been
~
manufactured by a different fuel supplier, and (4) modifications that may have significantly altered the nuclear, thermal or hydraulic performance of i
the plant.
The report shall address each of the j
tests identified in the FSAR and'shall in general include a description of the measured values of the operating conditions or characteristics
-obtained during-the test program and a comparison of these values with design predictions and specifications.
Any corrective actions that were required to obtain satisfactory o pration shall I
also be described.
Any additional specific i
details required in license conditions based.on j
other commitments shall be reported in this report.
l Startup reports shall be submitted within 90 days following resumption or commencement of commercial i
full power operation.
b.
Annual Occupational Exposure Tabulation (1) j A tabulation shall be made on an annual basis of the number of station utility and other personnel L
(including contractors) receiving exposures greater than 100 arem/yr and their associated man-
~
j rem exposure according to work and job function, l
(2) e.g.,
reactor operations and surveillance,
. inservice inspection, routine maintenance, special maintenance (describe maintenance), waste processing, and refueling.- This tabulation shall 4
be submitted for the previous calendar year prior i
to March 1 of each year.
The dose assignment to i
various duty functions may be estimated based on I
pocket _ dosimeter,'TLD, or film badge measurements.
4 Small exposure totalling less than 20% of the individual total-dose need not'be accounted for.
In the aggregate, at least 80% of the total whole 4
l body dose received from external sources shall be l
assigned to specific major job functions.
(1)
A single submittal may be made for a multiple unit.
station.
I-l (2)
This tabulation supplements the requirements of 10 j
CFR 20.407.
)
i
-255-Am:ndment Nos. U, g, J g, 113 l
1
-,--+
-rm
PDAPS e-J 1
1 J
INTENTIONALLY.LEFT DLANK f
ra-4 4
1 j
u 1
l
-' Amendment No' J M, 113
-25G-I-
I Y
y 7
y-yvi-mf
.. ~. -
~ '*
PDAPS G.9.2 Unique Reporting Requirements Special reports shall be submitted to the D,irector of the appropriate Regional Office within the time period specified for each report.
These reports shall bc submitted covering the activities identified belou pursuant to the requirements of the applicable reference specification:
a.
Loss of shutdown margin, Specification 3.3.A and
[
4.3.A within 14 days of the event, b.
Reactor vessel inservice inspection, Specification t
3.6.G and 4.6.C within 90 days of the completion of the reviews.
4 c.
Report seismic monitoring instrumentation inoperable for more than 30 days (Specification 3.15B) within the next 10 working days.
Submit a j
seismic event analysis (Specification 4.15D) within i
10 working days of the event.
d.
Primary containment leak rate testing approximately j
three months after the completion of the periodic
~
integrated leak' rate test (Type A) required by j-Speci fication 4. 7. A. 2.c. 2.
For each periodic test, leakage test results from Type A, D and C tests shall be reported.
B'and.C tests.are local leak
{
rate tests required by Specification 4.7.A.2.f.
The report shall contain an analysis and i
interpretation of the Type A test results and a l
summary analysis of periodic Type B and Type C tests that were -performed 'since the last Type A j
test.
e.
Calculated dose from release of radioactive j
effluents, Specification 3.8.D.2, 3.8.B.4, 3.8.C.2,
)
3.8.C.3, 3.8.C.6, and 3.8.D.
f.
Sealed source leakage in excess ~of: limits, l
Specification-3.13.2.
i
-257-4 I
.(
i Amendment Nos. -17, (7, $2, 7J, Jpf, 113 i
(
I s
PBAPS l
l
}
G.10 Record Retention e-G.10.1 The following records shall be retained for,at least five years:
Records and logs of facility operation covering a.
time interval at each power level.
b.
Records and logs of principle maintenance activities, inspections, repair and replacement of principle items of equipment related to nuclear
- safety, c.
Reportable Event Reports required by 10 CPR 50.73.
l d.
Records of surveillance activities, inspections and calibrations required by these Technical Specifications.
e.
Records of reactor tests and experiments.
f.
Records of changes made to Operating Procedures.
g.
Records of radioactive shipments.
h.
Records of sealed source leak tests and results.
i.
Records.of annual physical-inventory of all^ source material of record.
6.10.2 The following records shall be retained for the duration of the Facility Operating License:
Record and drawing changes reflecting facility a.
design modifications made to systems and equipment described in the Final Safety Analysis Report.
b.
Records of new and irradiated fuel inventory, fuel transfers and assembly burnup histories.
I c.
Records of facility radiation and contamination surveys.
l 1
-260-Amendment No.ll3 -
- y